Submission: Document No Received Date Review Date Notes
Submission: Document No Received Date Review Date Notes
Submission: Document No Received Date Review Date Notes
WTRAN-Transmit-0279 Maspero Stn-Internal Structure- Design Methodology & Model 9/9/2017 9/18/2017 Status C
WTRAN-Transmit-0280 Maspero Stn-D-Wall Design Methodology & Model 9/9/2017 9/25/2017 Status C
WTRAN-Transmit-0321 Maspero stn-Impact of the additional loads on the D-wall Thickness 9/9/2017 9/12/2017 Status C
WTRAN-Transmit-0360 Maspero Station - Diaphragm Wall Longitudinal - Design Results - Box 3 - Cross Section C - East 9/11/2017 10/10/2017
WTRAN-Transmit-0367 Maspero Station - Diaphragm Walls Reinforcement Steel Cages (P136a) and (P138b) 9/12/2017 10/10/2017
WTRAN-Transmit-0375 Maspero Station - Diaphragm Walls Reinforcement Steel Cages (P134), (S135), (S139) and (P140) 9/17/2017 10/10/2017
WTRAN-Transmit-0381 Maspero Station - Diaphragm Wall Longitudinal - Design Results - Box 3 - Cross Section 4 - East 9/18/2017 10/10/2017
WTRAN-Transmit-0385 Maspero Station - Diaphragm Wall - Calculation Sections, Identification 9/18/2017 10/10/2017
WTRAN-Transmit-0386 Maspero Station - Diaphragm Walls - Panelling and Guiding Walls 9/18/2017 10/10/2017
WTRAN-Transmit-0395 Maspero Station - Diaphragm Walls Reinforcement Steel Cages (S125) and (S149) 9/19/2017 10/10/2017
Document No Submission Received Date Review Date Notes
WTRAN-Transmit-0398 Maspero Station - Diaphragm Wall Longitudinal - Design Results - Box 3 - Cross Section 2 - East 9/19/2017 10/10/2017
WTRAN-Transmit-0404 Maspero Station - Diaphragm Walls Reinforcement Steel Cages (S129), (S131), (S143) and (S145) 9/20/2017 10/10/2017
WTRAN-Transmit-0408 Maspero Station - Diaphragm Wall Longitudinal - Design Results - Box 3 - Cross Section C - East 9/21/2017 10/10/2017
WTRAN-Transmit-0410 Maspero Station - Diaphragm Walls Reinforcement Steel Cages (P128a) and (P146a) 9/25/2017 10/10/2017
WTRAN-Transmit-0419 Maspero Station - Diaphragm Walls Reinforcement Steel Cages (130A), (130B), (144A) and (144B) 9/25/2017 10/10/2017
WTRAN-Transmit-0425 Maspero Station - Diaphragm Wall Longitudinal - Design Results - Box 3 - Cross Sections A and B - East 10/1/2017 10/10/2017
WTRAN-Transmit-0436 Maspero Station - Site Installation - During Dwall Phase 10/1/2017 10/10/2017
WTRAN-Transmit-0442 Maspero Station - Diaphragm Wall Longitudinal - Design Results - Box 3 - Cross Section 1 - East 9/28/2017 10/10/2017
WTRAN-Transmit-0458
Maspero Station - Diaphragm Walls Reinforcement Steel Cages (P132a), (P132b), (S133), (S141), (P142a), 10/2/2017
(P142b)
WTRAN-Transmit-0471 Maspero Station - Diaphragm Wall Longitudinal - Design Results - Box 3 - Cross Section3 - East 10/9/2017
WTRAN-Transmit-0488 Maspero Station - Internal Structures - Design Methodology and Model 10/8/2017
WTRAN-Transmit-0489-1 Maspero Station - Diaphragm Wall - Design Methodology and Model 10/9/2017
Document No Submission Received Date Review Date Notes
WTRAN-Transmit-0491 Maspero Station - Diaphragm Wall Longitudinal Design Results - Box 2 - Cross Sections 6 and Access 10/9/2017
CEJV-WTRAN-000474 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (16 Cages) 10/16/2017
CEJV-WTRAN-000478 Maspero Station - Diaphragm Walls - Cut Off Walls - Elevation 10/16/2017
CEJV-WTRAN-000489 Maspero Station - Diaphragm Wall GFRP Reinforcement - Design Results - Box 3 - Cs A & B - East 10/16/2017
CEJV-WTRAN-000514 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages Rev B (12 Cages) 10/17/2017
CEJV-WTRAN-000546 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (14 Cages) 10/19/2017
CEJV-WTRAN-000548 Maspero Station - Diaphragm Walls - Panelling and Guiding Walls 10/19/2017
CEJV-WTRAN-000564 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages Rev B (6 Cages) 10/23/2017
CEJV-WTRAN-000587 Maspero Station - Building Concept Feasibility and Impact - Impact of the Parking on Maspero Station –Rev B 10/25/2017
CEJV-WTRAN-000612 Maspero Station - Diaphragm Walls - Cut Off Walls for Access - Elevation 10/26/2017
CEJV-WTRAN-000624 Maspero Station - Diaphragm Walls - Location, Elevation, Panelling and Guiding Walls 10/29/2017
WTRAN-Transmit-0854 Maspero Station - Eleation Reference Points Location and Initial Readings 11/6/2017
CEJV-WTRAN-000757 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (7 Cages) 11/7/2017
CEJV-WTRAN-000966 Maspero Station - Diaphragm Wall Design Results - Box 3 - Section 1 & Section 2
CEJV-WTRAN-000984 Maspero Station - Impact of the Mall Additional Loads on the D-Wall Thickness
CEJV-WTRAN-000989 - FCR Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (4 Cages)
CEJV-WTRAN-001013 Maspero Station - Diaphragm Wall Design Results - Box 3 - Section 4 & Section A
CEJV-WTRAN-001015 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (10 Cages)
CEJV-WTRAN-001105 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (2 Cages - Sec 4)
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-001114 Maspero Station - Diaphragm Wall Design Results - Box 1 Section 1 West
CEJV-WTRAN-001123 Maspero Station - Diaphragm Wall Design Results - Box 1 Section A-West - Box 3 Section 3B-East
CEJV-WTRAN-001125 Maspero Station - Diaphragm Wall Design Results - Box 3 - Section 3A-East, Sections B&C East
CEJV-WTRAN-001126 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (5 Cages - Sec 2)
CEJV-WTRAN-001141 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (5 Cages - Sec 2)
CEJV-WTRAN-001204 Maspero Station - Diaphragm Wall GFRP Reinforcement - Design Results - Box 3-Cross Sections A B-East
CEJV-WTRAN-001233 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (7 Cages - Sec 3)
CEJV-WTRAN-001246 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (1 Cage - Sec 3)
CEJV-WTRAN-001248 Maspero Station - Diaphragm Wall Design Results - Box 1 - Sectios 2 & 4 & B & C - West
CEJV-WTRAN-001255 Maspero Station - Internal Structure - Design Methodology and Model & Design Results - Box 3 Sec-A - East
CEJV-WTRAN-001274 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (2 Cages - Sec 4)
CEJV-WTRAN-001286 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (4 Cages - Sec 3)
CEJV-WTRAN-001306 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (6 Cages - Sec C-East)
CEJV-WTRAN-001309 Maspero Station - Diaphragm Wall Design Results - Box 1 - Section 3A & 3B-West
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-001313 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (4 Cages - Sec 3)
CEJV-WTRAN-001357 Maspero Station - Diaphragm Wall Design Results - Box 1 Section 1 West
CEJV-WTRAN-001360) Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (4 Cages - Sec 1-West)
CEJV-WTRAN-001429 Maspero Station - Diaphragm Wall GFRP Rft - Design Result - Box 1- Cross Sections A&B - West
CEJV-WTRAN-001454 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (6 Cages - Sec 3-West)
CEJV-WTRAN-001479 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (2 Cages - Sec 1-West)
CEJV-WTRAN-001481 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (3 Cages - Sec 3-A - East)
CEJV-WTRAN-001483 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (5 Cages - Sec 3-A&B - Eest)
CEJV-WTRAN-001557 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (4 Cages - Sec 3-A - East)
CEJV-WTRAN-001581 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (4 Cages - Sec 3-A - East)
CEJV-WTRAN-001629 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (7 Cages - East&West))
CEJV-WTRAN-001680 Maspero Station - Diaphragm Wall Design Results - Box 3 - Section C - East
CEJV-WTRAN-001697 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (6 Cages - East)
CEJV-WTRAN-001707 Maspero Station - Diaphragm Wall Design Results - Box 3 - Sections A&B - East
CEJV-WTRAN-001878 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 1 Section 1 West
CEJV-WTRAN-001987 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (4 Cages - Sec 1-West)
CEJV-WTRAN-002001 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (2 Cages - Sec 1-West)
CEJV-WTRAN-002014 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 1 Section 2 West
CEJV-WTRAN-002041 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 1 Sections A, B & 4
CEJV-WTRAN-002082 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 1 Section C West 1/28/2018
