EL Material Part II
EL Material Part II
EL Material Part II
Law of Environment
Study Material
Part -II
Compiled By
Dr.Aman Deep Singh
RMLNLU
WATER POLLUTION CONTROL
Objectives:
Water pollution is one of the major problems facing the humanity. There
are various causes of water pollution. Industrial effluent directly
entering into a stream or through a municipal sewer or through
discharge on land meant for irrigation results in water pollution. The
term ‘streams’ includes:
(i) river;
(iv) sub-terranean waters; and or tidal waters to such extent or, as the
case may be, to such point as the State Government may, by
notification in the Official Gazette specify, in this behalf.
However, the major source of water pollution comes from community
wastes from human settlements. Most of these wastes are discharge of
animals or plants or of aquatic organisms1. Things stored on land, for
example, raw material, solid refuse of a mine or quarry on land may
cause pollution by rain, washing it into stream. Interestingly, air
pollutant may also cause water pollution. Especially, the metal
pollution in lakes (from metals like cadmium, mercury, lead etc)
results mainly due to air borne pollutants emanating from combustion
of coal. Moreover, the use of pesticides for agriculture also results in
water pollution due to rain water washing it into a stream.
1. to provide for the prevention and control of water pollution and the
maintaining or restoring of wholesomeness of water (in the stream or
well or sewer or land);
2. to establish Central and State Boards for the prevention and control of
water pollution:
3. for conferring on and assigning to such Boards powers and functions
relating thereto and for matters connected therewith.
‘Pollution’ means:
Such contamination of water or such alteration of the physical,
chemical or biological properties of water or such discharge of any
sewage or trade effluent or any other liquid, gaseous or solid
substance into water (whether directly or indirectly) as may, or is
likely to, create a nuisance or render such water harmful or injurious
to public health or safety, or to domestic, commercial, industrial,
agricultural or other legitimate uses, or to the life and health of
animals or plants of aquatic organisms2.
1
. Section 2(j) Water (Prevention and Control of Pollution) Act
1974.
2
. Section 2 (e) Water (Prevention and Control of Pollution) Act
1974.
‘Sewage effluent’3 means:
The Water (Prevention and Control of Pollution) Act establishes the Central
and State Boards for the prevention and control of water pollution4.
3
. Section 2 (g) Water (Prevention and Control of Pollution) Act
1974.
4
. Section 3 and 4 of Water (Prevention and Control of Pollution) Act
1974.
(2) The Central Board shall consist of the following members, namely:
(a) Substituted by section 3, Act 53 of 1988, for ‘Central Board for the Prevention
and Control of Water Pollution’ (wef 29 September 1988).
(ii) co-ordinate activities of the State Boards and resolve disputes among
them6;
(iii) provide technical assistance and guidance to State Boards, carry out and
sponsor investigations and research relating to problems of water
(3) The Central Board shall be a body corporate with the name
aforesaid having perpetual succession and a common seal with power,
subject to the provisions of this Act, to acquire, hold and dispose of
property and to contract, and may, by the aforesaid name, sue or be
sued.
The Central Board also performs the functions of a State Board for the
Union Territories. In case of conflict of authority between the Central Board
and the State Board, the authority of the Central Board prevails over the
authority of the State Board. The Central Board is attached to the Union
Government’s Department of Environment, Forests and Wild life.
(3) Every State Board shall be a body corporate with the name
specified by the State Government in the notification under sub-section
(1), having perpetual succession and a common seal with power, subject to
the provisions of this Act, to acquire, hold and dispose of property and to
contract, and may, by the said name, sue or be sued.
Provided that in relation to any Union territory the Central Board may
delegate all or any of its powers and functions under this sub-section to
such person or body of persons as the Central Government may specify.
5
.Section 16 of the Water (Prevention and Control of Pollution) Act
1974 states: Functions of Central Board.—(1) Subject to the
provisions of this Act, the main function of the Central Board shall
be to promote cleanliness of streams and wells in different areas of
the States.
(iv) to lay down, modify or annul effluent standards for the sewage
or trade effluents12;
(b) co-ordinate the activities of the State Boards and resolve disputes
among them;
(f) collect, compile and publish technical and statistical data relating
to water pollution and the measures devised for its effective prevention
and control and prepare manuals, codes or guides relating to treatment
and disposal of sewage and trade effluents and disseminate information
connected therewith;
Provided that different standards may be laid down for the same stream
or well or for different streams or wells, having regard to the quality of
water, flow characteristics of the stream or well and the nature of the use
of the water in such stream or well or streams or wells;
(vii) to evolve efficient methods of disposal of sewage and trade
effluents on land15;
perform its functions under this section efficiently, including the analysis
of samples of water from any stream or well or of samples of any
sewage or trade effluents.
6
. Section 16 (2)(b).
7
. Section 16 (2)(c).
8
. Section 16 (2)(e).
9
. Ibid., Section 17 (l)(a).
10
.Section 17 states: Functions of State Board.—(1) Subject to the
provisions of this Act, the functions of a State Board shall be—
In case, the Central Government is of the opinion that the State Board
has defaulted in complying with any directions given by the Central
Board and as a result of such default, a grave emergency has arisen and
it is necessary or expedient so to do in the public interest, it may direct
the Central Board to perform any of the functions of the State Board20.
In addition, the State Board possesses other important powers also.
(f) to inspect sewage or trade effluents, works and plants for the treatment of
sewage and trade effluents and to review plans, specifications or other data relating to
plants set up for the treatment of water, works for the purification thereof and the
system for the disposal of sewage or trade effluents or in connection with the grant of
any consent as required by this Act;
(g) to lay down, modify or annul effluent standards for the sewage and trade
effluents and for the quality of receiving waters (not being water in an inter-State
stream) resulting from the discharge of effluents and to classify waters of the State;
streams or wells;
(ii) requiring any person concerned to construct new systems for the
disposal of sewage and trade effluents or to modify, alter or extend any
such existing system or to adopt such remedial measures as are
necessary to prevent, control or abate water pollution;
(n) to advise the State Government with respect to the location of any
industry the carrying on of which is likely to pollute a stream or well;
Any liquid, gaseous or solid substances which are discharged from any
premises used for carrying on any p[industry operation or process or treatment
and disposal system] other than domestic sewage.
The State Board is also entrusted with the work of laying down
standards of treatment of sewage and trade effluents to be discharged
into any particular stream taking into account the minimum fair
weather dilution available in that stream and the tolerance limits of
pollution permissible in the water of the stream, after the discharge of
such effluents. The State Board has the power of making application to
the courts for restraining the apprehended pollution of water in stream
or well. The Supreme Court observed that notwithstanding the
comprehensive provisions contained in the Act, no effective steps
appear to have been taken by the State Board to prevent the discharge
of effluents into river Ganga. The Court further pointed out that the
fact that the effluents were first discharged into the municipal sewerage
would not absolve the tanneries from being proceeded against because
ultimately the effluents reached the river Ganga from the sewerage
system of the municipality.
Environment includes:
Water, air and land and the inter-relationship which exists among and
between water, air and land and human beings, other living
creatures, plants, micro-organism and property.
