INSPECTION AND TEST PLAN -PLUMBING WORKS (QCITP)

Inspection Points(HOLD POINTS)


Activity and Characteristic to be Reference Documents (Codes/ Std/ Independe
No. Acceptance Criteria Verifying Document
Checked Spec. / Proc.) nt
Subcon CONTR.  RE / RTO SCC Laborator
y (3rd
Party)
1 MATERIAL INSPECTIONS

Material Inspection
Plumbing General Specifications: Approve Material by
1.1 Verify Materials type/size/quantity Report and Material I/H R S W
Materials 1&3, ASTM-D1785 Plumbing Consultancy
Certification
Material Inspection
Plumbing General Specifications, Approve Material by
1.2 Approval of Fire Stop Sealant Report and Material I/H R S W
ASTM-C24 Plumbing Consultancy
Certification
Approve Fabrication
Fabrication of Braces, Hangers and Plumbing General Specifications, Material Inspection
1.3 Methodoly by Plumbing I/H R S W W
Supports ANSI/MSS SP-58-2018 Report
Consultancy
Material Inspection
Plumbing General Specifications, Approve Material by
1.4 Approval of Valves Report and Material I/H R S W
ASME B31-31.8 & ASSE 1016 Plumbing Consultancy
Certification
Material Inspection
Plumbing General Specifications, Approve Material by
1.5 Approval of Overhead Tank Report and Material I/H R S W
NFPA-22 Plumbing Consultancy
Certification
Material Inspection
Approve Material by
1.6 Approval of Water Meter Plumbing General Specifications Report and Material I/H R S W
Plumbing Consultancy
Certification
Plumbing General Specifications, Material Inspection
Approve Material by
1.7 Approval of Plumbing Fixtures ANSI- A117.1, Z124.2, A112.18, Report and Material I/H R S W
Plumbing Consultancy
Z358.1 Certification

2 INSTALLATION

As per Approve Design


2.1 Pipe Elevation Plumbing General Specifications Dwg. By Plumbing Site Inspection Report I/H R S W
Consultancy
Pipe Braces, Hanger and Support in As per Approve Design
2.2 Plumbing General Specifications Dwg. By Plumbing Site Inspection Report I/H R S W
Accessible Area
Consultancy
Plumbing General Specifications, As per Approve Design
2.3 Pipe Connection Dwg. By Plumbing Site Inspection Report I/H R S W
ASME B31.3
Consultancy
As per Approve Design
2.4 Plumbing Fixture Proper Installation Plumbing General Specifications Dwg. By Plumbing Site Inspection Report I/H R S W
Consultancy
Plumbing Fixture Location and Plumbing General Specification As per Approve Design
2.5 Dwg. By Plumbing Site Inspection Report I/H R S W
Elevation Coordinated with Architectural Plans
Consultancy
Plumbing General Specifications, As per Approve Design
2.6 Pipe Insulation ASHRAE Standard 90.1-2010, Section Dwg. By Plumbing Site Inspection Report I/H R S W
6.4.4.1 HVAC System Pipe Insulation Consultancy
As per Approve Design
Plumbing General Specifications: 3.12 Dwg. By Plumbing
2.7 Pipe Sleeves Consultancy, following 1 Site Inspection Report I/H R S W
ROUGH-IN.
size higher of the pipe

3 Testing
As per Approve
Methodology by Plumbing
Plumbing General Specifications and, Consultancy, Following
3.1 Pressure Test +/- 5psig difference for Inspection Test Report I R S W W
ASME-B31 As per Approve
2hours test by Plumbing
Methodology
Plumbing General Specification, Consultancy, Following
3.2 Gravity/Water Test 5% difference after 24 Inspection Test Report I R S W W
ASTM-F2164
hours
As pertest
Approve
Plumbing General Specification: 5.5 Methodology by Plumbing
3.3 Slope Test Consultancy, Following Inspection Test Report I R S W W
Installtion
1.5% minimum slope
Excavation, Backfilling and Sand
4
Bedding

Plumbing General Specification, As per Approve Design


4.1 Excavation Depth Dwg. By Plumbing Site Inspection Report I R S W
ASTM-F3097
Consultancy
Plumbing General Specification, As per Approve Design
4.2 Backfilling Material Dwg. By Plumbing Site Inspection Report I R S W
ASTM-D4253 / ASTM-D698
Consultancy
Plumbing General Specification, As per Approve Design
4.3 Bedding Material and Thickness Dwg. By Plumbing Site Inspection Report I R S W
ASTM-D4253
Consultancy

LEGEND:        ITL: Independent Testing Laboratory   I: Execution of Inspection and Test      R: Review    S: Surveillance     W : Witness    H : Hold Point

RE/RTO: Resident Engineers/Resident Technical Officer

Prepared by: Noted by: Approved by:


Mr. Jomari Chris Beron Engr. Bernard Unabia Engr. Ariel Cantil
PDPM-QC Mechanical Engineer PDPM-QC Civil Engineer PDPM-PM
INSPECTION TEST PLAN FOR HOUSING P
Reference Documents
No. Activity and Characteristic to be Checked (Codes/ Std/ Spec. /
Proc.)