CEJV-WTRAN-002086 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (16 Cages - Sec 2-West) 1/28/2018
CEJV-WTRAN-002100 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 1 Section 3A West 1/28/2018
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-002105 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 1 Section 3B West 1/28/2018
CEJV-WTRAN-002125 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 Section 6-13 A&C 1/29/2018
CEJV-WTRAN-002200
Maspero Station - Calculation Note - Diaphragm Wall Gfrp Reinforcement - Design Results - Box 3 - Cross 1/30/2018
Sections A & B - East
CEJV-WTRAN-002212 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 Section 6-11 East 1/30/2018
CEJV-WTRAN-002328 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (6 Cages - Sec C-West) 2/4/2018
CEJV-WTRAN-002345 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 Sections 6-10 & 6-12 East 2/4/2018
CEJV-WTRAN-002462 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 - Section 0-13 D 2/7/2018
CEJV-WTRAN-002497 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (3 Cages - Sec A&B-Eest) 2/8/2018
CEJV-WTRAN-002536 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 - Section 6-13 B 2/8/2018
CEJV-WTRAN-002572 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 1 Section 4b-10 W 2/11/2018
CEJV-WTRAN-002640 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (6 Cages - Sec 3 -West) 2/12/2018
CEJV-WTRAN-002937 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 1 All Sections (7-Secs) 2/19/2018
CEJV-WTRAN-002961 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (3 Cages - Sec A&B-Eest) 2/19/2018
CEJV-WTRAN-002984 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (16 Cages - Sec 2-West) 2/20/2018
CEJV-WTRAN-002995 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 Section 5b-11w 2/20/2018
CEJV-WTRAN-003018 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (5 Cages - Sec 6) 2/20/2018
CEJV-WTRAN-003047 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (3 Cages - Sec A&B-Eest) 2/21/2018
CEJV-WTRAN-003093 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 Section 5A - 11w&12W 2/22/2018
CEJV-WTRAN-003108 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (6 Cages - Sec C -West) 2/23/2018
CEJV-WTRAN-003140 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (5 Cages - Sec 6) 2/26/2018
CEJV-WTRAN-003144 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (2 Cages - Sec 4-West) 2/26/2018
CEJV-WTRAN-003180 Maspero Station - Calculation Note - Maspero Building Development - Synthesis of Studies 2/26/2018
CEJV-WTRAN-003328 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P136b) 3/1/2018
CEJV-WTRAN-003380 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (5 Cages - Secs CS5B &CS 11E) 3/4/2018
CEJV-WTRAN-003438
Maspero Station - Calculation Note - Diaphragm Wall GFRP Reinforcement - Design Results - Box 1 - Cross 3/5/2018
Sections A & B - West
CEJV-WTRAN-003546 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (3 Cages - Sec 13) 3/7/2018
CEJV-WTRAN-003553 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (3 Cages - Sec A&B-West) 3/7/2018
CEJV-WTRAN-003645 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (3 Cages - Sec CS5) 3/11/2018
CEJV-WTRAN-003733 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (5 Cages - Sec CS 13) 3/13/2018
CEJV-WTRAN-003743 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (2 Cages - Sec CS 13) 3/13/2018
CEJV-WTRAN-003744 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 1 Section2 West 3/13/2018
CEJV-WTRAN-003763 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (3 Cages - Sec CS 6) 3/13/2018
CEJV-WTRAN-003779 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (9 Cages - Sec2 West) 3/14/2018
CEJV-WTRAN-003782 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P106a) 3/14/2018
CEJV-WTRAN-003793 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P120a) & (P154b) 3/14/2018
CEJV-WTRAN-003832 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P112a) & (P162b) 3/15/2018
CEJV-WTRAN-003847 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (3 Cages - Sec4 West&Sec13b) 3/15/2018
CEJV-WTRAN-003889 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P228a) 3/15/2018
CEJV-WTRAN-003936 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P156b) 3/19/2018
CEJV-WTRAN-003986 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (S111) & (S163) 3/20/2018
CEJV-WTRAN-004119 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (4 Cages - Sec3 West) 3/22/2018
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-004241 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P116a) & (P116b) 3/26/2018
CEJV-WTRAN-004521 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P176b), (S177) & (P178a) 4/1/2018
CEJV-WTRAN-004540 Report on Design Criteria Input Data for the Developer of Future Maspero Building Project 4/1/2018
CEJV-WTRAN-004602 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 1 Section 2 West 4/3/2018
CEJV-WTRAN-004606 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 Section 6-13 C 4/3/2018
CEJV-WTRAN-004636 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 1 Section 4 West 4/4/2018
CEJV-WTRAN-004760 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 Sections 0-12 & 5A-11 4/8/2018
CEJV-WTRAN-004761 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 Section 6-13 A 4/8/2018
CEJV-WTRAN-004780 Maspero Station - Internal Structure - Design Methodology and Model 4/10/2018
CEJV-WTRAN-004784 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 Section 6-10E 4/10/2018
CEJV-WTRAN-004856 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 Section 5B-10W 4/12/2018
CEJV-WTRAN-004865 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 Sections 6-12E & 6-11E 4/12/2018
CEJV-WTRAN-004867 Maspero Station - Diaphragm Walls – Panelling, Guiding Walls, Cages Location, Identification and Elevation 4/12/2018
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-005071 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P164a), (S163), (S111) & (P110b) 4/22/2018 Date is correct
CEJV-WTRAN-005075 Maspero Station - Soft Gel Plug - Drilling Grid - Box (1) 4/21/2018
CEJV-WTRAN-005110 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P162a) & (S161) 4/22/2018
CEJV-WTRAN-005115 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P112b) & (S113) 4/22/2018
CEJV-WTRAN-005117 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P114a), (S115) & (P114b) 4/22/2018
CEJV-WTRAN-005118 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P160a), (S159) & (P160b) 4/22/2018
CEJV-WTRAN-005223 Maspero Station - Calculation Note - Roof Slab Detailed Results Terminated
CEJV-WTRAN-005238 Maspero Station - Calculation Note - Roof Slab Detailed Results 4/24/2018
CEJV-WTRAN-005282 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P158b) 4/26/2018
CEJV-WTRAN-005284 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P116a) 4/26/2018
CEJV-WTRAN-005332 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P120a), (P154b) 4/29/2018
CEJV-WTRAN-005342 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P220), (S221) & (P222a) 4/29/2018
CEJV-WTRAN-005358 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P106b) & (P168a) 4/29/2018
CEJV-WTRAN-005371 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P200), (S201) & (P202a) 4/29/2018
CEJV-WTRAN-005374 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (S107) & (S167) 4/29/2018
CEJV-WTRAN-005419 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 1 Section 2 West 5/2/2018
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-005542 Maspero Station - Reinforcement - Diaphragm Wall - Steel Cages (P202b) & (S209) 5/5/2018
CEJV-WTRAN-005616 Maspero Station - Reinforcement - Diaphragm Wall - Steel Cages (P222b) & (S229) 5/6/2018
CEJV-WTRAN-005659 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P118a) 5/7/2018
CEJV-WTRAN-005661 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P110a) & (P164b) 5/7/2018
CEJV-WTRAN-005671 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P118b) & (P156a) 5/7/2018
CEJV-WTRAN-005821 Maspero Station - Reinforcement - Diaphragm Wall - Steel Cage (P 208b) 5/9/2018
CEJV-WTRAN-005854 Maspero Station - Reinforcement - Diaphragm Wall - Steel Cage (P 208a) 5/10/2018