The Supreme Court observed that not much had been done even by
the Central Government under the Environment (Protection) Act 1986,
to stop the grave public nuisance caused by the tanneries.
The Court held that having regard to the adverse effects of the
effluents on the river water, the tanneries should at least set up the
primary treatment plants. It was submitted that the cost of pre-
treatment plant for ‘A’ class-tannery would be rupees 368000, the cost
of plant for class ‘B’ tannery would be rupees 230000 and the cost of
the plant for ‘C’ class-tannery would be rupees 50000. The Court
emphatically stated that the cost did not appear to be excessive. The
Supreme Court stated in the present case, the tanneries involved were
not taken by surprise because for several years, they were being asked
to take necessary steps to prevent the flow of untreated waste from their
factories into the river. Some of the tanneries complied with the
demand and installed treatment plants whereas others took the plea
based on financial constraints. The Court, therefore, issued directions
for the closure of those tanneries which failed to take the minimum
steps required for the primary treatment of the industrial effluents. The
Court expressed consciousness that the closure of tanneries may bring
unemployment, loss of revenue, but life, health and ecology have
greater importance to the people. The Court directed the Central
Government, the UP Pollution Control Board established under the
Water (Prevention and Control of Pollution) Act 1974 and the District
Magistrate, Kanpur to enforce the order faithfully. The Court held:
The Supreme Court noted that the construction of certain works has
been undertaken under the Ganga Action Plan at Kanpur in order to improve
the sewerage system and to prevent pollution of the water in river Ganga.
However, the affidavits filed by the authorities in this case reveal that the
works are going on at snail’s pace. In order to control and prevent the
pollution of water in the river Ganga at Kanpur, the Supreme Court issued
certain directions for compliance by the Kanpur municipality and other
authorities. These directions have been summarised as under:
Where the Central Government is of the opinion that under State Board
has defaulted in complying with the directions given by the Central
Board under sub-section (1) and as a result of such default, a grave
emergency has arisen and it is necessary or expedient so to do in the
public interest, it may by order, direct the Central Board to perform any
of the functions of the State Board in relation to such area for such
period and for such purposes, as may be specified in the order.
Thus, the State Government has the power to designate any area or
areas within a State as water pollution control area or areas after
consultation with the State Board or on the recommendation of the
State Board. The State Government may also alter by way of extension
or reduction any pollution control area or areas by notification in the
Official Gazette.
Section 20 of the Act deals with the power of the State Board to obtain
information required for the performance of its functions.
Section 17(2) of the Water (Prevention and Control of Pollution) Act 1974 states:
Functions of State Board – The Board may establish or recognise a laboratory or
laboratories to enable the Board to perform its functions under this section efficiently,
including the analysis of samples of water from any stream or well or of samples of
any sewage or trade effluents.
26
. Ibid., Section 21 (4).
(a) serve on the person in charge of, or having control over, the plant
or vessel or in occupation of the place (which person is hereinafter
referred to as the occupier) or any agent of such occupier, a notice, then
and there in such form as may be prescribed of his intention to have it so
analysed;
(b) in the presence of the occupier or his agent, divide the sample
into two parts;
recognised by the Central Government in case of Union Territory or the
laboratory recognised by the State Government in case of State27. In such a
case, the person taking the sample shall also inform the Government analyst in
writing about the willful absence of the occupier28.
In a case where the sample is taken for analysis, the occupier is served a
notice but if the occupier does not make a request for division of the sample
into two parts, the sample shall be placed in a container which shall be
marked, sealed and signed by the person taking the sample29. The said
container shall be sent for analysis to the laboratory recognised by the Central
Board in case of Union Territory or the State Board in case of State.
(i) in a case where such sample is taken from any area situated in a
Union territory, to the laboratory established or recognised by the
Central Board under section 16; and
(e) on the request of the occupier or his agent, send the second
container,—
(i) in a case where such sample is taken from any area situated in a
Union territory, to the laboratory established or specified under sub-
section (1) of section 51; and
The procedure for the collection of the sample of sewage or trade effluent
sub-section (1) or sub-section (2), as the case may be, of section 53, in
writing about the wilful absence of the occupier or his agent; and
(b) the cost incurred in getting such sample analysed shall be payable
by the occupier or his agent and in case of default of such payment, the
same shall be recoverable from the occupier or his agent, as the case may
be, as an arrear of land revenue or of public demand:
Provided that no such recovery shall be made unless the occupier or,
as the case may be, his agent has been given a reasonable opportunity of
being heard in the matter.]
(5) When a sample of any sewage or trade effluent is taken for analysis
under sub-section (1) and the person taking the sample serves on the
occupier or his agent a notice under clause (a) of sub-section (3) and the
occupier or his agent who is present at the time of taking the sample does
not make a request for dividing the sample into two parts as provided in
clause (b) of sub-section (3), then, the sample so taken shall be placed in a
container which shall be marked and sealed and shall also be signed by the
person taking the sample and the same shall be sent forthwith by such
person for analysis to the laboratory referred to in sub-clause (i) or sub-
clause (ii), as the case may be, of clause (d) of sub-section (3).
27
. Ibid.
28
. Ibid.
29
. Section 21 (5).
30
. Section 22 (1).
Section 23 of the Act confers wide powers on the State Board to enter and
inspect any place to ensure compliance with the Act. The power extends
even to seizure of the records from any undertaking. The State Board has the
power to authorise any person to enter and inspect any place for the purpose
of performance of any of the functions of the Board or determining whether
the provisions of the Act are being complied with34. Such authorised person
has the right to enter with the assistance necessary for the purpose of
may be.
(2) On receipt of the report under sub-section (1), one copy of the report shall be
sent by the Central Board or the State Board, as the case may be, to the occupier or
his agent referred to in section 21, another copy shall be preserved for production
before the court in case any legal proceedings are taken against him and the other copy
shall be kept by the concerned Board.
(3) Where a sample has been sent for analysis under clause (e) of sub-section (3) or
sub-section (4) of section 21 to any laboratory mentioned therein, the Government
analyst referred to in that sub-section shall analyse the sample and submit a report in the
prescribed form of the result of the analysis in triplicate to the Central Board or, as the
case may be, the State Board which shall comply with the provisions of sub-section (2).
(5) Any cost incurred in getting any sample analysed at the request of the occupier
or his agent shall be payable by such occupier or his agent and in case of default the same
shall be recoverable from him as arrears of land revenue or of public demand.
31
. Ibid., Section 22 (3).
32
. Ibid., Section 22 (4).
33
. Ibid., Section 22 (2).
34
. Ibid., Section 23 (1)(a) and Section 23 (1)(b).
(a) for the purpose of performing any of the functions of the Board entrusted to him;
examining any plant, record, register, document or any other material object
or for conducting a search of any place in which he has reason to believe that
an offence under this Act or the rules made thereunder has been or is being or
is about to be committed and for seizing any such plant, record, register,
document or other material object, if he has reason to believe that it may
furnish evidence of the commission of an offence punishable under this
Act or the rules made thereunder. The relevant provisions of the Criminal
Procedure Code shall apply to the search or seizure conducted under this
Act.
Section 24 of the Act prohibits the use of stream or well for disposal of
polluting matter sub-section (1) provides.
