Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Fusion Work Order Costing

Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

15

Lesson 15: Work Order Costing


Part 4: Manufacturing Costing
Supply Chain Managerial Accounting Course

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.


Objectives

After completing this lesson, you should be able to:


• Describe how data is interfaced from Inventory and
Manufacturing work order execution
• Step through the process of work order cost calculations

Copyright © 2016, Oracle and/or its affiliates. All rights reserved. 15 - 2


Steps for Costing Work Orders

• Ensure that the following scheduled processes are running:


– Transfer Transactions from Production to Costing
– Transfer Transactions from Inventory to Costing
– Create Cost Accounting Distributions (process that costs
transactions and creates distributions)
• Create work orders and report transactions.
• Verify work order costs.
• Verify distributions.

Copyright © 2016, Oracle and/or its affiliates. All rights reserved. 15 - 3


Work Order Charging

Create a standard work order.

Copyright © 2016, Oracle and/or its affiliates. All rights reserved. 15 - 4


Quick Complete Work Order

Perform Quick Complete of the work order that was created to


report material and resource transactions based on the work
definition.

Copyright © 2016, Oracle and/or its affiliates. All rights reserved. 15 - 5


Verifying Transactions in Production

Ensure that all the transactions have been created in Production.

Copyright © 2016, Oracle and/or its affiliates. All rights reserved. 15 - 6


Transfer Transactions to Costing

Production to
Costing

Inventory to
Costing

Copyright © 2016, Oracle and/or its affiliates. All rights reserved. 15 - 7


Running the Create Cost Accounting Distributions
Process

Copyright © 2016, Oracle and/or its affiliates. All rights reserved. 15 - 8


Review Work Order Costs

View summarized
work order costs on
the Review Work
Order Costs User
Interface (UI), or
detailed work order
costs on the View
Detailed Balances UI.

Copyright © 2016, Oracle and/or its affiliates. All rights reserved. 15 - 9


Review Cost Accounting Distributions

Copyright © 2016, Oracle and/or its affiliates. All rights reserved. 15 - 10


Reviewing Variances

• Detailed variances are


calculated for standard
costed products.
• They are calculated when a
work order is closed.
• The variances calculated
include:
– Material Substitution
– Material Usage
– Material Rate
– Resource Substitution
– Resource Usage
– Resource Rate
– Batch Size
– Job Close
• Variances are calculated and
recorded at the cost element
level.

Copyright © 2016, Oracle and/or its affiliates. All rights reserved. 15 - 11


Demonstration: 15-1

• Execute work order cost accounting.

Copyright © 2016, Oracle and/or its affiliates. All rights reserved. 15 - 12


Practice: 15-1

• Execute word order cost accounting.

Copyright © 2016, Oracle and/or its affiliates. All rights reserved. 15 - 13


Summary

In this lesson, you should have learned to:


• Describe how data is interfaced from Inventory and
Manufacturing work order execution
• Step through the process of work order cost calculations

Copyright © 2016, Oracle and/or its affiliates. All rights reserved. 15 - 14

You might also like