1 Material Receiving Inspection

- Receiving Inspection of Materials SUT1-Z05-Q 00-4-023/ASTM E1492


1.1

- Confirm material storage condition Site Receiving InspectiinProcedure

SUT1-Z05-Q 00-4-023-
1.2 Receipt inspection of welding consumables

Site Receiving Inspection
Procedure

2 Welding/ Welders Qualifications

SUT1-Z05-Q00-4-005 WPS(AWS
2.1 Confirmed Welding Procedure Specification
D1.1 Prequalified)
SUT1-Z05-Q00-4-005 WPS(AWS
2.1 Confirmed Welding Procedure Specification
D1.1 Prequalified)

SUT1-Z05-Q00-4-030  Welder &
Welding
Operator qualificationProcedure
2.2 Cofirmed Welders(Welders Qualification Test & Contro)

SUT1-Z05-Q00-4-021 General
Welding Procedure

3 Foundation Preparation

Approved Construction 
3.1 Confirmation acceptance of foundation

Drawing - (IFC)
Approved Construction 
3.2 Control foundation level pad elevation & location Drawing - (IFC)

4 Inspection of Fabricated Items

4.1 Confirm Dimension Verification,(Before Erection) SUTO-ALL-C08-4-004

4.2 Visual inspection of workmanship including weld quality SUTO-ALL-C08-4-004

5 Steel Works Erection


5.1 Confirm column plumbness SUTO-ALL-C08-4-004

5.2 Confirm bracings are properly insta SUT0-All-C08-4-004lled SUTO-ALL-C08-4-004

5.3 Confirm handrails, gratings, & stairways are correctly installed SUTO-ALL-C08-4-004

6 Bolting

6.1 Confirm all nuts, bolts & washers have been fitted. SUTO-ALL-C08-4-004

Confirm erection bolts have been replaced with high strength


6.2 SUTO-ALL-C08-4-004
bolts(where applicable)

6.3 Confirm bolt torque SUTO-ALL-C08-4-004

7 Field Welding (As per Drawing- Field Points)

Confirm welding works is carried out in SUT1-Z05-Q00-4-


7.1
 accordance with approved procedures 006 WPS & PQR procedure
SUT1-Z05-Q00-4-006  -WPS & PQR
7.2 Visual Inspection of welding
Pprocedure

SUT1-Z05-Q00-4-006 -WPS & PQR
Non Destructive Testing (NDT) of welding works
7.3 Procedure

   (As per 11.0 NDE) SUT0-All-C08-4-004

8 Grouting

Approved Construction Drawing –


8.1 Confirm grouting is complete
Issued for Construction (IFC)

Approved Construction Drawing –


8.2 Confirm final anchor bolt torque after grouting
Issued for Construction (IFC)

9 Final Inspection

9.1 Carry out Final inspection of the structure Approved Construction Drawings

10 Repair/ Adjustment  & Re-fabrication


Confirmed material Site Receiving Procedure (SUT1-
10.1
Z05-Q 00-4-023)

- Receiving Inspection of Materials

SUT1-Z05-Q00-4-005 WPS(AWS
10.2 Marking & Cutting
D1.1 Prequalified)

SUT1-Z05-Q00-4-005 WPS (AWS


10.3 Fit up Check
D1.1 Prequalified)

10.4 Confirm Final Dimension Check SUTO-ALL-C08-4-004

Welding Visual Inspection SUT1-Z05-Q00-4-005(WPS)


- Full Penetration welds 100% (AWS D1.1 Prequalified)
10.5
- Partial penetration welds 50%
- Fillet welds 25%

11 NDE
RT or  UT - Full penetration Butt Welds  50 % and Magnetic(MT) or Dye
penetrant testing (PT) 50%  (for site welds the above will be 100%)

11.1 UT  or M/ PT - Partial penetration Butt Welds Min.25% & MT/PT  25% (for SUTO-ALL-C08-4-004
site welds the above will be 50%)

MT  or PT - Fillet Welds  Min 20% (for site welds the above will be 50%)

Re-Painting/ Galvanizing  (Touch up - Cold )


11.2 - Surface preparation Approved MS for Painting Works
- Thickness of Zinc Coating/ Painting Cointing Dry film
SUTO-ALL-C08-4-004
11.3 Adhesion Test(If necessary –Random sample Test)
SUTO-ALL-P08-4-008

LEGEND:        ITL: Independent Testing Laboratory   I: Execution of Inspection and Test      R: Review    S: Surveillance

11.0 Attachments

              Attachment 1 –   ITR  -QGI-001           Notification (Request) for Inspection


Attachment 2 –   ITR -QGI-002          Release Note

Attachment 3 –   ITR -QMI-001         Receiving Inspection Report


PLAN FOR HOUSING PROJECTS-CIVIL WORKS (WELDING)
Inspection Points(HOLD PO
Acceptance Criteria Verifying Document

Subcon CONTR.