However, the Government has the power to exempt any person from
the operation of the above prohibitory clause by notification in the
Official Gazette.
(b) for the purpose of determining whether and if so in what manner, any such
functions are to be performed or whether any provisions of this Act or the rules made
thereunder or any notice, order, direction or authorisation served, made, given, or granted
under this Act is being or has been complied with;
35
. AIR 2002 SC 1515. Earlier orders passed by the Supreme Court
have been reported as (1997) 1 SCC 388; AIR 2000 SC 1997.
(s) Substituted by section 11, Act 53 of 1988 for ‘stream or well’ (wef 29
September 1988).
constructions made by the Span Motels (P) Ltd, on the riverbed and on
the banks of the river Beas which not only resulted in the pollution of
the river but constituted an onslaught on the fragile environment and
ecology of Manali in the State of Himachal Pradesh. The Supreme
Court also found that the Motel by constructing walls and bunds on the
river banks and in the riverbed has interfered with the flow of the river.
While the Court was conscious of the violation of section 24 of the
Water (Prevention and Control of Pollution) Act and non compliance
with section 3 of the Environment (Protection) Act, the Court preferred
to desist from pronouncing on the issue of the violation of these
provisions in a writ petition filed under article 32 of the Constitution of
India. The Court reaffirmed its earlier ruling that pollution is a civil
wrong – a tort committed against the community as a whole and
therefore, a person guilty of causing pollution has to pay damages
(compensation) for the restoration of environment and ecology as well
as compensation of those who suffered loss on account of the act of the
offender. The Court also reaffirmed that it had the power to award not
only damages but even exemplary damages in a writ petition or public
interest litigation but had no power to impose punishment by way of
fine or imprisonment which would be possible only after trial of the
offender. After holding Himachal Pradesh Government guilty of
committing patent breach of public trust by leasing the ecological
fragile land to the motel, the Court held that the ‘polluter pays
principle’ with liability for harm to compensate not only the victims of
pollution but also the cost of restoring the environmental degradation
and reversing the damaged ecology would be applicable in this case.
The Motel, by constructing walls and bunds on the river banks and in
the riverbed, has been held to have interfered with the flow of the river
and therefore, the liability of the motel would be an inevitable
consequence of polluter pays principle. The Supreme Court exercised its
power to award exemplary damages which were fixed at rupees ten
lakhs. The Court further stated that the question relating to the quantum
of liability for damages on the polluter pays principle, as has been held
by the Court against Span Motels (P) Ltd would be determined
separately. The Court did not consider the question of imposition of
imprisonment and fine provided under various laws to prevent and
control pollution in the present proceedings which were initiated by
way of writ petition.
First, the consent referred to in sub-section (1) shall not have been
given or refused earlier; secondly, period of four months ought to have
expired after making of the application; and thirdly, the application of the
applicant should be complete in all respects. On the existence of these
conditions, the permission is deemed to have been given unconditionally.
The Act provides for stiff penalties for the violation of sections 24,
25 and 26 which shall be punishable with imprisonment for a term
which shall not be less than one year and six months but which may
extend to six years and with fine.
The petitioners argued that there was deemed consent by the Board
under section 25 (7) of the Act and therefore, the impugned order was
void and without jurisdiction. The petitioners submitted that they had no
occasion to make known their stand before the Board as the notice
contemplated under section 25 of the Act in terms of rule 33 was not
issued to them. It was also submitted that the finding recorded by the
Appellate Authority in its order that the application of the petitioners
was not complete in all respects was totally unfounded.
Two issues arose in this case: (1) whether there was ‘deemed consent’
of the Board within the meaning of sub-section (7) of section 25 of the
Water (Prevention and Control of Pollution) Act; (2) whether the Board
even in the face of deemed consent could still refuse the grant of
permission under section 25 of the Act.
The claim of the petitioners that there was deemed consent in the
present case was based on section 25 (7) of the Water (Prevention and
Control of Pollution) Act. It provides that the applicant has to satisfy
that the three factors must exist to enable him to claim the benefit
under the said provision. The three factors are:
(1) the consent referred to in sub-section (1) shall not have been
given or refused earlier;
(2) a period of four months ought to have expired after making of the
application; and
(3) the application should be complete in all respects.
The facts of the present case reveal that the petitioners moved an
application for the grant of consent before the Board on 27 November
1999 and the Board passed order of refusal on 9 June 2000. The Board
passed order of refusal after six months, much after the deadline
prescribed under section 25 (7) of the Act. However, the Appellate
Authority rejected the appeal of the petitioners on the ground that the
application of the petitioners was not complete in all respects and
therefore, section 25 (7) would not come into play at all. The High
Court of Karnataka did not accept the observation of the Appellate
Authority that the application of the petitioners was not complete in all
respects. The High Court pointed out that right from the time of
presentation of the application till its refusal by the Board, nowhere
there was any reference either by the Board or by any other authority
with regard to the application being not complete in any respect. The
Court further stated that even in the letter dated 9 June 2000, by which
the permission was refused by the Board, the reasons given thereunder
did not mention the incomplete application as one of the grounds for
rejection of the application. The High Court expressed surprise over
the manner in which the Appellate Authority found that the application
was not complete in all respects and that the application became
complete for all purposes on 6 March 2000, when according to the
Appellate Authority, the site was inspected. The High Court found that
the date of inspection was also mentioned wrongly by the Appellate
Authority. The High Court held that the Appellate Authority had
proceeded on wrong assumption that the relevant date for calculating
the statutory period of four months would be from the date of
inspection and not from the date of presentation of the application. The
finding of the Appellate Authority was held to be bad both in law and
on facts. The High Court held that when the Board itself in its order
while refusing the permission did not mention the aspect of application
being not complete in all respects, it was not open for the Board or
even the Appellate Authority sitting in judgment over the order of the
Board to turn around and make out a new case altogether and reinforce
the order with any fresh reason which originally was not made a
ground for deciding the issue. Accordingly, it was held that there was
deemed consent in the present case.
The second issue was whether the Board even in the face of deemed
consent in favour of the petitioner could still refuse the grant of
permission under section 25 of the Act. The issue involves several
questions relating to environment protection and the changing
environmental concepts which have given rise to precautionary principle,
polluter pays principle and above all sustainable development which
provides a via media to eradicate poverty and improve the carrying
capacity of the supporting ecosystems.
The present case did not involve the application of ‘polluter pays
principle’ because the hospital was still in the stage of inception. The
hospital not having commenced operations, the issue of grant of
consent would involve the applicability of precautionary principle. The
‘precautionary principle’, as a legal concept, has evolved in the
international environmental law and has now emerged as the law
governing the matters of environment and finds expression in articles
47, 48A and 51A(g) of the Constitution of India. The concept has now
come to be recognised as a part of the domestic law in India. The new
concept places the burden of proof on the developer to show that
establishment of an industry would not expose the environment to
serious or irreversible environment damage. In AP Pollution Control
Board v MV Nayudu38, the Supreme Court held that if an industry
poses ‘uncertain but non-negligible’ risks, then regulatory action is
justified. This will lead to the question as to what is ‘non-negligible
risk’? In such a case, the burden of proof is to be placed on those
attempting to alter the status quo. They are to discharge this burden by
showing the absence of a ‘reasonable ecological or medical concern’.