CEJV-WTRAN-005922 Maspero Station - Reinforcement - Diaphragm Wall - Steel Cage (P 228b) 5/13/2018
CEJV-WTRAN-005928 Maspero Station - Reinforcement - Diaphragm Wall - Steel Cage (S 203) 5/13/2018
CEJV-WTRAN-005962 Maspero Station - Reinforcement - Diaphragm Wall - Steel Cage (P 228a) 5/14/2018
CEJV-WTRAN-005977 Maspero Station - Diaphragm Walls – Panelling, Guiding Walls, and Cages Location 5/15/2018
CEJV-WTRAN-006043 Maspero Station - Calculation Note - D Wall Design Results - Box 2 - Sections 0-12W & 5A - 11W 5/17/2018
CEJV-WTRAN-006047 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 Section 5b-10W 5/17/2018
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-006068 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P112a) 5/17/2018
CEJV-WTRAN-006069 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P210)&(P230) 5/17/2018
CEJV-WTRAN-006092 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P110b),(S111),(S163)&(P164a) 5/20/2018
CEJV-WTRAN-006095 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 - Sections 6 (3 Notes) 5/20/2018
CEJV-WTRAN-006116 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (S119)&(S155) 5/20/2018
CEJV-WTRAN-006180 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (S109)&(S165) 5/21/2018
CEJV-WTRAN-006263 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (S117) 5/23/2018
CEJV-WTRAN-006264 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P120a) & (P154b) 5/23/2018
CEJV-WTRAN-006266 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P162b) & (S227) 5/23/2018
CEJV-WTRAN-006274 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P156b) & (S157) 5/23/2018
CEJV-WTRAN-006279 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 Section 6-13 A 5/23/2018
CEJV-WTRAN-006291 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P118b) & (P156a) 5/23/2018
CEJV-WTRAN-006294 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P118a) 5/23/2018
CEJV-WTRAN-006354 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P110a) & (P164b) 5/24/2018
CEJV-WTRAN-006398 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 Section 6-13 C 5/24/2018
CEJV-WTRAN-006421 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (S207) 5/24/2018
CEJV-WTRAN-006425 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P158a) 5/24/2018
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-006498 Maspero Station - Calculation Note - Roof Slab Detailed Results 5/27/2018
CEJV-WTRAN-006499 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P200)&(P220) 5/27/2018
CEJV-WTRAN-006506 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P112b) 5/27/2018
CEJV-WTRAN-006622 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (S201) 5/29/2018
CEJV-WTRAN-006694 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (S113), (S161) & (P162a) 5/30/2018
CEJV-WTRAN-006696 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P202a),(P202b),(S221)&(P222a) 5/30/2018
CEJV-WTRAN-006700 Maspero Station - Reinforcement - Diaphragm Wall - Steel Cage (P222b) 5/30/2018
CEJV-WTRAN-006706 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P204a) & (P224a) 5/30/2018
CEJV-WTRAN-006764 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (6 Cages) 5/31/2018
CEJV-WTRAN-006861 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (3 Cages S109, S165, P224b) 6/3/2018
CEJV-WTRAN-006905 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P226a) 6/4/2018
CEJV-WTRAN-006911 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (S205) & (S225) 6/4/2018
CEJV-WTRAN-006970 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P228a) 6/5/2018
CEJV-WTRAN-006971 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (P208a, P208b, P210, P228b & P230) 6/5/2018
CEJV-WTRAN-006976 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P112a) 6/5/2018
CEJV-WTRAN-006977 Maspero Station - Diaphragm Walls - Reinforcement - Steel Cages (6 Cages) 6/5/2018
CEJV-WTRAN-006984 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P206b) 6/5/2018
CEJV-WTRAN-007188 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 - Section 6-12E 6/10/2018
CEJV-WTRAN-007203 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (S119) & (S155) 6/10/2018
CEJV-WTRAN-007205 Maspero Station - Soft Gel Plug - Drilling Grid - Box 2 6/10/2018
CEJV-WTRAN-007208 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P118a) 6/10/2018
CEJV-WTRAN-007210 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (S209) & (S229) 6/10/2018
CEJV-WTRAN-007211 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P118b), (P156a) & ( S203) 6/10/2018
CEJV-WTRAN-007316 Maspero Station - Roof Slab Section Reinforcement - Shear & Punching - Additional Reinforcement 6/12/2018
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-007445 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P116b) 6/13/2018
CEJV-WTRAN-007649 Maspero Station - Calculation Note - Impact of the Mall Additional Loads on the D-Wall Thickness 6/19/2018
CEJV-WTRAN-007657 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P158a) 6/19/2018
CEJV-WTRAN-007769 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P162b) 6/21/2018
CEJV-WTRAN-007776 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (S117) 6/21/2018
CEJV-WTRAN-007804 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (S207) & (S227) 6/21/2018
CEJV-WTRAN-008025 Maspero Station - Calculation Note - Diaphragm Wall Design Results - Box 2 Sections 6-11E & 6-13 C 6/26/2018
CEJV-WTRAN-008070 Maspero Station - Roof Slab - Reinforcement - Roof Slab - Box 2B 6/27/2018
CEJV-WTRAN-008189 Maspero Station - Roof Slab Section Reinforcement - Sections - Box 2B 6/28/2018
CEJV-WTRAN-008486 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (8 Cages) 7/5/2018
CEJV-WTRAN-008516 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (7 Cages) 7/8/2018
CEJV-WTRAN-008524 Maspero Station - Diaphragm Walls – Panelling & Guiding Walls 7/8/2018
CEJV-WTRAN-008580 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (P200) & (P220) 7/9/2018
CEJV-WTRAN-008586 Maspero Station - Calculation Note - Ticket Slab Detailed Results 7/9/2018
CEJV-WTRAN-008725 Maspero Station - Calculation Note - Roof Slab Detailed Results 7/12/2018
CEJV-WTRAN-008796 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (P158a) 7/15/2018
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-008979 Maspero Station - Capping Beam Elevation Reinforcement Details-from Axis(X06) to (X01) on Axis(Y18) 7/18/2018
CEJV-WTRAN-009054 Maspero Station - Calculation Note - Intermediate Slab Detailed Results 7/19/2018
CEJV-WTRAN-009057 Maspero Station - Capping Beam Reinforcement Details - on Axes (X01) & (X06) 7/19/2018
CEJV-WTRAN-009134 Maspero Station - Reinforcement - Diaphragm Walls - Steel Cages (6 Cages) 7/22/2018
CEJV-WTRAN-009141 Maspero Station - Capping Beam Reinforcement Details - (3-3 )Box 2a-from Axis(C.L) to Axis(Y06) on Axis(X01) 7/22/2018
CEJV-WTRAN-009187 Maspero Station - Calculation Note - Bracing of HEB Columns between Intermediate Slab and Raft 7/24/2018
CEJV-WTRAN-009380 Maspero Station - Soft Gel Plug - Drilling Grid - Stairs Zone 7/29/2018
CEJV-WTRAN-009456 Maspero Station - Capping Beam Reinforcement Details - Box 1 - 1/3 7/30/2018
CEJV-WTRAN-009476 Maspero Station - Capping Beam Reinforcement Details - Box 1 - 2/3 7/30/2018
CEJV-WTRAN-009560 Maspero Station - Capping Beam Reinforcement Details - Box 1 - 3/3 7/31/2018
CEJV-WTRAN-009851 Maspero Station - Capping Beam Elevation Reinforcement Details - Box 3 - 1/2 8/6/2018
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-010079 Maspero Station - Capping Beam Elevation Reinforcement Details - Box 3 - 2/2 8/9/2018
CEJV-WTRAN-010192 Maspero Station - Roof Slab - Reinforcement - Roof Slab - Box 1 - Shear Reinforcement from Axes (Y01-Y06) 8/12/2018
CEJV-WTRAN-010254 Maspero Station - Roof Slab - Box 1 - Bottom Reinforcement Longitudinal Dir. From Axes (Y01-Y06) 8/13/2018
CEJV-WTRAN-010280 Maspero Station - Capping Beam Elevations - Reinforcement Details - Box 2b 8/14/2018
CEJV-WTRAN-010363 Maspero Station - Calculation Note - Roof Slab Detailed Results 8/15/2018
CEJV-WTRAN-010491 Maspero Station - Roof Slab Box 3 Top Longitudinal Reinforcement 8/16/2018
CEJV-WTRAN-010651 Maspero Station - Reinforcement - Roof Slab - Box 3 - Sections from Axes (Y18-Y13) - 1/2 8/26/2018