Approved Construction Drawing – Issued for Construction (IFC) & Mill


Certificates & Factory Production Control Certificates (FPC), No
physical defects, Safeguards against adverse environment ITR-QMI-001-Receiving
I W/R
Inspection Report

Low hydrogen/min. Tensile strength 480N/mm². As per manufacturers ITR-QMI-001- Receiving


I R
recommendations. Storage-Temp. & Humidity control environment Inspection Report

ITR-QCI-011 Structural Steel


Approved WPS & PQR
Checklist(para. 2 & 4)

I R
ITR-QCI-016- Steel Structure I R
Fabrication

Approved Construction Drawing – Issued for Construction (IFC)

ITR-QCI-0011 Structural Steel


Checklist- para. 2 & 4)

Conforming the AWS D1.1, Approved WPS & PQR I W/R

Welder or Welding Operator


Performance Qualification
Record

Signed “Release Form” from Concrete casting subcontractor/contractor QGI-002  Release Note I R

ITR-QCI-020- Foundation Pad


Elevation tolerance EL. ± 2mm., As per specification I W/R
Inspection Report

Approved Construction Drawing – Issued for Construction (IFC)AWS ITR-QCI-0011- Structural Steel
I W
D1.1/ D1.1M Checklist- para. 2 & 4)

Approved Construction Drawing – Issued for Construction (IFC)AWS ITR-QCI-0011 Structural Steel
I W
D1.1/ D1.1M Checklist- para. 2 & 4)
ITR-QCI-0018 Installation
Approved Construction Drawing – Issued for Construction (IFC) I W/R
Record For Structural Steel

ITR-QCI-011 Structural
Approved Construction Drawing – Issued for Construction (IFC) I S
Steel Checklist(para. 5)

ITR-QCI-011 Structural
Approved Construction Drawing – Issued for Construction (IFC) I S
Steel Checklist(para. 5)

ITR-QCI-011 Structural
Approved Construction Drawing – Issued for Construction (IFC) I S/W
Steel Checklist(para. 3)

ITR-QCI-011 Structural
Approved Construction Drawing – Issued for Construction (IFC) I S/R
Steel Checklist(para. 3)

ITR-QCI-0017  Bolt Torque


Approved Construction Drawing – Issued for Construction (IFC) Inspection record for I W/R
Structural Steel

Conforming the AWS D1.1 ITR-QCI-0019 Welding


I S/R
Approved WPS & PQR Inspection Record
Conforming the AWS D1.1 ITR-QCI-0011 Structural Steel
I W/R
Checklist(para 4)

Approved WPS & PQR

ITR-QCI-0019 Welding
Approved Construction Drawing – Issued for Construction (IFC) I W/R
Inspection Record

Grout Inspection & Test


Grouting must be done after column verticality is plumbed I W
reports

ITR-QCI-025- Final inspection


Approved Construction Drawing – Issued for Construction (IFC) I W
for Structure Steel

ITR-QCI-025- Final inspection
Approved Construction Drawing – Issued for Construction (IFC) I W
for Structure Steel
Approved Construction Drawing – Issued for Construction (IFC) & Mill
ITR-QMI-001- Receiving
Certificates & Factory Production Control Certificates (FPC), No I W/R
Inspection Report
physical defects, Safeguards against adverse environment

Approved Construction Drawing – Issued for Construction (IFC), ITR-QCI-016- Steel Structure
I W
Approved tolerance – ASCI specification for Structural Steel Buildings Fabrication

ITR-QCI-016- Steel Structure


Approved joint detail As per WPS. I W
Fabrication

ITR-QCI-016- Steel Structure


Approved Construction Drawing – Issued for Construction (IFC) I W
Fabrication

AWS D1.1 Tabl;e 6.1 & 6.2


All lifting lugs 100% MPI Test ITR-QCI-016- Steel Structure
I W/R
- Verify NDT % has been completed Fabrication
AWS D1.1 Tabl;e 6.1 & 6.2 NDE Report I W/R

Approved Materials Specification ,  Material Brochure  & Catalogue ITR-QCI-023 Painting


I S/R
Specification Inspection Report

As per ASTM D-3359/ISO 2409 (Type Type) or ITR-QCI-023 Painting


I W/R
As per ASTM D-4541/ISO 2624 ( Dolly pull-off)) Inspection Report

nd Test      R: Review    S: Surveillance     W: Witness    H : Hold

ification (Request) for Inspection
     Release Note

iving Inspection Report


pection Points(HOLD POINTS)

RE/RTO SCC Lab

W/R S

S S

R R
R R

W R

R R

W/R R

R S

S S
W/R S

S S

S S

S S

S/R S

W/R R

S/R S
W/R S

W/R S/R

S S

R S

R W
W/R S

S S

S S

S S

W/R S
W/R S

S/R S/R

W/R S