That is the required burden of proof. The result would be that if
insufficient evidence is presented by them to alleviate concern about the
level of uncertainty, then the presumption should operate in favour of
environmental protection.
The question in the present case would be whether the petitioner had
the opportunity to discharge the burden and present the evidence to
alleviate the concern about the level of uncertainty? To find the answer,
the Karnataka High Court examined the sequel of events that transpired
between the presentation of the application and its ultimate refusal by
the Board. The High Court pointed out that in all the circumstances of
the present case, the petitioner was never called upon nor was he
provided any opportunity to dispel any reasonable apprehension that
the Board may have had about the potential danger that the industry
would have caused. When it can be reasonably said that the
establishment of the hospital does pose an ‘uncertain’ risk to the
environment, it cannot be said applying the same yardstick of
‘reasonableness’ that the potential risk is negligible or non-negligible.
The Apex Court has pronounced that there must be some ‘non-
negligible’ potential damage to environment if the permission sought
could be refused. The Karnataka High Court was of the view that the
principle of ‘sustainable development’ would come into play in the
present case. Hospital being essential to improve quality of human life
should be permitted to be established subject to ensuring the carrying
capacity of the supporting ecosystem. In the present case, the area
concerned was not declared as a sensitive area by publication of the
required notification. The petitioners had the benefit of deemed
consent and it was not possible to ascertain any potential non-
negligible danger to the environment which would call for the
applicability of the precautionary principle. There was hardly anything
to show that the mandate of sustainable development was not complied
with. Moreover, the Board was not powerless in the matter because the
petitioners had already started the construction of medical college and
the hospital and had spent huge money. The Board could always resort
to sub-section (5) of section 25 to ensure that no ‘non-negligible
danger’ is caused to the environment by establishment of the college
and hospital.
ENVIRONMENTAL COURTS
PRECAUTIONARY PRINCIPLE
43
. Ibid. at 982.
In this case, the Supreme Court traced the evolution of ‘precautionary
principle’, explained the principle in depth and held the principle as a
part of international customary law. The Supreme Court affirmed
Vellore’s holding wherein ‘polluter pays principle’ as well as
‘precautionary principle’ have been held by the court as international
customary norms and also principles of our domestic law.
The Supreme Court noticed that the leather industry of India became
44
. AIR 1996 SC 2715.
a major foreign exchange earner and Tamil Nadu was the leading
exporter of finished leather accounting for about 80 per cent of the
country’s export. Though the leather industry was of vital importance
to the country as it generated foreign exchange and provided
employment avenues, it had no right to destroy the ecology, degrade
the environment and pose as a health hazard. It could not be permitted
to expand or even to continue with the present production unless it
tackled by itself the problem of pollution created by the said industry.
SUSTAINABLE DEVELOPMENT
The Supreme Court also discussed the rule of absolute liability for
pollution caused by handling of hazardous substances as evolved in
Shriram Foods and Fertilizers case and applied the principle to the
facts of this case. The Supreme Court also examined the provisions of
the Environment (Protection) Act 1986.
ENVIRONMENTAL AUDIT
State Board shall not grant its consent under sub-section (4) of section 25 for
the establishment of any industry, operation or process, or treatment and
disposal system or extension or addition thereto, or to the bringing into use
of a new or altered outlet unless the industry, operation or process, or
treatment and disposal system or extension or addition thereto is so
established as to comply with any conditions imposed by the Board to
enable it to exercise its right to take samples of the effluent.
A State Board may from time to time review any condition imposed
under section 25 or section 26 and may serve on the person to whom the
consent under section 25 or section 26 is granted a notice making any
reasonable variation of or revoking any such condition.
4. Appeals
Section 28 provides for an appeal against the order of the State Board
made under sections 25, 26 or 27. The State Government has the power
to constitute the Appellate Authority which shall consist of single person
or three persons who shall be appointed by the State Government46. The
qualification of the persons to be appointed as members of the
Appellate Authority which has the power to hear appeals against the
orders of the State Board made under sections 25, 26 or 27 has not been
clearly spelt out and is left to the wisdom of the State Government. In
AP Pollution Control Board v MV Nayudu47, the Supreme Court pointed
out that Appellate Authority under section 28 in Andhra Pradesh as per
the notification of the AP Government consisted of a retired High
Court Judge and there was nobody to help him on technical matters,
46
. Section 28, (1) and (2) of the Water (Prevention and Control of
Pollution) Act 1974.
47
. AIR 1999 SC 812.
V. REVISION
The State Government has the power to revise the decision of the State
Board made under section 25, 26 or 27. Sub-section (1) of section 29
provides that:
The State Government may at any time either of its own motion or
on an application made to it in this behalf, call for the records of any
case where an order has been made by the State Board under section
25, 26 or 27 for the purpose of satisfying itself as to the legality or
propriety of any such order and may pass such order in relation
thereto as it may think fit.
Provided that ‘the State Government shall not pass any such order
under this sub-section without affording the State Board and the
person who may be affected by such order a reasonable opportunity
of being heard in the matter.
The State Government shall not revise any order made under section
25, 26 or 27 where an appeal against that order lies to the appellate
authority but has not been preferred or where an appeal has been
preferred such appeal is pending before the appellate authority.
49
.Section 33 states: Power of Board to make application to courts for
restraining apprehended pollution of water in streams or wells – x[(1)
Where it apprehended by a Board that the water in any stream or well
empowers the State Board to move an application to the court of
Metropolitan Magistrate or Judicial Magistrate of first class for
restraining the polluter from polluting activity in case of apprehension
by the State Board of the pollution of water in any stream or well or
sewer or land as a result of such polluting activity of the polluter. The
power to obtain the restraint order of the court is confined only to the
Board and excludes any other person, organisation or authority. Sub-
section (2) of section 33 of the Act further clarifies that the court may
make such order as it deems fit.
(3) Where under sub-section (2) the court makes an order restraining
and person from polluting the water in any stream or well, it may in that
order–
(i) direct the person who is likely to cause or has caused the pollution
of the water in the stream or well, to desist from taking such action as is
likely to cause pollution or, as the case may be, to remove from such
stream or well, such matter, and
(ii) authorise the Board, if the direction under clause (i) (being direction
for the removal of any matter from such stream or well) is not complied
with by the person to whom such direction is issued, to undertake the
removal and disposal of the matter in such manner as may be specified by
the court.
(x) Substituted by section 17, Act 53 of 1988 for sub-section (1) (wef 29
September 1988).
(i) to the polluter to desist from polluting activity or to remove the
polluting matter from polluted stream or well;
Finally, the High Court of Delhi accepted the petition and set aside
the impugned order of the Magistrate.
The Supreme Court rejected the plea of the Municipality that it had
no financial resources to perform its statutory duties. The Supreme
Court stated that the Municipality could not take the plea that
notwithstanding the public nuisance, financial inability exonerated it
from statutory liability. A responsible Municipality constituted for the
precise purpose of preserving public health cannot run away from its
public duty by pleading financial inability. The Supreme Court
vehemently hammered out the proposition that budgetary constraints
did not absolve a Municipality from performing its statutory duty. The
Supreme Court held that where there existed a public nuisance in a
locality, the court could require the Municipality to abate the nuisance
by taking affirmative action on a time bound basis.