CEJV-WTRAN-010653 Maspero Station - Reinforcement - Roof Slab - Box 3 - Sections from Axes (Y18-Y13) - 2/2 8/26/2018
CEJV-WTRAN-010970 Maspero Station - Reinforcement - Roof Slab - Box 1 - Sections from Axes (Y01-Y06/07) 8/30/2018
CEJV-WTRAN-010985 FCR - Maspero Station - Reinforcement - Diaphragm Walls - Steel Cage (S155) 8/30/2018
CEJV-WTRAN-011081 Maspero Station - Raft Slab - Formwork - Plans & Sections 9/2/2018
CEJV-WTRAN-011188 Maspero Station - Capping Beam Elevations Reinforcement Details - from Axis (Y14) to Axis (Y18) on Axis (X01) 9/3/2018
CEJV-WTRAN-011319
Maspero Station - Capping Beam Elevation Reinforcement Details - Box 3 - from Axis (Y18) to Axis (Y14) on Axis 9/5/2018
(X06)
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-011376 Maspero Station - Detailed Design Report - Diaphragm Wall Thickness 9/6/2018
CEJV-WTRAN-011403 Maspero Station - Capping Beam Reinforcement Details - Box 3 - from Axis (X06) to Axis (X01) on Axis (Y18) 9/6/2018
CEJV-WTRAN-011902 Maspero Station - Roof Slab - Reinforcement - Roof Slab - Box 3 - Top Transversal 9/19/2018
CEJV-WTRAN-012148 Maspero Station - Calculation Note - Roof Slab Detailed Results 9/26/2018
CEJV-WTRAN-012258 Maspero Station - Roof Slab - Reinforcement - Roof Slab - Box 2B- Top Longitudinal 9/30/2018
CEJV-WTRAN-012484 Maspero Station - Calculation Note - Ticket Slab Detailed Results 10/4/2018
CEJV-WTRAN-012488 Maspero Station - Roof Slab - Reinforcement - Roof Slab - Box 2b - Shear & Additional 10/4/2018
CEJV-WTRAN-012584 Maspero Station - Roof Slab - Reinforcement - Roof Slab - Box 1 - Shear Reinforcement 10/8/2018
CEJV-WTRAN-012585 Maspero Station - Reinforcement - Roof Slab - Box 3 - Bottom Transversal 10/8/2018
CEJV-WTRAN-012618 FCR - Maspero Station - Roof Slab - Reinforcement - Box 2b - Top Longitudinal Reinforcement 10/8/2018
CEJV-WTRAN-012704 Maspero Station - Reinforcement - Roof Slab – Boxes 1&3 B354 10/10/2018
CEJV-WTRAN-012795 FCR- Maspero Station - Roof Slab - Roof Slab - Box 2b - Bottom Longitudinal Reinforcement 10/11/2018
CEJV-WTRAN-012799 Maspero Station - Roof Slab - Roof Slab - Box 1 - Top Reinforcement Transversal 10/11/2018
CEJV-WTRAN-013045 Maspero Station - Roof Slab - Roof Slab - Box 1 - Top Reinforcement Longitudinal Dir. 10/17/2018
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-013119 Maspero Station - Capping Beam - Reinforcement Details - Box 1 - on Axis (X01) 10/18/2018
CEJV-WTRAN-013121 Maspero Station - Capping Beam - Reinforcement Details - Box 1 - on Axis (X06) 10/18/2018
CEJV-WTRAN-013248 Maspero Station - Roof Slab - Box 1 - Bottom Reinforcement Longitudinal 10/21/2018
CEJV-WTRAN-013459 Maspero Station - Roof Slab - Box 1 - Top Reinforcement Longitudinal 10/24/2018
CEJV-WTRAN-013466 Maspero Station - Ticket Slab - Box 3 - Bottom Transversal Reinforcement 10/24/2018
CEJV-WTRAN-013584 Maspero Station - Ticket Slab - Box 3 - Bottom Longitudinal Reinforcement 10/28/2018
CEJV-WTRAN-013827 Maspero Station - Calculation Note - Connection between Access Escalator and Main Capping Beam 10/31/2018
CEJV-WTRAN-013954 FCR-Maspero Station - Roof Slab - Box 1 - Top Reinforcement Longitudinal Dir. 11/1/2018
CEJV-WTRAN-014005 Maspero Station - Capping Beam and Roof Slab Reinforcement Details - Box 1&2b 11/1/2018
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-014027 FCR-Maspero Station - Capping Beam Elevations - Reinforcement Details - Box 1&2b 11/1/2018
CEJV-WTRAN-014161 FCR-Maspero Station - Ticket Slab - Formwork - Zone 1 - Plan View 11/4/2018
CEJV-WTRAN-014308 Maspero Station - Ticket Slab - Box 3 - Bottom Transversal Reinforcement 11/6/2018
CEJV-WTRAN-014375 Maspero Station - Capping Beam Elevations Reinforcement Details - Box 2A 11/7/2018
CEJV-WTRAN-014436 Maspero Station - Ticket Slab - Box 3 - Bottom Longitudinal Reinforcement 11/8/2018
CEJV-WTRAN-014538
Maspero Station - Roof Slab - Box 2A - Bottom Longitudinal Reinforcement & Ticket Slab - Box 3 - Shear 11/8/2018
Reinforcement
CEJV-WTRAN-014590 Maspero Station - Calculation Note - Ticket Slab Detailed Results 11/11/2018
CEJV-WTRAN-014708 Maspero Station - Ticket Slab Box 3 - Reinforcement - Additional Reinforcement 11/12/2018
CEJV-WTRAN-014725 Maspero Station - Ticket Slab Box 3 - Top Longitudinal Reinforcement 11/12/2018
CEJV-WTRAN-014795 Maspero Station - Roof Slab - Box 2A - Top Transversal Reinforcement 11/14/2018
CEJV-WTRAN-014797 Maspero Station - Roof Slab - Box 2A - Top Longitudinal Reinforcement 11/14/2018
CEJV-WTRAN-014851 Maspero Station - Ticket Slab Box 3 - Top Transversal Reinforcement 11/15/2018
CEJV-WTRAN-015065 Maspero Station - Supplemental Note - East Tympanum Beam of the Ticket Slab 11/19/2018
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-015296 Maspero Station - Columns Reinforcement between Ticket & Roof - Box 3 11/25/2018
CEJV-WTRAN-015311 FCR - Maspero Station - Ticket Slab Box 3 - Additional Reinforcement 11/25/2018
CEJV-WTRAN-015605 Maspero Station - Calculation Note - Intermediate Slab Detailed Results & Columns Design 11/29/2018
CEJV-WTRAN-015609 FCR - Maspero Station - Ticket Slab - Formwork - Zone 3 - Plan View 11/29/2018
CEJV-WTRAN-015753 Maspero Station - Reinforcement - Ticket Slab - BOX 1 & BOX 2B 1/2 12/2/2018
CEJV-WTRAN-015784 Maspero Station - Reinforcement - Ticket Slab - BOX 1 & BOX 2B 2/2 12/2/2018
CEJV-WTRAN-015904 FCR - Maspero Station - Ticket Slab Box 3 - Top Reinforcement 12/4/2018
CEJV-WTRAN-015916
Maspero Station - Calculation Note - Internal Structure - Design Methodology and Model & Ticket Slab Detailed 12/4/2018
Results
CEJV-WTRAN-016016 Maspero Station - Reinforcement - Ticket Slab - BOX 1 & BOX 2B & BOX 3 12/5/2018
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-016062 Maspero Station - Reinforcement - Ticket Slab - BOX 1 & BOX 3 12/6/2018
CEJV-WTRAN-016118 FCR - Maspero Station - Roof Slab - Box 2A - Top Longitudinal Reinforcement 12/6/2018
CEJV-WTRAN-016184 Maspero Station - Reinforcement - Roof Box-2A and Ticket Slab Box-2B 12/9/2018
CEJV-WTRAN-016351 FCR - Maspero Station - Roof Slab - Box 2a - Additional Reinforcement 12/11/2018
CEJV-WTRAN-016453 Maspero Station - Columns Reinforcement between Ticket & Roof - Box 3 12/13/2018
CEJV-WTRAN-016455 FCR - Maspero Station - Ticket Slab - Formwork - Zone 3 - Plan View 12/13/2018
CEJV-WTRAN-016477 FCR - Maspero Station - Capping Beam Elevations Reinforcement Details - Box 2A 12/13/2018
CEJV-WTRAN-016482 Maspero Station - Ticket Slab - Reinforcement - Box 1 - Top Longitudinal Reinforcement 12/13/2018
CEJV-WTRAN-016555 FCR - Maspero Station - Roof Slab - Box 2A - Bottom Longitudinal Reinforcement 12/16/2018
CEJV-WTRAN-016595 FCR - Maspero Station - Roof Slab - Box 2A - Top Transversal Reinforcement 12/17/2018
CEJV-WTRAN-016604 FCR - Maspero Station - Roof Slab - Box 2A- Bottom Longitudinal Reinforcement 12/17/2018
CEJV-WTRAN-016842 FCR - Maspero Station - Roof Slab - Box 2A - Bottom Longitudinal Reinforcement 12/20/2018
CEJV-WTRAN-016878 Maspero Station - Ticket Slab - Box 1 - Bottom and Shear Reinforcement 12/20/2018
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-016952 MASPERO STATION - STAIRS (3&4) & (7&8), ESCALATORS (11&12) & (13&14) - FORMWORK 12/23/2018
CEJV-WTRAN-016955 Maspero Station - Calculation Note - Ticket & Intermediate Slabs Detailed Results 12/23/2018
CEJV-WTRAN-017056 Maspero Station - Ticket Slab - Box 2A - Bottom and Top Transversal Reinforcement 12/24/2018
CEJV-WTRAN-017177 Maspero Station - Ticket Slab - Box 2A - Top Longitudinal & Additional Reinforcement 12/26/2018
CEJV-WTRAN-017259 Maspero Station - Ticket Slab - Box 1 - Top Transversal Reinforcement 12/27/2018
CEJV-WTRAN-017293 Maspero Station - Ticket Slab - Box 1 - Top Longitudinal Reinforcement 12/30/2018
CEJV-WTRAN-017294 Maspero Station - Ticket Slab - Box 2B - Bottom Longitudinal & Bottom Transversal Reinforcement 12/30/2018
CEJV-WTRAN-017378 Maspero Station - Ticket Slab - Box 2B - Top Longitudinal and Transversal Reinforcement 12/31/2018
CEJV-WTRAN-017463 Maspero Station - Ticket Slab - Reinforcement - Box 2A- Sections 1/1/2019
CEJV-WTRAN-017465 Maspero Station - Intermediate Slab - Box 3 – Shear & Top Longitudinal Reinforcement 1/1/2019
CEJV-WTRAN-017619 Maspero Station - Ticket Slab - Box 2a - Sections Reinforcement Details 1/3/2019
