Noida Metro Rail Project Cec-Sam-Jv.: Presentation On U-Girder Casting by L.K.Prasad
Noida Metro Rail Project Cec-Sam-Jv.: Presentation On U-Girder Casting by L.K.Prasad
Noida Metro Rail Project Cec-Sam-Jv.: Presentation On U-Girder Casting by L.K.Prasad
By
L.K.Prasad
Scope of Work
27 m standard
Sl no Package Nos of Girder span Non standard span Concrete Qty Steel Qty.
Grade of Concrete:M55
Microsilica(Kg) Elkem/Comiche 25
1. Total No of BAY-4.
1. Bay-1 28*2= 56
2.Bay-2 28*2 56
3.Bay-3 23*2 46
Total 158
Casting Bed Preparation
Rebar fixing
C/Bed Wall
Casting Bed Wall
Longitudional Wall
300*1100
2800mm
Shutter Making
5050mm
Outer
Shutter Outer
Shutter
3800mm
Inner shutter
Lifting hole
Lifting hole
Outer Shutter
Outer shutter
support
Outer shutter
Outer form
Bottom shutter
Buffing of Shutter
Buffing/cleaning
of shutter
Girder Mould
Applying shuttering
oil(Reebol)
Automatic bar cutting & Bending M/c
Automatic bar cutting & Bending M/c
Format Line 12
Rebar zig
Re bar cage placing
Rebar cage
Rebar zig.
Pre Fab Rebar
Rebar zig.
Cage Lifting
Cage lifter
Wt. of cage 10.2
MT
Cage Placing
Cage Placing
Cage Lifter
Cage Lifter
Cage Lifting
U-girder cage 27
mts long
wt.10.12 MT
Cage lifting from zig.
Outer Shutter
2500mm c/c
Turn buckle
Shutter vibrator
Shutter vibrator
Shutter vibrator
Shutter vibrator
Rebar cage Placing
Rebar cage
Bulk Head
Cage Placing
HT Coil despenser
HT coil
HTS CABLE
Cable Threading
Bulk head
HT Cable
Cable Threading
Floating Beam
Stressing end
Barrel
15.2 mm
cable grip
wedge 3
segmental
1. HT cable 15.2mm
dia
2. Load in each
cable 195.5
KN/19.92 MT
3. Total load
1434.24 MT
4. Ram area of jack
529.2 sq.cm
5. Required
pressure 460.55
kg/cm2
6. Modified
elongation
1179mm
Hydraulic hose
700 bar.
Stressing operation
Return line
Stressing line
Stressing Mechanism
Washer plate
Hollow device
Washer plate
Prestressing
Stressing line
Piston
Nut
Dead End
Reaction wall
6500*1450*1200 mm Cable grip
Cable Threading
Debonding
tube
Drainage
spout
Debonded tube
Debonding
tube 20 mm id
HDPE pipe
Stressing End
Bulk head
Floating
Beam
Anchorage/Grip
HT strand
Stressing End
Boom Placer
Boom Placer
Concreting
Transit Mixture
Load Transfer
Load Transfer criteria
After 3 days of
concreting with a
minimum
compresshive
strength of conc.
35 Mpa.
Load Transfer To Concrete
Pre cast pier cap cage
Precast pier cap cae
Pier cap
Anchor cone
Cross Arm
Anchor cone
Anchor cone
Stressing
Lifter 02 nos
40 mm dia
Macalloy bar 4
nos
Girder Lifting
Lifting hole
Girder Lifting
40 mm dia Macalloy
nut
Washer plate
Girder Lifter
Girder stacking
Girder Lifting
100 MT
Capacity EOT
Girder wt 150 MT
Cable cutting
Recess Filling
Double layer stacking
Stacking stool
Curing
Girder stacking
Time cycle U-girder
Denka chloroprene
section of Neoprene Bearing.
Steel Neoprene
Wedge plate