The Supreme Court also viewed the problem of people living within
the limits of Ratlam Municipality as the problem of enforcement of
their human rights. In the opinion of the Supreme Court, decency and
dignity are non-negotiable facets of human rights and are a first charge
on local self governing bodies. Therefore, the Supreme Court pointed
out that providing drainage system, not pompous and attractive but in
working condition sufficient to meet the needs of the people, cannot be
evaded if the Municipality is to justify its existence.
It is worth noticing that the Supreme Court did not even refer to the
issue of the effect of the Water (Prevention and Control of Pollution)
Act on section 133 of the Criminal Procedure Code (CrPC). The
assumption of jurisdiction over the case under section 133 of CrPC
implies that the Water (Prevention and Control of Pollution) Act is no
bar for initiation of proceedings under section 133 of CrPC in cases
covered under the Water (Prevention and Control of Pollution) Act.
The counsel for the petitioners submitted that the Water (Prevention
and Control of Pollution) Act 1974, is a complete code in itself in the
matter of prevention and control of water pollution. It provides for
measures to control water pollution and devises machinery for the
implementation of the objects of the Act and provides for the
punishment of those who indulge in water pollution. Therefore, it is
contended that the provisions of section 133, CrPC insofar as they
relate to water pollution must be deemed to have been impliedly
repealed.
The preamble of the Water Act makes it clear that it has been enacted to
provide for the prevention and control of water pollution and maintain
and restore the wholesomeness of water and to establish Boards to
ensure these purposes. The purpose behind section 133 (l)(b) of CrPC
insofar as it relates to water is also the same. Of course, this provision
covers a wide area and range but it takes in pollution of water also which
is the area and range specially covered by the Water Act. While
section 133 CrPC contemplates inquiry by the Executive Magistrate
into complaints of pollution and measures being taken by the
Magistrate to obviate such pollution or nuisance, the Water Act
confers such powers in the first instance on the State Pollution
Control Board and also on the Judicial Magistrate. The scope of the
power so conferred is much wider than that conferred by the Water
Act. The only difference pointed out by the respondent is that while
under section 133 CrPC it is open to a citizen to directly approach an
Executive Magistrate, he is unable to approach directly a judicial
magistrate under the Water Act. But that would make no difference
since under the provisions of the Water Act, it is open to a citizen
concerned to approach the State Board with his grievance and it is
open to the State Board to take such measures as are contemplated in
the Act including filing petition before a judicial magistrate. All the
remedies which could be provided by the Executive Magistrate
under section 133 of CrPC could certainly be provided by the
authorities under the Water Act. The Water Act is a special statute
while the provisions of section 133 of CrPC are of a general nature. In
regard to pollution of water by effluents, the Water Act is a complete
code in itself and if these two provisions are to co-exist, that would
certainly be causing inconvenience, if not conflict of jurisdiction.
There is no reason to assume that while the Executive Magistrate
could move expeditiously, the State Board could not do so. On the
other hand, the State Board which has considerable expertise and
requisite machinery in aid of its functions can certainly be expected to
move purposefully and fruitfully in the case of water pollution.
In view of the above observations, the Court held that the provisions
of the Water (Prevention and Control of Pollution) Act, by implication,
repeal the provisions of section 133 of CrPC insofar as they relate to
prevention and control of water pollution. Therefore, the Executive
Magistrate was held to have no jurisdiction to deal with the case under
section 133 of the Criminal Procedure Code. Accordingly, the
proceedings before the SDM were quashed.
The High Court pointed out that the express legislative mandate
regarding previous sanction cannot be permitted to be whittled down by
labeling the act complained of as offence not under the special act but
under the IPC. The prosecution of an act which is an offence under the
special act, by an agency other than the competent Board, on the
ground that it is also an offence under the IPC can be characterised as
colourable because the offences under the special Acts are graver ones
and labeling the act as IPC offence is just to evade the requirements of
previous sanction under the special Acts.
The Water Act and the Air Act are special Acts brought on the statute
book and constitute complete code for prevention and control of water
and air pollution by any trade or industry. It has expressly been
mandated therein that notwithstanding anything inconsistent therewith
contained in any enactment other than the Acts, their provisions have to
prevail. Inconsistent provisions in any other Act cannot be permitted to
come in the way of the provisions of the special Acts and defeat them.
In view of the express provisions in section 60 of the Water Act and
section 52 of the Air Act, the provisions of Indian Penal Code, General
Clauses Act and the Criminal Procedure Code stand repealed to the
52
. 1989 Criminal Law Journal 2013.
extent of inconsistency.
The High Court finally dismissed the petition holding that the SDM
was right in holding that he had no jurisdiction to proceed with the
matter which is in relation to acts which constitute offences under the
Water (Prevention and Control of Pollution) Act and the Air
(Prevention and Control of Pollution) Act.
The approaches adopted by the High Courts are not based on sound
considerations. Under section 33 of the Water (Prevention and Control
of Pollution) Act, the Pollution Control Boards have the jurisdiction to
move the Judicial or Metropolitan Magistrate for an injunctive relief.
An individual or a voluntary organization does not have locus standi
under section 3 of the Water Act to move the court. In 1988, the Water
(Prevention and Control of Pollution) Act was amended and citizen suit
provision was inserted. However, under citizen suit provision, a citizen
has to serve 60 days notice before moving the court. This considerably
mitigates the punitive effect of the enforcement mechanisms of the
Water (Prevention and Control of Pollution) Act. Any attempt to
restrict the scope of section 133 of CrPC on the basis of section 33 of
53
. 1987 Criminal Law Journal 2071.
the Water (Prevention and Control of Pollution) Act will deprive the
citizens from bringing an action against the polluter. Such an attempt
would nullify the spirit of the Water (Prevention and Control of
Pollution) Act which is passed to prevent and abate the water pollution.
Moreover, there is no inconsistency between section 33 of the Water
(Prevention and Control of Pollution) Act and section 133 of the CrPC.
Both are mutually supportive and can operate in their respective
spheres. If State Pollution Control Board fails to discharge its duty to
prevent water pollution, an individual has the power to file a complaint
before Executive Magistrate under section 133 of the CrPC or before
Metropolitan Magistrate under citizen suit provision after serving 60
days notice to the Board.
Section 33A54 has been introduced in the Water (Prevention and Control
of Pollution) Act by way of amendment. It empowers the State Board
to issue directions to any person, officer or authority, including orders to
close, prohibit or regulate any industry, operation or process and to stop
or regulate the supply of water, electricity or any other service. Before
the 1988 amendment, the State Board could issue the restraint or
prohibitory orders under section 32 only to the polluters and not the
government officials or other parties. Moreover, section 32 empowered
the State Board to issue such orders only in case of pollution resulting
from an accident or other unforeseen act or event. However, the power
of the State Board to give directions under section 33A of the Act is
subject to any directions that the Central Government may give in this
behalf.
