NO DESCRIPTION UNIT
QUERY LIST
PROJECT CADANGAN MEMBINA DAN MENYIAPKAN PAGE: 1
TITLE: PUSAT LATIHAN KEMAS ATAS LOT 19, JALAN
DATUK MOHAMMAD MUSA, KOTA
SAMARAHAN, SARAWAK.
DRWG. NO: PUB/BQS562/FINISHES/P1 DATE: 6/10/2020
BILIK KULIAH 1
18mm thick cement plaster and emulsion paint (M2)
BILIK KULIAH 2
18mm thick cement plaster and emulsion paint
!9mm thick cement screed to received homogenous tiles (M2)
BILIK MASAKAN
18 mm thick cement plaster and emulsion paint (M2)
18mm thick cement screed to received ceramic tiles (M2)
PUSAT SUMBER
18mm thick cement plaster and emulsion paint to wall (M2)
18mm thick cement plaster and emulsion paint to wall (M2)
300 x 300m x 7mm thick non slip ceramic tiles to floor (M2)
TANDAS PEREMPUAN
18mm thick cement plaster and emulsion paint to wall (M2)
300 x 300m x 7mm thick non slip ceramic tiles to floor (M2)
SKIRTING
PROGRAM UKUR BAHAN
FAKULTI SENIBINA, PERANCANGAN DAN UKUR
UNIVERSITI TEKNOLOGI MARA
AMOUNT
ITEM DESCRIPTION UNIT QUANTITY RATE
RM
ELEMENT : INTERNAL FINISHES
AMOUNT
ITEM DESCRIPTION UNIT QUANTITY RATE
RM
ELEMENT : INTERNAL FINISHES
TO COLLECTION