Strap Footing Foundation Final
Strap Footing Foundation Final
Strap Footing Foundation Final
SF1
a1 0.8 b1 1.70 a2 1 b2 1.74
P1 449.99535 Cx1 0.30 P2 699.7015 Cx2 0.30
P1(factored) 368.13 Cy1 0.20 P2(factored) 608.74 Cy2 0.20
mx -6.278 Xc 2.26 mx -3.066 1.08
my -1.047 e 0.25 my -1.01
ssoil ( factored) 350 XR 2.01 a2= 1 b2= 1.75
Resultant 1149.69685 R1 505.96 R2 643.73
Use a1= 0.9 b1= 1.75
q1 632.45615 q2 643.7319
Check distribution of stress uniform distribution Delta" q " 15
Footing-1 Footing-2
D1= 500 D2= 500
d(mm)= 442 d(m)= 0.442 d(mm) 442 d(m)= 0.442
EBCS 2 1995
Depth determin 13
Footing-1 Footing-2
Punching all 283.67 Punching all 451.29
Moment
Mx 129.17 Moment Mx 80.00
Km 25.71 Ks 3.24 Km 20.24 Ks 3.10
My 98.44 My 103.76
Km 22.45 Ks 2.99 Km 23.05 Ks 2.99
F-1 F-2
As X-dirc 946.86 As X-dirc 884.00
As -Y direc 884.00 As -Y direc 884.00
Footing-1 Footing-2
b1
b2
C1 b1 C-2 b2
a1 a2
a1 a2
P1 P2