54
.Section 33A states: y[Power to give directions – [notwithstanding
anything contained in any other law, but subject to the provisions of
this Act, and to any directions that the Central Government may give
in this behalf, a Board may, in the exercise of its powers and
performance of its functions under this Act, issue any directions in
writing to any person, officer or authority, and such person, officer or
authority shall be bound to comply with such directions. – Explanation
– For the avoidance of doubts, it is hereby declared that the power to
issue directions under this section includes the power to direct - (a) the
closure, prohibition, or regulation of any industry, operation or
process; or (b) the stoppage or regulation of supply of electricity,
water or any other service.]
The penalties for the contravention of the orders of the State Board under
sections 3255 and 33A are very stringent. Section 41 56 of the Act provides
that the first conviction for the violation of the orders of the Board under
clause (c) of sub-section (1) of section 32 or directions issued under sub-
section (2) of Section 33 or directions issued under Section 33A shall be
punishable with minimum imprisonment for a term which shall not be
55
.Section 32 states: Emergency measures in case of pollution of stream
or well.—(1) When it appears to the State Board that any poisonous,
noxious or polluting matter is present and z[any stream or well or on
land by reason of the discharge of such matter in such stream or well
or on such land] or has entered into that stream or well due to any
accident or other unforeseen act or event, and if the Board is of
opinion that it is necessary or expedient to take immediate action, it
may for reasons to be recorded in writing, carry out such operations,
as it may consider necessary for all or any of the following
purposes, that is to say,—
(a) removing that matter from the a[stream or well or on land] and
disposing it of in such manner as the Board considers appropriate;
(2) The power conferred by sub-section (1) does not include the power to
construct any works other than works of a temporary character which are
removed on or before the completion of the operations.
56
.Section 41 states: c[Failure to comply with directions under sub-
section (2) or sub-section (3) of section 20, or orders issued under
clause (c) of sub-section (1) of section 32 or directions issued under
sub-section (2) of section 33 or section 33A.—(1) Whoever fails to
comply with the direction given under sub-section (2) or sub-section
(3) of section 20 within such time as may be specified in the direction
shall, on conviction, be punishable with imprisonment for a term
which may extend to three months or with fine which may extend to
ten thousand rupees or with both and in case the failure continues,
with an additional fine which may extend to five thousand rupees for
less than one year and six months but which may extend to six years
and with fine. In case, the failure continues, an additional fine shall be
imposed extending to five thousand rupees for every day during which
such failure continues after the conviction for the first such failure.
every day during which such failure continues after the conviction for
the first such failure.
(2) Whoever fails to comply with any order issued under clause (c) of
sub-section (1) of section 32 or any direction issued by a court under
sub-section (2) of section 33 or any direction issued under section 33A
shall, in respect of each such failure and on conviction, be punishable
with imprisonment for a term which shall not be less than one year and
six months but which may extend to six years and with fine, and in case
the failure continues, with an additional fine which may extend to five
thousand rupees for every day during which such failure continues after
the conviction for the first such failure.
(z) Substituted by section 16, Act 53 of 1988 for ‘any stream or well’
(wef 29 September 1988).
(a) Substituted by section 16, Act 53 of 1988 for ‘stream or well’ (wef
29 September 1988).
(b) Substituted by section 16, Act 53 of 1988 for ‘into the stream or well’ (wef 29
September 1988).
(c) Substituted by section 21, Act 53 of 1988 for section 41 (wef 29 September 1988).
(d) Substituted by section 26, Act 53 of 1988, for sub-section (1) (wef 29
September 1988).
respondents have not taken remedial measures to prevent pollution and
had failed to arrest the unabated pollution of the river water which
became a health hazard and environmental enemy. Accordingly, the
Supreme Court directed the closure of the respondent industry till the
unlined lagoons are removed and the contamination is stopped. The
Court requested the NEERI to conduct an inspection of the industry and
to submit a report to the Court disclosing whether the pollution control
devices have been fixed by the industry and proper steps taken to
control pollution in accordance with the provisions of the Act or not.
NEERI was also requested to inspect the surrounding area with a view
to assess damage caused due to discharge of effluent by the industry
and to indicate the cost of restitution.
Where the Board resolved to file the complaint, naturally the act of
filing the complaint was to be performed by some officer of the Board
well conversant with the facts of the case as the Board is a legal person
and not named person and thus, for performing aforesaid act of filing
complaint, Board authorised one of its officers to be nominated by the
Assistant Secretary who in turn nominated Assistant Environment
Engineer to file the complaint. It was sufficient compliance with section
49 and the complaint thus filed by the Board through Assistant
Environment Engineer would be valid. In such a case, mere nomination
by the Assistant Secretary, does not amount to further delegation of a
delegated power or further sub-delegation of sub-delegated power.
When a statute conferring powers imposes certain duties and functions
incidental to the exercise of power in such a way that they are
integrally connected with them, a permissible delegation of the power
is effective to delegate duties and functions along with the power.
Section 2059 of the Act empowers the State Board to give directions to
58
. AIR 1996 Allahabad 173.
59
.Section 20 states: Power to obtain information.—(1) For the
purpose of enabling a State Board to perform the functions
conferred on it by or under this Act, the State Board or any officer
empowered by it in that behalf, may make surveys of any area and
gauge and keep records of the flow or volume and other
characteristics of any stream or well in such area, and may take steps
for the measurement and recording of the rainfall in such area or any
part thereof and for the installation and maintenance for those
purposes of gauges or other apparatus and works connected
therewith, and carry out stream surveys and may take such other
any person to obtain information concerning abstraction of water from
any stream or well or discharge of trade or sewage effluent into stream or
well. The failure to comply with the directions of the Board given under
section 20 are punishable under section 41 of the Act. Subsection (1) of
section 41 provides that the conviction of a person for failure to comply
with the directions of the Board issued under section 20 shall be
punishable with imprisonment for a term which may extend to three
months or with fine which may extend to ten thousand rupees or with
both. In case failure continues, an additional fine which may extend to
five thousand rupees for every day during which such failure continues
after conviction for the first such failure shall be imposed.
(2) A State Board may give directions requiring any person who in
its opinion is abstracting water from any such stream or well in the area in
quantities which are substantial in relation to the flow or volume of that
stream or well or is discharging sewage or trade effluent into any such
stream or well, to give such information as to the abstraction or the
discharge at such times and in such form as may be specified in the
directions.
(e) Substituted by section 10, Act 53 of 1988, for ‘industry or trade’ (wef
29 September 1988).
and such other particulars as may be prescribed.
closure, prohibition or regulation of an industry or the stoppage or
regulation of supply of electricity, water or any other service even in
the absence of the direction of the court. Sub-section (2) of section 41
provides that the conviction of a person to comply with the directions of
the Board issued in the exercise of its emergency powers under section
32 shall be punishable with imprisonment for a term which shall not be
less than one year and six months but which may extend to six years
and with fine. In case failure continues, an additional fine which may
extend to five thousand rupees for every day during which such failure
continues after conviction of the first such failure shall be imposed.
