Plan de Surveillance Pièce Plastique
Plan de Surveillance Pièce Plastique
Plan de Surveillance Pièce Plastique
MOLDING PROCESS
Prototype Prelaunch Production Key Contact/Phone Date(Orig) Date (Rev.)
Control Plan Number PS3042019 30/01/2019
Part Number/Latest Change Level Core Team Customer Eng. Approval/Date
Characteristics
Process
Number
Machine, Device,
Name/ Special Evaluation/
Jig, Tools, for Product/Process Specification/
Operation No. Product Process Char. Measurement Size Freq. Control Method Reaction Plan
Mfg. Tolerance
Description Class Technique
Sample
Laboratory analysis from the per delivery
4 purity raw material Material specification
acc. Specification received until AQP
bacth
Sample
Raw Material : Laboratory analysis from the per delivery
Incomming 5 melting temperature Material specification Goods lock , return
>PBT-GF30< acc. Specification received until AQP
10 - 1 goods good to suppliers and
TAROLOX 10 bacth
reception 8D Report
G6
Sample
Laboratory analysis from the per delivery
6 Charge rate Material specification
acc. Specification received until AQP
bacth I LOG 002 Instruction de
Contrôle Réception
& Inspection report FQLT014.C
Sample
Compliance Material specification < 80 mm / Laboratory analysis from the per delivery
7 Flammability ⎊R
with regulation min acc. Specification received until AQP
bacth
Sample
Forbidden material Compliance Laboratory analysis from the per delivery
8 ⎊R Material specification
and recyclability with regulation acc. Specification received until AQP
bacth
inventory
Visual control and
Material Proper packaging ,batch Lot number + ERP System management /
10 - 2 Storage 1 Batch and location reception 100% Each packing
warehouse identification and location Correct storage datas
documentation
if necessary
No production start
According to
Drying raw Time: 2 - 4 h and T° 80-120°C of At startup of Parameter sheet IPRO 002 Detremine rout cause
20 - 1 Dryer 1 Drying control parameter data 100%
material drying production & Startup check list I PR0 001 / Action plan and
sheet
correction
Before and
Part number for ERP System after
1 Right version & datum for production 100%
production Planning of production
production order No production start
ERP System Daily planning (Or production under
20 - 2 Tool setup Tool Nr : 18045
Before I MOT 001.B / I MOT 002.B deviation ) / action
Tool situation and plan and correction
2 Status Tool preparation 100% production
ability for production
order
No production start
According to
Time: 2 - 4 h and T° 80-120°C of At startup of Parameter sheet IPRO 002 Detremine rout cause
Dryer 1 Drying control parameter data 100%
drying production & Startup check list I PR0 001 / Action plan and
sheet
correction
Production
20 - 4
start
According to No production run /
Injection Surveillance Parameter sheet IPRO 002
3 Monitoring of the injection parameter parameter data 100% 100% parameter correction
machine / Tool parameter & Startup check list I PR0 001
sheet & Validation
Nr 18045
Stop production
Part/ Process Characteristics Methods
Number Process
Machine, Device,
Name/ Special Evaluation/
Jig, Tools, for Product/Process Specification/
Operation No. Product Process Char. Measurement Size Freq. I QLT 002.A - Gamme
Control Methodde Reaction Plan
Mfg. Tolerance
Description Class Technique Contrôle Production / I QLT 001.A -
Parts without burrs nor lack of Gamme de Contrôle Opérateur /
2 Appearance Visual control 1 shot At startup
material nor burns in the critical area Recording documentation : FQLT
Packaging state and
1 delivery note VISUAL 100% per delivery 018 -FQLT 006
Identification panoplie de defaults F QLT O48