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-017783 Maspero Station - Intermediate Slab - Box 3 - Bottom Longitudinal Reinforcement 1/8/2019
CEJV-WTRAN-017909 Maspero Station - Ticket Slab - Box 2a - Bottom Transversal Reinforcement 1/10/2019
CEJV-WTRAN-017913 Maspero Station - Ticket Slab - Box 2a - Top Transversal Reinforcement 1/10/2019
CEJV-WTRAN-017918 Maspero Building Development Assumptions and Constraints Report - Future Maspero Buildings Project 1/10/2019
CEJV-WTRAN-017942 FCR - Maspero Station - Ticket Slab - Box 2b - Additional Reinforcement 1/10/2019
CEJV-WTRAN-018015 Maspero Station - Intermediate Slab - Reinforcement - Box 3 - Bottom & Top Transversal 1/13/2019
CEJV-WTRAN-018019 FCR - Maspero Station - Ticket Slab - Reinforcement - Box 2b - Top Longitudinal &Additional 1/13/2019
CEJV-WTRAN-018070 Maspero Station - Reinforcement - Ticket Slab - Box 2a - Bottom Longitudinal, Shear and Additional 1/14/2019
CEJV-WTRAN-018071 Maspero Station - Reinforcement - Intermediate Slab - Box 2b - Bottom Long & Trans and Shear 1/14/2019
CEJV-WTRAN-018094 Maspero Station - Reinforcement - Ticket Slab - Box 2a - Top Longitudinal 1/15/2019
CEJV-WTRAN-018106 Maspero Station - Columns Reinforcement between Ticket & Roof - Box1 & Box2b 1/15/2019
CEJV-WTRAN-018165 FCR - Maspero Station - Ticket Slab - Reinforcement - Box 2b - Additional Reinforcement 1/15/2019
CEJV-WTRAN-018226 Maspero Station - Columns Reinforcement between Ticket & Roof - Box2a 1/16/2019
CEJV-WTRAN-018331 FCR - Maspero Station - Ticket Slab - Box 2b - Bottom Longitudinal Reinforcement 1/17/2019
CEJV-WTRAN-018332 FCR - Maspero Station - Box 2b - Ticket Slab - Top Transversal Reinforcement 1/17/2019
CEJV-WTRAN-018336 Maspero Station - Intermediate Slab - Box 1 - Bottom Trans & Long Reinforcement 1/17/2019
CEJV-WTRAN-018512 FCR - Maspero Station - Ticket Slab - Box 2a - Additional Reinforcement 1/21/2019
CEJV-WTRAN-018754 FCR - Maspero Station - Ticket Slab - Formwork - Zone 2 - Plan View 1/27/2019
CEJV-WTRAN-018761 Maspero Station - Calculation Note - Intermediate Slab Detailed Results 1/27/2019
CEJV-WTRAN-018864 Maspero Station - Intermediate Slab - Box 3 - Top Longitudinal Reinforcement 1/29/2019
CEJV-WTRAN-019065 Maspero Station - Intermediate Slab - Box 2b - Top Transversal Reinforcement 1/31/2019
CEJV-WTRAN-019086 Maspero Station - Intermediate Slab - Box 1 - Top Longitudinal, Transversal, and Shear Reinforcement 2/2/2019
CEJV-WTRAN-019088 Maspero Station - Intermediate Slab - Box 2b - Top Longitudinal Reinforcement 2/2/2019
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-019091 Maspero Station - Intermediate Sections - Formwork - Section (25-25), (26-26) 2/2/2019
CEJV-WTRAN-019102 Maspero Station - Intermediate Slab - Box 3 - Top Transversal Reinforcement 2/2/2019
CEJV-WTRAN-019242 Maspero Station - Intermediate Slab - Box 2b – Bottom, Shear and Additional Reinforcement 2/4/2019
CEJV-WTRAN-019417 Maspero Station - Intermediate Slab - Box 1 - Bottom and Additional Reinforcement 2/6/2019
CEJV-WTRAN-019569 Maspero Station - Intermediate Slab - Box 3 - Top Transversal and Additional Reinforcement 2/9/2019
CEJV-WTRAN-019728 Maspero Station - Intermediate Slab - Box 3 - Top Longitudinal Reinforcement 2/11/2019
CEJV-WTRAN-019870 FCR - Maspero Station - Intermediate Slab - Box 3 - Bottom Transversal Reinforcement 2/12/2019
CEJV-WTRAN-020032 Maspero Station - Intermediate Slab - Box 2b – Bottom, Top and Additional Reinforcement 2/14/2019
CEJV-WTRAN-020170 Maspero Station - Intermediate Slab -Box 2a – Shear & Bottom Transversal Reinforcement 2/17/2019
CEJV-WTRAN-020176 Maspero Station - Intermediate Slab -Box 2a –Bottom Longitudinal Reinforcement 2/17/2019
CEJV-WTRAN-020383 Maspero Station - Intermediate Slab - Box 2b - Bottom Longitudinal Reinforcement 2/19/2019
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-020389 Maspero Station - Raft Slab - Box 3 - Bottom and Top Reinforcement 2/20/2019
CEJV-WTRAN-020635 Maspero Station - Waller Beams - Around Break Out - At Level (+0.500) 2/23/2019
CEJV-WTRAN-020644 Maspero Station - Columns Reinforcement between Ticket & Roof - Box 1, 2A & 2B 2/23/2019
CEJV-WTRAN-020691 Maspero Station - Intermediate Slab - Box 1 - Bottom & Additional Reinforcement 2/24/2019
CEJV-WTRAN-020832 3-FCRs - Maspero Station - Intermediate Slab - Box 2b, Box 1 Reinforcement & Columns Connection 2/25/2019
CEJV-WTRAN-020835 Maspero Station - Intermediate Slab - Box 2a - Top Longitudinal Reinforcement 2/25/2019
CEJV-WTRAN-020959 Maspero Station - Intermediate Sections - Formwork - Section (25-25), (26-26) 2/27/2019
CEJV-WTRAN-021004 Maspero Station - Columns Reinforcement between Intermediate & Ticket 2/28/2019
CEJV-WTRAN-021005 Maspero Station - Raft Slab - Box 2b Bottom & Top Tran Rft, and Box 3 Additional & Shear Rft 2/28/2019
CEJV-WTRAN-021065 Maspero Station - Intermediate Slab - Box 2a - Bottom Long & Tran Reinforcement 2/28/2019
CEJV-WTRAN-021073 Maspero Station - Raft Slab - Box 2b - Top Longitudinal Reinforcement 2/28/2019
CEJV-WTRAN-021105 FCR - Maspero Station - Intermediate Slab - Formwork - Zone 2 - Plan View 3/2/2019
CEJV-WTRAN-021128 Maspero Station - Intermediate Slab - Box 2a - Top Transversal Reinforcement 3/2/2019
CEJV-WTRAN-021131 Maspero Station - Raft Slab - Box 2b - Bottom Longitudinal Reinforcement 3/2/2019
CEJV-WTRAN-021192 Maspero Station - Intermediate Slab - Box 1 - Top Reinforcement Transversal 3/3/2019
CEJV-WTRAN-021267 Maspero Station - Intermediate Slab - Box 1 - Top Longitudinal Reinforcement 3/4/2019
CEJV-WTRAN-021287 Maspero Station - Intermediate Slab - Box 2a - Top Longitudinal Reinforcement 3/4/2019
CEJV-WTRAN-021316 Maspero Station - Ring Beam - Break Out - Concrete Dimensions and Reinforcement 3/5/2019
CEJV-WTRAN-021382 Maspero Station - Calculation Note - Diaphragm Wall Thickness Impact 3/5/2019
CEJV-WTRAN-021633 FCR - Maspero Station - Intermediate Slab - Box 1 - Top Reinforcement Transversal 3/7/2019
CEJV-WTRAN-021639 FCR - Maspero Station - Intermediate Slab - Box 2a - Top Transversal Reinforcement 3/9/2019
CEJV-WTRAN-021640 Maspero Station - Raft Slab - Box 3 - Section Reinforcement – Parts (1-4)&(2-4) 3/9/2019
CEJV-WTRAN-022725 Maspero Station - Concrete Dimensions, Ring Beam - Break Out & Bar List 3/21/2019
CEJV-WTRAN-022794 Maspero Station - Calculation Note - Design of Internal Stairs 1 &2 and Escalators 5, 6, 7, 8, 9 & 10 3/24/2019
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-022815 Maspero Station - Raft Slab - Reinforcement - Raft Slab - Box 3 3/24/2019
CEJV-WTRAN-022943 Maspero Station - Concrete Dimensions - Ring Beam - Break In & Bar List 3/25/2019
CEJV-WTRAN-023316 Maspero Station - Raft Slab - Reinforcement - Box 2B & Box 2A 3/31/2019
CEJV-WTRAN-023556 Maspero Station - Calculation Note - As Built of Steel Columns - Design Check for Effective Deviation 4/1/2019
CEJV-WTRAN-023646 Maspero Station - Edge Beam - Raft Watertightness - Zone 3 - Formwork & Reinforcement 4/3/2019
CEJV-WTRAN-023667 Maspero Station - Raft Slab - Box 2b - Bottom & Top Transversal Reinforcement 4/3/2019
CEJV-WTRAN-023696 Maspero Station - Raft Slab - Box 2b - Bottom Longitudinal Reinforcement 4/4/2019
CEJV-WTRAN-023790 Maspero Station - Raft Slab – Formwork Plans and Sections 4/4/2019
CEJV-WTRAN-024090 Maspero Station - Raft Slab - Box 1 - Top Trans and Long RFT & Bottom Trans RFT 4/9/2019
CEJV-WTRAN-024091 Maspero Station - Raft Slab - Reinforcement - Box 2b & Box 1 --- Wrong Titles 4/9/2019
CEJV-WTRAN-024131 Maspero Station - Columns Reinforcement between Ticket & Roof - Box 3 & Box 1 4/10/2019 Terminated
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-024181 Maspero Station - Columns Reinforcement between Ticket & Roof - Box 3 & Box 1 4/11/2019
CEJV-WTRAN-024335 Maspero Station - Raft Slab - Box 3 - Bottom Transversal Reinforcement 4/14/2019
CEJV-WTRAN-024497 Maspero Station - Columns Reinforcement between Ticket & Roof - Box 2b 4/16/2019
CEJV-WTRAN-024524 Maspero Station - Raft Slab - Box 3 - Bottom Longitudinal Reinforcement & Box 1 - Section 4/16/2019
CEJV-WTRAN-024568 Maspero Station - Elevator Shafts 1 & 2 - Plans & Sections 4/17/2019
CEJV-WTRAN-024623 Maspero Station - Edge Beam - Raft Watertightness - Zone 3 - Formwork & Reinforcement 4/17/2019
CEJV-WTRAN-025636 FCR - Maspero Station - Raft Sections - Formwork - Section (A-A) - Parts 5/6/2019