Sub-section (3) of section 41 provides that:
60
.Section 24 states: Prohibition on use of stream or well for disposal of
polluting matter, etc.—(1) Subject to the provisions of this section,
—
If any person who has been convicted of any offence under section
acts, namely:
(f) Substituted by section 11, Act 53 of 1988, for ‘stream or well’ (wef 29
September 1988).
(c) putting into any stream any sand or gravel or other natural
deposit which has flowed from or been deposited by the current of
such stream;
(d) causing or permitting, with the consent of the State Board, the
deposit accumulated in a well, pond or reservoir to enter into any
stream.
61
.Section 25 states: Restrictions on new outlets and new discharges.
—g[(l) Subject to the provisions of this section, no person shall,
without the previous consent of the State Board,—
(b) bring into use any new or altered outlet for the discharge of
sewage; or
(3) The State Board may make such inquiry as it may deem fit in
respect of the application for consent referred to in sub-section (1) and
in making any such inquiry shall follow such procedure as may be
prescribed.
h
[(4) The State Board may –
Section 25 deals with the grant of consent by the State Board for
establishing an industry and section 26 deals with the grant of consent
by the State Board to an industry existing at the time of coming into
force of the Act. The State Board may grant the consent
unconditionally or on certain conditions or may even refuse to grant
consent. Any act which violates section 25 and 26 of the Act constitutes
(g) Substituted by section 12, Act 53 of 1988, for sub-sections (1) and
(2) (wef 29 September 1988).
(h) Substituted by section 12, Act 53 of 1988, for sub-sections (4), (5)
and (6) (wef 29 September 1988).
(i) in cases referred to in clauses (a) and (b) of sub-section (1) of section
25, conditions as to the point of discharge of sewage or as to the use of
that outlet or any other outlet for discharge of sewage;
(iii) that the consent will be valid only for such period as may be
specified in the order,
(5) Where, without the consent of the State Board, any industry,
operation or process, or any treatment and disposal system or any
extension or addition thereto, is established, or any steps for such
establishment have been taken or a new or altered outlet is brought into use
for the discharge of sewage or a new discharge of sewage is made, the
State Board may serve on the person who has established or taken steps to
establish any industry, operation or process, or any treatment and disposal
system or any extension or addition thereto, or using the outlet, or making
serious environmental offence. Section 44 of the Act provides that:
the discharge, as the case may be, a notice imposing any such conditions
as it might have imposed on an application for its consent in respect of
such establishment, such outlet or discharge.
(8) For the purposes of this section and sections 27 and 30,—
(a) the expression ‘new or altered outlet’ means any outlet which is wholly or
partly constructed on or after the commencement of this Act or which (whether so
constructed or not) is substantially altered after such commencement;
(b) the expression ‘new discharge’ means a discharge which is not, as respects
the nature and composition, temperature, volume, and rate of discharge of the
effluent substantially a continuation of a discharge made within the preceding twelve
months (whether by the same or a different outlet), so however that a discharge which
is in other respects a continuation of previous discharge made as aforesaid shall not be
deemed to be a new discharge made as aforesaid shall not be deemed to be a new
discharge by reason of any reduction of the temperature or volume or rate of
discharge of the effluent as compared with the previous discharge.
62
.Section 26 states: Provision regarding existing discharge of sewage or
trade effluent.—Where immediately before the commencement of this
Act any person was discharging any sewage or
Whoever:
(m) Substituted by section 22, Act 53 of 1988 for ‘one thousand rupees’
(wef 29 September 1988).
7. Offences by Companies
Section 47 of the Act provides for the offences committed by the
companies and attributes criminal liability to the corporate officials.
Section 47 of the Act contains two clauses. Sub-section (1) of section
47 provides that:
The question which arose in the appeal was whether the Chairman,
Vice-Chairman, Managing Director and members of the Board of
Directors were liable to be proceeded against under section 47 of the
Act in the absence of a prosecution of the company owning the said
industrial unit? Sub-section (1) of section 47 of the Act provides
In Nalin Thakor and Ors v State of Gujarat and Ors64 two conflicting
64
. 2004 (2) SCALE 68.
judgements were considered, i.e. Municipal Corporation of Delhi v
Ram Kishen Rohtagi65 and State of Haryana v Brijlal Mital66. It was
held:
The core question that arises in the context of Criminal Case No. 6 of
1990, filed by the respondents against the appellants under sections 24
and 25, punishable under sections 43 and 44 read with Section 47 of the
Water (Prevention and Control of Pollution) Act 1974 (hereinafter
referred to as ‘the Act’). On the complaint, the Magistrate, taking
cognizance of the offence, ordered issue of the process to the appellant
herein. It is at this stage the appellants, who were Directors of the
Company, filed a Criminal Miscellaneous Application under Section
482 of the Code of Criminal Procedure, 1975 before the High Court for
quashing the proceedings pending before the 5th Joint Judicial
Magistrate, First Class at Bhavnagar, being Criminal Case No. 6 of
1990. The Gujarat High Court rejected the said Criminal Miscellaneous
Application. It is against the said order and judgment of the High
Court, the appellants are in appeal before us.
We have looked into the facts of this case and find that as far back as on
27 April 1989, the Factor Manager wrote to the ‘Gujarat Pollution
Control Board, Gandhi Nagar that the FRP lining provided in the Oil
and Grease trap of the Effluent Treatment Plant has been damaged at
some places and they are taking a short shutdown on the said tank and
efforts are being made to repair/replace the FRP lining. An assurance
was also given to restart the plant as soon as it is repaired. It is not
disputed that the sample of the water was taken on 6th May 1989, i.e.
immediately after the information was sent to the Board as mentioned
in the show cause notice dated 17 August 1989. We further find that the
issue of summons to the appellants was also without an application of
mind as nothing was said in the complaint or in the statement recorded
by the 5th Joint Judicial Magistrate before issue of summons that the
offence was committed with the consent or connivance of or was
attributable to any negligence on the part of the appellants. Sub-section
(2) of section 47 requires that where an offence under this Act has
been committed by a company and it is proved that the offence has been
committed with the consent or connivance of, or is attributable to any
neglect on the part of, any director, manager, secretary or other officer
of the company, such director, manager, secretary or other officer shall
also be deemed to be guilty of that offence and shall be liable to be
proceeded against and punished accordingly. There being no allegation
as regards the requirement of sub-section (2) of Section 47, the 5th Joint
Judicial Magistrate committed an error in issuing summons to the
appellants herein.
Where an offence under this Act has been committed by any Department of
Government, the Head of the Department shall be deemed to be guilty of
the offence and shall be liable to be proceeded against and punished
accordingly.
X. OVERRIDING EFFECT
This provision gives effect to the rule that lex specialis prevails over
lex generalis in case of inconsistency between the two. Accordingly,
Water (Prevention and Control of Pollution) Act, being special law to
prevent and control the pollution of water, prevails over any inconsistent
general law on the subject.
(a) that the Central Board or the Joint Board has persistently
made default in the performance of its functions imposed on
it by or under this Act; or
(b) that circumstances exist which render it necessary in the
public interest so to do, the Central Government may, by
notification in the Official Gazette, supersede the Central Board
or such Joint Board, as the case may be, for such period not
exceeding one year, as may be specified in the notification.
