Size Determination STRAP- FOOTING

SF1
a1 0.8 b1 1.70 a2 1 b2 1.74
P1 449.99535 Cx1 0.30 P2 699.7015 Cx2 0.30
P1(factored) 368.13 Cy1 0.20 P2(factored) 608.74 Cy2 0.20
mx -6.278 Xc 2.26 mx -3.066 1.08
my -1.047 e 0.25 my -1.01
ssoil ( factored) 350 XR 2.01 a2= 1 b2= 1.75
Resultant 1149.69685 R1 505.96 R2 643.73
Use a1= 0.9 b1= 1.75
q1 632.45615 q2 643.7319
Check distribution of stress uniform distribution Delta" q " 15

Footing-1 Footing-2
D1= 500 D2= 500
d(mm)= 442 d(m)= 0.442 d(mm) 442 d(m)= 0.442

material ssoil (allowable 250


Fck 20.00 Mpa Foundation depth 3.00
Fctd 1.03 Mpa Unit weight of soil 16.00

EBCS 2 1995
Depth determin 13
Footing-1 Footing-2
Punching all 283.67 Punching all 451.29

Punch stress -29.24 Punch stress -60.56

Check stress D is Ok Check stress D is Ok

widebeam all 283.67 widebeam all 451.29


shear force-X dir 128.40 shear force-X dir 188.90
widebeam stress "X" 166.00 widebeam stress " X " 244.21
widebeam stress "Y" 263.69 widebeam stress " Y " 263.69
Check stress D is ok Check stress D is ok

Moment
Mx 129.17 Moment Mx 80.00
Km 25.71 Ks 3.24 Km 20.24 Ks 3.10
My 98.44 My 103.76
Km 22.45 Ks 2.99 Km 23.05 Ks 2.99
F-1 F-2
As X-dirc 946.86 As X-dirc 884.00
As -Y direc 884.00 As -Y direc 884.00

f in X-direc 16 top f in X-direc 16


f in Y-direc 12 bottom f in Y-direc 12
Spacing X-dir f20 212 Spacing X-dir f16 227
Y-dir f12 128 Y-dir f12 128