CEJV-WTRAN-025684 FCR - Maspero Station - Raft Slab - Box 3 - Bottom & Top Long. & Trans. Reinforcement 5/6/2019
CEJV-WTRAN-025720 Maspero Station - Raft Slab Box 1 - Reinforcement - Top Transversal and Longitudinal 5/7/2019
CEJV-WTRAN-025934 Maspero Station - Raft Slab - Box 1 & Box 2A - Reinforcement 5/9/2019
CEJV-WTRAN-025969 Maspero Station - Raft Slab - Box 2b - Bottom Transversal Reinforcement 5/9/2019
CEJV-WTRAN-026154 Maspero Station - Calculation Note - As Built of Steel Columns - Design Check for Effective Deviation 5/13/2019
CEJV-WTRAN-026160 Maspero Station - Columns Reinforcement between Roof & Raft - Box 3 – “8” Columns 5/13/2019
CEJV-WTRAN-026183 Maspero Station - Raft Slab - Reinforcement - Box 2A & Box 1 5/13/2019
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-026551 Maspero Station - Calculation Note Impact of the Leakage on the Raft and Barrettes - Box 1 5/16/2019
CEJV-WTRAN-026610 Maspero Station - Raft Slab - Box 3 and Box 2A – Reinforcement 5/19/2019
CEJV-WTRAN-026632 Maspero Station - Calculation Note - Raft Slab - Response to FCR 404-G-JVC-054-F-033 5/19/2019
CEJV-WTRAN-026633 Maspero Station - Calculation Note - Design of Internal Stairs 1 &2 and Escalators 5, 6, 7, 8, 9 & 10 5/19/2019
CEJV-WTRAN-026773 FCR - Maspero Station - Raft Slab - Box 3 - Bottom & Top Long. & Trans. Reinforcement 5/20/2019
CEJV-WTRAN-026809 FCR - Maspero Station - Raft Slab - Box 3 - Bottom Transversal Reinforcement 5/20/2019
CEJV-WTRAN-027114 Maspero Station - Columns Reinforcement between Roof & Raft - Box 2B – “5” Columns 5/22/2019
CEJV-WTRAN-027164 Maspero Station - Edge Beam - Raft Watertightness - Zone 2b - Formwork & Reinforcement 5/23/2019
CEJV-WTRAN-027387 Maspero Station - Raft Slab - Box 2A - Tank Section Reinforcement 5/27/2019
CEJV-WTRAN-027435 Maspero Station - Columns Reinforcement between Roof & Raft - Box 1 – “3” Columns 5/27/2019
CEJV-WTRAN-027506 Maspero Station - Columns Reinforcement between Roof & Raft - Box 1 – “2” Columns 5/28/2019
CEJV-WTRAN-027622 Maspero Station - Columns Reinforcement between Roof & Raft - Box 1 – “1” Column 5/29/2019
CEJV-WTRAN-027646 Maspero Station - Raft Slab - Box 3 - Bottom & Top Longitudinal Reinforcement 5/30/2019
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-027696 Maspero Station - Columns Reinforcement between Roof & Raft - Box 1 – “3” Columns 5/30/2019
CEJV-WTRAN-027814 Maspero Station - Columns Reinforcement between Roof & Raft - Box 1 - Column (C32) 6/2/2019
CEJV-WTRAN-027828 FCR - Maspero Station - Raft Slab - Box 3 - Bottom & Top Longitudinal Reinforcement 6/2/2019
CEJV-WTRAN-027994 Maspero Station - Columns Reinforcement between Roof & Raft - Box 2A - Columns (C06) & (C09) 6/3/2019
CEJV-WTRAN-028009 FCR - Maspero Station - Raft Slab - Box 1 – Bottom & Top Longitudinal Reinforcement 6/3/2019
CEJV-WTRAN-028224 Maspero Station - Raft Slab - Formwork - Zone 1 - Plan View 6/9/2019
CEJV-WTRAN-028230 Maspero Station - Calculation Note - Diaphragm Wall Thickness Impact 6/10/2019 Terminated
CEJV-WTRAN-028368 Maspero Station - Calculation Note - Diaphragm Wall Thickness Impact 6/11/2019
CEJV-WTRAN-028419 Maspero Station - Columns Reinforcement between Roof & Raft - Box 2A – “7” Columns 6/12/2019
CEJV-WTRAN-028500 FCR - Maspero Station - Raft Slab - Formwork - Zone 3 - Plan View 6/13/2019
CEJV-WTRAN-028508 Maspero Station - Columns Reinforcement between Roof & Raft - Box 3 – “8” Columns 6/13/2019
CEJV-WTRAN-028612 Maspero Station - Calculation Note - As Built of Steel Columns - Design Check for Effective Deviation 6/16/2019
CEJV-WTRAN-028749 Maspero Station - Columns Reinforcement between Roof & Raft - Box 2B - Column (C22) 6/18/2019
CEJV-WTRAN-029048 Maspero Station - Report on the Water Spring Occurred In Box 2 6/24/2019
CEJV-WTRAN-029227 Maspero Station - Roof Slab – Formwork, Dovetail Details & Columns Correction 6/26/2019
CEJV-WTRAN-029580 Maspero Station - Columns Reinforcement between Roof & Raft - Box 3 - Columns (C15 & C19) 7/3/2019
CEJV-WTRAN-029600 Maspero Station - Columns Reinforcement between Roof & Raft - Box 3 - Columns (C16, C17 & C18) 7/3/2019
CEJV-WTRAN-029686 Maspero Station - Raft Slab -Boxes 1 & 2B - Additional Reinforcement 7/4/2019
CEJV-WTRAN-029712 Maspero Station - Calculation Note - As Built of Steel Columns - Design Check for Effective Deviation 7/4/2019
CEJV-WTRAN-029838 Maspero Station - Geo-Hydraulic Model Calculation - Relief Wells for Pumping Test 7/8/2019
CEJV-WTRAN-030242 Maspero Station - Columns Reinforcement between Roof & Raft – Boxes 1&3 “13” Columns 7/11/2019
CEJV-WTRAN-030387 Maspero Station - Design of Internal Stairs 1 &2 and Escalators 5, 6, 7, 8, 9 & 10 7/14/2019
CEJV-WTRAN-030408 Maspero Station - Calculation Note - Effect of Change in Water Level on the Diaphragm Wall with FE Model 7/15/2019
CEJV-WTRAN-030420 Maspero Station - Columns Reinforcement between Roof & Raft – Box 2A “9” Columns 7/15/2019
CEJV-WTRAN-030613 Maspero Station - Raft Slab - Formwork - Zone 3 - Plan View 7/18/2019
CEJV-WTRAN-030649 Maspero Station - Columns Reinforcement between Roof & Raft – Box 2B “6” Columns 7/18/2019
Document No Submission Received Date Review Date Notes
CEJV-TRANSMIT-001805 Maspero Station - Drainage Line to the Nile from Maspero 7/24/2019
CEJV-WTRAN-030993 FCR - Maspero Station - Fixation between Masonry and Concrete Columns 7/25/2019
CEJV-WTRAN-031003 FCR - Maspero Station - Columns Reinforcement between Roof & Raft - Box 3 - Columns 7/25/2019
CEJV-WTRAN-031150 FCR - Maspero Station - Columns Reinforcement between Roof & Raft - Box 1, 2A, 2B & 3 7/29/2019
CEJV-WTRAN-031246 Maspero Station - Edge Beam - Raft Watertightness - Zone 1 - Formwork & Reinforcement 7/29/2019
CEJV-WTRAN-031381 FCR - Maspero Station - Raft Slab - Formwork - Zone 1 - Plan View 7/31/2019
CEJV-WTRAN-031504 Maspero Station - Design Of Internal Stairs 3&4&5&6&7&8&9&10 and Escalators 13&14&15&16&17&18 8/1/2019
CEJV-WTRAN-031649 Maspero Station - Raft Slab - Formwork - Zone 1 - Plan View 8/4/2019
CEJV-WTRAN-031754 Maspero Station - Columns Reinforcement between Roof & Raft – Boxes 1&2A “4” Columns 8/5/2019
CEJV-WTRAN-031808 FCR - Maspero Station - Raft Slab - Formwork - Zone 1 - Plan View 8/6/2019
CEJV-WTRAN-031809 FCR - Maspero Station - Raft Slab - Box 1 - Bottom & Top Longitudinal & Transversal Reinforcement 8/6/2019
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-031962 FCR - Maspero Station - Raft Slab - Formwork - Zone 1 - Plan View 8/7/2019
CEJV-WTRAN-031963 FCR - Maspero Station - Raft Slab - Box 1 - Additional Reinforcement 8/7/2019
CEJV-WTRAN-032467 FCR - Maspero Station - Raft Slab - Formwork - Zone 1 - Plan View 8/20/2019
CEJV-WTRAN-032749 FCR - Maspero Station - Columns Reinforcement between Roof & Raft - Box 1, 2a, 2b & 3 8/25/2019
CEJV-WTRAN-032753 Maspero Station - Additional outside Slurry Walls - Guide Wall 8/25/2019
CEJV-WTRAN-032828 FCR - Maspero Station - Raft Slab - Formwork - Zone 2 - Plan View 8/26/2019
CEJV-WTRAN-032955 Maspero Station - Roof Slab - Formwork - Zones 2&3 - Plan View 8/28/2019
CEJV-WTRAN-033582 Maspero Station - Calculation Note - Design of Platform Slab - Part (1/2) 9/8/2019
CEJV-WTRAN-033798 Maspero Station - Columns Reinforcement between Roof & Raft - Box 2A - Column (C10) 9/12/2019
CEJV-WTRAN-034608 Maspero Station - Calculation Note - Mezzanine Slab at Level +16.47 9/24/2019
CEJV-WTRAN-034709 Maspero Station - Calculation Note - Effect of Change in Water Level on the Diaphragm Wall with FE Model 9/25/2019
CEJV-WTRAN-034722 Maspero Station - Analysis of Consultant Proposal during Maspero Meeting Dated 19-09-2019 9/25/2019
CEJV-WTRAN-035020 Maspero Station - Reinforcement - Box 3 - Mezzanine Slab Rft Detailed at Level 16.470 9/30/2019
CEJV-WTRAN-035377 Maspero Station - Edge Beam - Raft Watertightness - Zone 1 - Formwork & Reinforcement 10/7/2019
CEJV-WTRAN-035534 Maspero Station - Edge Beam - Raft Watertightness - Zone 2A - Formwork & Reinforcement 10/8/2019
FCR - Maspero Station - Reinforcement - Stair 1, Escalator 5,6,7 - Plan View and Detail of Columns 10/10/2019
CEJV-WTRAN-035848 Maspero Station - Soft Gel Plug - Drilling Grid - Stairs Zone 10/13/2019 Done
CEJV-WTRAN-035952 Maspero Station - Reinforcement - Roof Slab Box (1&3) Precast Beams Reinforcement 10/14/2019
