PURPOSE
To inform users about the need to replace Temperature Control switches with a different model.
Compliance Category
O - Optional Identifies changes that may be beneficial to some, but not necessarily all,
operators. Accomplishment is at customer's discretion.
M - Maintenance Identifies maintenance guidelines or best practices for reliable equipment
operation.
C - Compliance Required Identifies the need for action to correct a condition that, if left uncorrected,
may result in reduced equipment reliability or efficiency. Compliance may be
required within a specific operating time.
A - Alert Failure to comply with the TIL could result in equipment damage or facility
damage. Compliance is mandated within a specific operating time.
S – Safety Failure to comply with this TIL could result in personal injury. Compliance is
mandated within a specific operating time.
Timing Code
1 Prior to Unit Startup / Prior to Continued Operation (forced outage condition)
2 At First Opportunity (next shutdown)
3 Prior to Operation of Affected System
4 At First Exposure of Component
5 At Scheduled Component Part Repair or Replacement
6 Next Scheduled Outage
The temperature controller (switch) is used on standard BAC-50 hydrogen dryers for reactivation heater control.
Having dual absorber beds, the BAC-50 is capable of continuous drying service. While one tower is removing moisture
from the hydrogen in the generator, the other bed is being renewed by reactivation.
Capacitor
In the event this temperature controller (switch) fails, the affected heater will not energize and the Lectrodryer may
display a heater failure alarm.
RECOMMENDATIONS
To initiate the replacement process of these temperature controllers (switches), please contact your GE representative
immediately for assistance.
There are no potential safety concerns identified in relation to this concern and the Lectrodryer unit will be restored to
full operation after replacement of the aforementioned temperature controller (switch).
Note:
1) Some Watlow temperature controller (switches) shows LIMIT on front panel (Figure 3).
2) Purging of the dryer with CO2 prior to implementing this TIL is not required
This TIL will be 100% complete once both the temperature controllers (switches) are replaced with the Watlow
configuration switches.
PLANNING INFORMATION
Compliance
Compliance Category: C
Timing Code: 2
Manpower Skills
Customer electrician can change temperature controller in 2 hours.
Parts
Athena Temperature Controller series 16, Model: 16-JF-B-0-00-CY. This is the part that is affected by the issue specified
in this TIL. This item is known on the Lectrodryer parts list as Temperature Indicating Switch (TIS-1, TIS-2), Quantity 2 per
unit, Lectrodryer part# D56120.
Special Tooling
None
© 2014 General Electric Company
This Technical Information Letter contains proprietary information of General Electric Company, USA and is furnished to its customer solely to assist
that customer in the installation, testing, operation and/or maintenance of the equipment described. This document shall not be reproduced or
distributed in whole or in part nor shall its contents be disclosed to any third party without the written approval of GE Power and Water PGS
Engineering. All rights reserved.
Page 3 of 5
TIL 1934
Reference Documents
Instruction manual for LECTRODRYER BAC-50 HYDROGEN DRYING SYSTEM from O&M manual
Previous Modifications
None
Scope of Work
2 hours.
Contact your local GE Service Manager or Contract Performance Manager for assistance or for additional
information.
Contact your local GE Service Manager or Contract Performance Manager in order to update GE unit record sheets
or to submit as-built drawings for changes incurred by this TIL.
NOTE: If you would like to receive future TILs by email, contact your local GE Service Manager or Contract Performance
Manager for assistance.
Email: Email:
Phone: Phone:
FAX: FAX:
Turbine Serial Number(s):
Comments:
NOTE: If there are any redlined drawings that pertain to this TIL implementation, please FAX or Email the drawings
along with this TIL Compliance Record.
FAX this form to: TIL Compliance
FAX: (678) 844-3451
Email: til.compreq@ge.com
Page 1 of 6
FORM NO.: QP-5104
Issue Date 8/30/2013
Approved By: J Dixon
4) Remove the Athena Temperature Controller by releasing the retaining clip on the back of the
control panel door, as shown below.
Install retaining
clip here.
Page 2 of 6
FORM NO.: QP-5104
Issue Date 8/30/2013
Approved By: J Dixon
6) Reconnect the electrical wiring as shown below. Please refer to Figure 2 for more information.
NOTE: Wire color and identifying number/letter may be different than shown. Please refer to the
Lectrodryer wiring diagram specific for your serial number for more information.
Page 3 of 6
FORM NO.: QP-5104
Issue Date 8/30/2013
Approved By: J Dixon
7) Power on the Lectrodryer BAC-50 and verify that both temperature controllers power up and
display the current bed temperature.
IF ANY OF THE ABOVE ARE FOUND TO BE INCONSISTENT WITH THIS INSTRUCTION, AND/OR THE
LECTRODRYER INSTRUCTION MANUAL; PLEASE CONTACT THE LECTRODRYER FACTORY FOR FURTHER
ASSITANCE AT +1 859 624 2091.
Page 4 of 6
FORM NO.: QP-5104
Issue Date 8/30/2013
Approved By: J Dixon
Figure 1
Page 5 of 6
FORM NO.: QP-5104
Issue Date 8/30/2013
Approved By: J Dixon
Figure 2