At that event, all the powers and functions of the Central or Joint Board
shall be discharged or performed by such person as the Central Government
may direct and all the properties of the Central Board or the Joint Board
shall vest in the Central Government till the Central Board or the Joint Board is
reconstituted. On the expiration of the period of supersession, the Central
Government may either extend the period of supersession for a further term
not exceeding three months or reconstitute the Central Board or the Joint
Board.
(a) extend the period of supersession for such further term, not
exceeding six months, as it may consider necessary; or
(b) reconstitute the Central Board or the Joint Board, as the case
may be, by fresh nomination or appointment, as the case may be, and
in such case any person who vacated his office under clause (a) of
sub-section (2) shall not be deemed disqualified for nomination or
appointment:
Provided that the Central Government may at any time before the
expiration of the period of supersession, whether originally specified
under sub-section (1) or as extended under this sub-section, take
action under clause (b) of this sub-section.
Section 62 of the Act confers power on the State Government to supersede the
State Board for a period not exceeding one year, by notification on the
Official Gazette.
(a) that the State Board has persistently made default in the
performance of its functions imposed on it by or under this
Act; or
(b) that the circumstances exist which render it necessary in public
interest so to do, the State Government may, by notification in
the Official Gazette, supersede the State Board for such period,
not exceeding one year, as may be specified in the notification.
Section 6367 and section 6468 of the Act confer powers on the Central
Government and the State Government respectively to make rules at
67
. Section 63 states: Power of Central Government to make rules.—
(1) The Central Government may, simultaneously with the constitution
of the Central Board, make rules in respect of the matters specified in
sub-section (2):
Provided that when the Central Board has been constituted, no such
rule shall be made, varied, amended or repealed without consulting the
Board.
(a) the terms and conditions of service of the members (other than the
chairman and member-secretary) of the Central Board under sub-
section (8) of section 5;
(b) the intervals and the time and place at which meetings of the
Central Board or of any committee thereof constituted under this
Act, shall be held and the procedure to be followed at such
meetings, including the quorum necessary for the transaction of
business under section 8, and under sub-section (2) of section 9;
the time of the constitution of the Boards concerning the performance
of their functions.
The Water (Prevention and Control of pollution) Act suffers from various
inadequacies and infirmities. The legal measures to prevent and control
water pollution involve scientific complexities. Accordingly, the
authorities established under the Water (Prevention and Control of
Pollution) Act require combination of scientific, technological and
judicial inputs to come to grips with the problem of water pollution. The
°[(d) the manner in which and the purposes for which persons may be
associated with the Central Board under sub-section (1) of section 10
and the fees and allowances payable to such persons;]
(e) the terms and conditions of service of the chairman and the member-
secretary of the Central Board under sub-section (9) of section 5
and under sub-section (1) of section 12;
(j) the form of the report of the Central Board analyst under sub-
section (1) of section 22;
(k) the form of the report of the Government analyst under sub-
section (3) of section 22;
q
[(l) the form in which and the time within which the budget of the
Central Board may be prepared and forwarded to the Central
Government under section 38;
(11) the form in which the annual report of the Central Board may be
prepared under section 39;]
(m) the form in which the accounts of the Central Board may be
maintained under section 40;
constitution of the Pollution Control Boards and the Appellate Authority
envisaged under the Water (Prevention and Control of Pollution) Act
does not make the inclusion of scientific, technological or judicial
persons mandatory. This results in the inclusion of bureaucrats in the
constitution of these authorities and the experts are ignored. Thus, the
authorities find themselves ill equipped in terms of skill as well as
resources to perform the functions of prevention, control or abatement
of water pollution. Even the courts which try environmental protection
cases find themselves handicapped due to lack of scientific inputs.
The Water (Prevention and Control of Pollution) Act 1974, does not
r
[(mm) the manner in which notice of intention to make a complaint
shall be given to the Central Board or officer authorised by it under
section 49;]
(n) any other matter relating to the Central Board, including the
powers and functions of that Board in relation to Union territories;
(o) any other matter which has to be, or may be, prescribed.
(3) Every rule made by the Central Government under this Act shall be
laid, as soon as may be after it is made, before each House of Parliament
while it is in session for a total period of thirty days which may be
comprised in one session or in two or more successive sessions, and it,
s
[before the expiry of the session immediately following the session or the
successive sessions aforesaid], both Houses agree in making any
modification in the rule or both Houses agree that the rule should not be
made, the rule shall thereafter have effect only in such modified form or
be of no effect, as the case may be; so, however, that any such
modification or annulment shall be without prejudice to the validity of
anything previously done under that rule.
68
. Section 64 states: Power of State Government to make rules.—(1)
The State Government may, simultaneously with the constitution of the
State Board, make rules to carry out the purposes of this Act in respect of
matters not falling within the purview of section 63;
Provided that when the State Board has been constituted, no such rule
shall be made, varied, amended or repealed without consulting that
Board.
(a) the terms and conditions of service of the members (other than the
chairman and the member-secretary) of the State Board under
make any reference to the concept of sustainable development,
‘precautionary principle’ or the ‘polluter pays principle’ which are
fundamental principles of international environmental jurisprudence
and form part of the international customary law. However, the
Supreme Court of India has demonstrated exemplary activism in reading
these principles not only in the constitutional provisions contained in
article 48A and article 51A(g) but also in the environmental
legislations and directed the authorities, established under the
environmental legislations to apply these principles in taking decisions.
The Water (Prevention and Control of Pollution) Act 1974, does not
(b) the time and place of meetings of the State Board or of any
committee of that Board
(p) Clauses (h) and (i) omitted by section 20, Act 44 of 1978.
(q) Substituted by section 27, Act 53 of 1988 for clause (1) (wef 29
September 1988).
(d) the manner in which and the purposes for which persons may be
associated with the State Board under sub-section (1) of section
10 t[and the fees and allowances payable to such persons];
(e) the terms and conditions of service of the chairman and the
member-secretary of the State Board under sub-section (9) of
section 5 and under sub-section (1) of section 12;
The Water (Prevention and Control of Pollution) Act 1974, does not
make environmental impact assessment mandatory for the grant of
consent to an industrial unit. It does not even provide for
environmental audit.
(i) the form of the report of the State Board analyst under sub-
section (1) of section 22;
(j) the form of the report of the Government analyst under sub-
section (3) of section 22;
(k) the form of application for the consent of the State Board under
sub-section (2) of section 25, and the particulars it may contain;
(m) the form and manner in which appeals may be filed, the fees
payable in respect of such appeals and the procedure to be followed
by the appellate authority in disposing of the appeals under sub-
section (3) of section 28;
u
[(n) the form in which and the time within which the budget of the
State Board may be prepared and forwarded to the State
Government under section 38;
(nn) the form in which the annual report of the State Board may be
prepared under section 39;]
(o) the form in which the accounts of the State Board may be
maintained under sub-section (1) of section 40;
v
[(oo) the manner in which notice of intention to make a complaint
shall be given to the State Board or officer authorised by it under
References and Suggested Readings:
section 49;]
(u) Substituted by section 28, Act 53 of 1988 for clause (n) (wef 29
September 1988).