FCR - Maspero Station - Raft Slab - Box 2a - Top Transversal Reinforcement from Axes (C.L-Y06) 10/14/2019
CEJV-WTRAN-035974 Maspero Station - Report - Impact of Water Seepage on D-Wall 10/14/2019 Done
CEJV-WTRAN-035976 Maspero Station - Box 3 - Permanent Strut at Axes (Y12&Y13) and Axes (Y14&Y15) 10/14/2019
FCR - Maspero Station - Raft Slab - Formwork - Zone 2 - Plan View 10/14/2019 Done
FCR - Maspero Station - Raft Slab - Box 2a - Bottom Trans. RFT from Axes (Y07-Cl) 10/14/2019 Done
CEJV-WTRAN-036401 Maspero Station - Raft Slab - Box 2A - Tank Section Reinforcement 10/17/2019
CEJV-WTRAN-036452 Maspero Station - Reinforcement - Box 3 - Mezzanine Slab Rft Detailed at Level 16.470 10/17/2019
CEJV-WTRAN-036525 Maspero Station - Platform Slab - Formwork - Zone 3 - Plan View 10/17/2019
CEJV-WTRAN-036581
Maspero Station - Roof Slab Box (2) Precast Beams Reinforcement - Opening (R2&R3) - Precast Type 10/20/2019
(T250/700-1050-7.96)
CEJV-WTRAN-036592 Maspero Station - 15th May Bridge Analysis - Technical Report Visit 03/10/2019 10/20/2019
CEJV-WTRAN-036660 Maspero Station - Ticket & Intermediate Slabs Openings- Precast Beams Reinforcement 10/20/2019
FCR - Maspero Station - Raft Slab - Box 3 - Bottom & Top Longitudinal & Transversal Reinforcement 10/20/2019 Done
CEJV-WTRAN-036728 Maspero Station - Calculation Note - Design of Platform Slab - Part (1/2) 10/21/2019
CEJV-WTRAN-036956 Maspero Station - Platform Slab - Zone 3 - Additional & Shear Reinforcement 10/23/2019
CEJV-WTRAN-036978 Maspero Station - Reinforcement - Box 3 - Mezzanine Slab Rft Detailed at Level 16.470 10/23/2019
CEJV-WTRAN-037073 Maspero Station - Calculation Note - Mezzanine Slab at Level +16.47 10/24/2019
FCR - Maspero Station - Box 3 - Mezzanine Slab Reinforcement Detailed @ Level 16.470 10/24/2019
CEJV-WTRAN-037235 Maspero Station - Roof Slab - Formwork - Zone 3 - Plan View 10/27/2019
FCR - Maspero Station - Box 3 - Mezzanine Slab Reinforcement Detailed @ Level 16.470 10/29/2019
CEJV-WTRAN-037658 Maspero Station - Reinforcement - Roof Slab Box (1&3) Precast Beams Reinforcement 10/30/2019
CEJV-WTRAN-037694 Maspero Station - Platform Slab - Box 3 - Top & Bot Transversal Reinforcement 10/31/2019
CEJV-WTRAN-037695 Maspero Station - Reinforcement - Column under Platform Box 3 North Direction 10/31/2019
CEJV-WTRAN-037719 Maspero Station - Calculation Note - Design of Platform Slab Part 2-2 10/31/2019
CEJV-WTRAN-037731 Maspero Station - Stair 10 & Escalator 18 Parapet & Earthing Reinforcement 10/31/2019
CEJV-WTRAN-037933 Maspero Station - Platform Slab - Formwork - Zone 1 - Plan View 11/3/2019
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-038028 Maspero Station - Reinforcement - Stair 9 & Escalator 17 Parapet and Earthing Details 11/4/2019
FCR - Maspero Station - Box 3 - Mezzanine Slab Reinforcement Detailed @ Level 16.470 - 3 11/4/2019
FCR - Maspero Station - Raft Slab Box 2A- Additional Reinforcement 11/4/2019 Done
CEJV-WTRAN-038102 Maspero Station - Calculation Note - Water Tank Top Slab & Walls 11/4/2019
CEJV-WTRAN-038200 Maspero Station - Box 3 - Permanent Strut at Axes (Y12&Y13) And Axes (Y14&Y15) - Sections 11/5/2019
FCR - Maspero Station - Roof Slab - Formwork - Zone 3 - Plan View 11/6/2019
FCR - Maspero Station - Columns Reinforcement between Roof & Raft - Box 2A - Column (C09) & Additional 11/6/2019
Reinforcement from Axes (C.L-Y06)
FCR - Maspero Station - Roof Slab Box (1&3) Precast Beams Reinforcement 11/6/2019
FCR - Maspero Station - Raft Slab - Box 3 & 2A & 2B - Shear Reinforcement 11/6/2019
CEJV-WTRAN-038312 Maspero Station - Ticket Slab Box (1 & 3) Precast Beams Reinforcement - Opening (T1 & T4) 11/6/2019
CEJV-WTRAN-038358 Maspero Station - Platform Slab - Formwork - Zone 2 - Plan View 11/7/2019
CEJV-WTRAN-038426 Maspero Station - Intermediate Slab Box (1 & 3) Precast Beams Reinforcement - Opening (I1 & I4) 11/7/2019
CEJV-WTRAN-038428 Maspero Station - Roof Slab Box (2) Precast Beams Reinforcement - Opening (R2&R3) 11/7/2019
CEJV-WTRAN-038432 Maspero Station - Reinforcement - Raft Slab Box 2 Wall/Roof Tank RFT Details 11/7/2019
CEJV-WTRAN-038483 Maspero Station - Intermediate Slab Box (1-2A & 3) Precast Beams Reinforcement - Opening (I1-I4 & I2) 11/10/2019
CEJV-WTRAN-038491 Maspero Station - Reinforcement - Stair 5&Escalator 15, Stair 8&Escalator 14, and Stair 4&Escalator 12 11/10/2019
FCR - Maspero Station - Raft Slab - Formwork - Partial Plans - Plan A & Plan B 11/10/2019
CEJV-WTRAN-038695 Maspero Station - Stairs 4 And 8 & Escalators 12 And 14 Parapet & Earthing Reinforcement 11/12/2019
CEJV-WTRAN-038706 Maspero Station - Platform Slab - Box 2B – Top & Bottom Reinforcement Longitudinal Direction 11/12/2019
FCR - Maspero Station - Raft Slab - Box 2A - Tank Section Reinforcement 11/12/2019
FCR - Maspero Station - Raft Slab - Formwork - Zone 2 - Plan View & Sections 11/12/2019 Terminated
CEJV-WTRAN-038851 Maspero Station - Reinforcement - Stair 7 & Escalator 13 and Stair 3 & Escalator 11 - Box 1 11/13/2019
CEJV-WTRAN-038856 Maspero Station - Reinforcement - Platform Slab - Zone 3 - Additional & Shear RFT 11/13/2019
CEJV-WTRAN-038990 Maspero Station - Calculation Note - Design of Platform Slab - Part (1/2) 11/14/2019
FCR - Maspero Station - Roof & Intermediate Slab Boxes Precast Beams Reinforcement 11/14/2019
CEJV-WTRAN-039128 Maspero Station - Reinforcement - Column under Platform Box 3 South Direction 11/17/2019
CEJV-WTRAN-039139 Maspero Station - Reinforcement - Platform Slab - Box 2B – longitudinal Direction 11/17/2019
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-039159 Maspero Station - Platform Slab - Zone 3 - Additional & Shear Reinforcement 11/17/2019
CEJV-WTRAN-039368 Maspero Station - Platform Slab Box 2B Bottom and Top Reinforcement Transversal Direction 11/19/2019
CEJV-WTRAN-039529 Maspero Station - Platform Slab Box 2b (North) Additional & Shear Reinforcement 11/20/2019
CEJV-WTRAN-039863 Maspero Station - Reinforcement - Box 2 - Elevator Shaft (1) Details on Axes (Y09, X05) 11/26/2019
CEJV-WTRAN-039865 Maspero Station - Civil Work - Formwork - Precast Beams - Temporary Openings - Plans, Sections & Details 11/26/2019
CEJV-WTRAN-039866 Maspero Station - Platform Slab - Box 1 - Bottom Reinforcement Longitudinal 11/26/2019
CEJV-WTRAN-039920 Maspero Station - Platform Slab - Box 1 - Top Reinforcement Longitudinal 11/26/2019
CEJV-WTRAN-039963 Maspero Station - Reinforcement - Platform Slab Box 2a - Additional & Shear RFT. 11/27/2019
FCR - Maspero Station - Reinforcement & Bar Bending Schedule - Intermediate Slab - Boxs 1 & 2A & 2B & 3 11/28/2019
CEJV-WTRAN-040214 Maspero Station - Reinforcement - Column under Platform Box 3 North Direction 12/1/2019
CEJV-WTRAN-040251 Maspero Station - Formwork - External Access Stair & Escalator No (1&2) 12/1/2019
CEJV-WTRAN-040256 Maspero Station - Formwork - External Access Stair & Escalator No. (3&4) 12/1/2019
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-040261 Maspero Station - Reinforcement - Access Stair 2 & Escalator 2 and Access Stair 3 & Escalator 3 12/1/2019
CEJV-WTRAN-040447 Maspero Station - Reinforcement - Platform Slab - Box 3 (North) Sections 12/3/2019
CEJV-WTRAN-040566 Maspero Station - Calculation Note - External Stairs Access Raft No. (01,02,03,04) 12/4/2019
CEJV-WTRAN-040639 Maspero Station - Platform Slab - Box1 (South) Additional & Shear Reinforcement 12/5/2019
CEJV-WTRAN-040675 Maspero Station - Reinforcement - Access Stair 1 & Escalator 1 and Access Stair 4 & Escalator 4 12/8/2019
CEJV-WTRAN-041089 Maspero Station - Reinforcement - Column under Platform Box 3 South Direction 12/11/2019
CEJV-WTRAN-041158 Maspero Station - Formwork - Platform Slab - Zone 3 - Plan View 12/12/2019
CEJV-WTRAN-041380 Maspero Station - Reinforcement - Stair 3 & Escalator 3 and Stair 4 & Escalator 4 12/15/2019
CEJV-WTRAN-041412 Maspero Station - Calculation Note - Roof of External Access Stairs and Escalator 12/15/2019
FCR - Maspero Station - Roof & Ticket Slab - Box 3 - Top Longitudinal Reinforcement 12/16/2019
CEJV-WTRAN-041484 Maspero Station - Platform Slab - Zone 3 (North) - Additional & Shear RFT. 12/16/2019
CEJV-WTRAN-041521 Maspero Station - Reinforcement - Stair 1 & Escalator 1 and Stair 2 & Escalator 2 12/16/2019
CEJV-WTRAN-041547 Maspero Station - Reinforcement - Column under Platform Box 3 North Direction 12/16/2019
