Final Report For PSFS
Final Report For PSFS
Contents Page
1. Introduction/Objectives 1
2. Background Information 1
3. Design Criteria
4. System Selection
5. Detailed Design
7. Reference
8. Appendix
1. Introduction/Objectives
Plumbing Drainage and Fire Services design are very important items in the building
service. A good design for Fire Services can be protected life and property from fire or
others calamity effectively. Also, cold water supply will supply all sanitary fixtures for
general ablution and drinking usages. Therefore, we will follow the design criteria to study
the project.
2. Background Information
This is a 30 /storeys grade A office building which was located at Kwun Tong. The area of
the construction site is around 780m2 and total height of building is 96m, so it is classified
to ordinary hazard III (OH III) building.
There are 13 Manager Room3 Conference Room and an Administration Officer. In each
floor, there are a Drawing Room, a Security Room, a Lift Lobby, a Wash Room (Male,
Female and Disable), a Store room, a Pantry, a Cleaner Room, a A/C Plant Room and a
Switch Room.
Indirect System (sump and pump system) will selected as our design cannot satisfied the
requirement of direct supply from WSD COP. When the mains supply pressure is
insufficient to supply a direct supply. Also, buildings is high, if used Direct System will be
given more pressure on the lower floors drinking water taps. Using this system can
reduce the water pressure on the taps supplied from the cistern, which minimises noise
and wear on the taps using pressure reducing value.
45litres/point
Total points=9*30= 270 (Refer to floor plan)
Tank size = litres/point* Total points
Total tank size = 45/1000*270=12.15 m3
Total tank size = roof tank + sump tank (3:1)
∴ Size of roof tank = 12.15*0.75=9.1125m3
∴ Size of sump tank =12.15*0.25=3.0375m3
IOP Method
- Design working pressure at flush cisterns in the range of 0.5 – 4.5 bars (5 – 45 m)
- Velocity not to exceed 2.5 m/s
- Minimum size of supply pipe to flushing valves for WCs – 20 mm
45litres/point
Total points=11*30= 330(Refer to floor plan)
Tank size = litres/point* Total points
By the requirement of Water Supplies Department, the size of flushing water tank can be storage of 1/2
days
Total tank size = 45/1000*11*30*0.5=7.425 m3
Total tank size = roof tank + sump tank (3:1)
∴ Size of roof tank = 7.425*0.75=5.569 m3
∴ Size of sump tank =7.425*0.25=1.856 m3
The definition of the Solid and Waste System is the scope of the building drainage,
ventilation, sanitary ware and sewage treatment Equipment and systems. In this project,
two pipe system is selected because two pipe system is independent stack for soil and
waste water with ASP.
Male Lav.:
Total DUs of W.C. = 3*14 = 42DU
From table C4, diameter of discharge branch of W.C. = 75mm
Total DUs of Basin = 3*3 = 9DU
From table C4, diameter of discharge branch of Basin = 50mm
Total DUs of Urinal = 4*0.3 = 1.2DU
From table C4, diameter of discharge branch of Urinal = 40mm
Female Lav.:
Total DUs of W.C. = 3*14 = 42DU
From table C4, diameter of discharge branch of W.C. = 75mm
Total DUs of Basin = 3*3 = 9DU
From table C4, diameter of discharge branch of Urinal = 40mm
Disable Lav.:
Total DUs of W.C. = 1*14 = 14DU
From table C4, diameter of discharge branch of W.C. = 65mm
Total DUs of Basin = 1*3 = 3DU
From table C4, diameter of discharge branch of Urinal = 50mm
East West
Description of storm water Drainage System Storm is discharged water from storm water
stacks which located at roof floor. And the storm water will be collected by mains beneath
the ground floor and then discharged to the Government’s storm water mains via terminal
manholes.
Rainwater pipe
According to LPC rules BS 5306:Part 2:1990, The fire hazard of the A grade office building
is classified to Group 3 (OHIII).
Sprinkler Pump
- The highest sprinkler is 25 m which must be selected the pump duties for 30 m
sprinkler zone. The sprinkler pump duty shall be determined by 3 design points.
- The pump duties are set out for 3 sprinkler zone height of 15 m, 30 m and 45 m.
- Required pressure at Design Point
Jockey Pump
- According to LPC Clause 15.2.2
Pump head requirement
= 1.25 x static head difference between the valve and the highest sprinkler in the
installation
- Pump flow = 50% to 75% of one sprinkler head flow
- According to LPC Clause 16.2.2, the minimum refilling rate should be 75 l/min. In
designing the refilling pipe, use 75 l/min or 6 hour to re-fill the sprinkler water tank.
- The tank is not dependent on inflow, the town main is single end feed
Hydrant Outlet
- Manual Fire Alarm Call Points are not more than 1200 mm
Fire Pump
A fire hydrant and hose reel system is provided for a 30-storeyed office building
Each storey is of 3.2 m
Gross floor area for the building is 775m2.
The following data is given:
Component Location
1nos. Water Tank Roof/F
1nos. FH/HR Fixed Fire Pump Roof/F
1nos. Fire Service Inlet G/F
2nos. Hose Reel G/F to 30/F
2nos Hydrant Riser G/F to 30/F
1nos. Transfer Pump G/F
1nos. Fire Intermediate Booster Pump 20/F
Reference
Appendix
East Soil East Waste West Soil West Waste
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
Figure 6
Figure 7