CEJV-WTRAN-041643
Maspero Station - Design Of Internal Stairs 3&4&5&6&7&8&9&10 and Escalators 12/17/2019
11&12&13&14&15&16&17&18
CEJV-WTRAN-041693 Maspero Station - Calculation Note - Elevators Shaft Design at Axe (Y09) 12/17/2019
CEJV-WTRAN-041852 Maspero Station - Civil Work - Formwork - External Access Stair & Escalator No. (3&4) 12/19/2019
CEJV-WTRAN-041901 Maspero Station - Reinforcement - Column under Platform Box 2 - From Axes (Y07-Y13) 12/19/2019
CEJV-WTRAN-042115 Maspero Station - Platform Slab - Formwork - Zone 1 & 2 - Plan View 12/23/2019
CEJV-WTRAN-042212 Maspero Station - Ticket Slab - Formwork - Zone 3 - Plan View 12/24/2019
CEJV-WTRAN-042429 Maspero Station - Column under Platform Box 1 North & South Direction 12/26/2019
CEJV-WTRAN-042486 Maspero Station - Formwork - Precast Units under Platform - Plan, Sections & Details 12/26/2019
FCR - Maspero Station - Reinforcement - Column under Platform Box 3 South Direction F-080 12/29/2019
FCR - Maspero Station - Reinforcement - Platform Slab - Zone 3 - Additional & Shear Reinforcement - F-480 12/29/2019
CEJV-WTRAN-042656 Maspero Station - Ring Beam - Break Out - Concrete Dimensions, Ring Beam - Break Out 12/30/2019
CEJV-WTRAN-042665 Maspero Station - Platform Slab - Zone 3 - Additional & Shear Reinforcement 12/30/2019
CEJV-WTRAN-042789 Maspero Station - Platform Slab - Box 1 - Sections Reinforcement (South) 12/31/2019
CEJV-WTRAN-042791 FCR - Maspero Station - Intermediate Slab - Formwork - Zone 2 - Plan View 12/31/2019
CEJV-WTRAN-042814 Maspero Station - Reinforcement - Box 2 - Elevator Shaft (1) Details 12/31/2019
CEJV-WTRAN-042894 Maspero Station - Calculation Note - Design of Platform Slab - Parts (1/2) & (2/2) - Only Excel 1/1/2020
CEJV-WTRAN-042922 Maspero Station - Platform Slab - Zone 3 - Additional & Shear Reinforcement 1/1/2020
CEJV-WTRAN-042991 Maspero Station - Reinforcement - Box 2 - Elevator Shaft (2) Details 1/2/2020
CEJV-WTRAN-043190 Maspero Station - Reinforcement - Stair 9 & Escalator 17 and - Stair 10 & Escalator 18 1/5/2020
CEJV-WTRAN-043244 Maspero Station - Reinforcement - Air Exhaust 1 & Air Intake 1 1/6/2020
CEJV-WTRAN-043368 Maspero Station - Platform Slab - Zone 3 (North) - Additional & Shear Reinforcement 1/8/2020
CEJV-WTRAN-043374 Maspero Station - Reinforcement - Ticket Slab at Level (+12.870) - Access Slab 1/8/2020
CEJV-WTRAN-043667 Maspero Station - Civil Work - Formwork - Super Structure - Air Exhaust & Emergency Ladder for R.S 1/9/2020
FCR - Maspero Station - Stair 2, Escalator 8,9,10 - Formwork - Plan View, Sections F-022 1/12/2020
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-043889 Maspero Station - Reinforcement - Precast Walls under Platform - Fabrication Details 1/13/2020
CEJV-WTRAN-044063 Maspero Station - Platform Slab Box 2B (South) Additional & Shear Reinforcement 1/14/2020
CEJV-WTRAN-044628 Maspero Station - Reinforcement - Precast Walls under Platform-Fabrication Details 1/21/2020
CEJV-WTRAN-044638
Maspero Station - Civil Work - Formwork - Super Structure - Air Intake (RS) & Spiral Stair Opening & Material 1/21/2020
Handling Opening
CEJV-WTRAN-044648 Maspero Station - Stairs (3&4), Escalators (11&12) & Stairs (7&8), Escalators (13&14) - Formwork 1/21/2020
CEJV-WTRAN-044913 Maspero Station - Reinforcement - Stair 6 & Escalator 16, Stair 4 & Escalator 12 and Stair 3 & Escalator 11 1/23/2020
FCR - Maspero Station - Reinforcement - Column under Platform Box 2- F-852 - A 1/23/2020
FCR - Maspero Station - Reinforcement - Column under Platform Box 2- F-852 -B 1/27/2020
FCR - Maspero Station - Reinforcement - Stair 2, Escalator 8,9,10 - Plan View & Detail of Columns F-082 1/27/2020
CEJV-WTRAN-045233 Maspero Station - Reinforcement - Stair 7 & Escalator 13, Stair 8 & Escalator 14 1/27/2020
FCR - Maspero Station - Reinforcement - Stair 1, Escalator 5,6,7 - Plan View and Detail of Columns F-057 1/28/2020
CEJV-WTRAN-045691 Maspero Station - Walls Under Platform - Elevation Reinforcement - Box 3 1/30/2020
CEJV-WTRAN-045830 Maspero Station - Reinforcement - Precast Walls under Platform-Fabrication Details 2/2/2020
CEJV-WTRAN-045960 Maspero Station - Stairs (5&6), Escalators (15&16) & Stairs (9&10), Escalators (17&18) - Formwork 2/3/2020
CEJV-WTRAN-046024 Maspero Station - Formwork - Precast Units under Platform - Plan, Sections & Details 2/4/2020
CEJV-WTRAN-046116 Maspero Station - Reinforcement - Spiral Stair & Air Intake RS & Material Opening 2/5/2020
CEJV-WTRAN-046223 Maspero Station - Reinforcement - Precast Walls under Platform - Fabrication Details 2/6/2020
FCR - Maspero Station - Reinforcement - Column under Platform & Platform Slab - Box 2 F-852-C 2/9/2020
CEJV-WTRAN-046356 Maspero Station - Reinforcement - Precast Walls under Platform - Fabrication Details 2/9/2020
CEJV-WTRAN-046357 Maspero Station - Reinforcement - Precast Walls under Platform - Fabrication Details 2/9/2020
CEJV-WTRAN-046410 Maspero Station - Reinforcement - Ticket Slab at Level (+12.870) - Access Slab 2/9/2020
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-046433 Maspero Station - Reinforcement - Box 2 - Elevator Shaft (2) Details 2/10/2020 Terminated
CEJV-WTRAN-046530 Maspero Station - Reinforcement - Precast Walls under Platform - Fabrication Details 2/11/2020
CEJV-WTRAN-046569 Maspero Station - Reinforcement - Precast Walls under Platform - Fabrication Details 2/11/2020
CEJV-WTRAN-046718 Maspero Station - Reinforcement - Box 2 - Elevator Shaft (2) Details 2/12/2020
CEJV-WTRAN-047079 Maspero Station - Walls under Platform - Elevation Reinforcement - Box 3 2/17/2020
FCR - Maspero Station - Reinforcement - Intermediate Slab - Box (1 & 3) F-090-B 2/19/2020
CEJV-WTRAN-047623 Maspero Station - Calculation Note - Roof Of External Access Stairs and Escalator 2/24/2020
FCR - Maspero Station - Reinforcement - Intermediate Slab - Box (1 & 3) F-090-C 2/24/2020
CEJV-WTRAN-047870 Maspero Station - Reinforcement - Walls under Platform - Stage 2 - Box 3 2/26/2020
FCR - Maspero Station - Roof Slab Box (1,2&3) Precast Beams Reinforcement F-085 2/27/2020
CEJV-WTRAN-047929 Maspero Station - Concrete Dimensions - Ring Beam - Break In & Bar List 2/27/2020
CEJV-WTRAN-048216 Maspero Station - Reinforcement - Ticket Slab at Level (+12.870) - Access Slab At (X06) - Only Excel 3/1/2020
CEJV-WTRAN-048271 Maspero Station - Reinforcement - Walls under Platform - Stage 2 - Box (2b) 3/2/2020
Document No Submission Received Date Review Date Notes
CEJV-WTRAN-048338 Maspero Station - Reinforcement - Ticket Slab at Level (+12.870) - Access Slab 3/2/2020
CEJV-WTRAN-048594 Maspero Station - Reinforcement - Walls under Platform - Stage 2 - Box 2a 3/4/2020
FCR - Maspero Station - Roof Slab - Box 2b - Top Longitudinal Reinforcement Secondary Dir. F-091 3/9/2020
FCR - Maspero Station - Roof Slab - Box 2b - Top Longitudinal Reinforcement Secondary Dir. F-091-RevB 3/15/2020
CEJV-WTRAN-049804 Maspero Station - Civil Work - Formwork - Super Structure - Air Intake (02) 3/16/2020
CEJV-WTRAN-050067 Maspero Station - Reinforcement - Spiral Stair & Air Intake RS & Material Opening 3/18/2020
CEJV-WTRAN-050365 Maspero Station - Reinforcement - Air Exhaust 1 & Air Intake 1 3/22/2020
CEJV-WTRAN-050510 Maspero Station - Formwork - Platform Sections - Zone 1 - Part (1-3) 3/23/2020
CEJV-WTRAN-051079 Maspero Station - Stair 1 , Escalator 5,6,7 - Formwork 3/30/2020 Mah done
CEJV-WTRAN-051183 Maspero Station - Reinforcement - Walls under Platform - Stage 2 - Box (1) 4/1/2020 Mah done
CEJV-WTRAN-051206 Maspero Station - Reinforcement – Stairs & Escalators - Box 1 4/1/2020 Mah done
FCR - Maspero Station - Reinforcement - Platform Slab Box 3 Bottom & Top Rft Long. Dir. F-474 4/1/2020 Mah done
CEJV-WTRAN-051306 Maspero Station - Reinforcement - Stair 9, Escalator 17 & Stair 8 & Escalator 14 4/1/2020 Mah
CEJV-WTRAN-051819 aspero Station - Reinforcement Details - Roof Access Slab 4/8/2020 Mah
FCR - Maspero Station - Box 3 - Permanent Strut at Axes (Y12&Y13) and Axes (Y14&Y15) F-092 4/8/2020 Mah
Document No Submission Received Date Review Date Notes
FCR - Maspero Station - Box 3 - Permanent Strut at Axes (Y12&Y13) and Axes (Y14&Y15) F-093 4/8/2020 Mah
CEJV-WTRAN-051871 Maspero Station - Walls Under Platform - Sections Reinforcement - Box 1 4/8/2020 Mah