Current Transformer Test: Power Supply To Plot P18 at Zayed Military City D108337 SWH38A1

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

Project: Power supply to Plot P18 at Zayed

Military City
Project no.: D108337 Substation: SWH38A1
Location: Plot P18, Zayed Military City

Client ADDC Site Ref. 33/11kV PU - 1 / 11kV Switchgear


Contractor Time Electro Feeder No. K01 Incomer feeder
Testing Company Alphapower Date of Test 02.05.2020
SITE ACCEPTANCE TEST REPORT FOR CURRENT TRANSFORMER

CURRENT TRANSFORMER TEST


1. NAME PLATE DATA:

Description Core-1 Core-2 Core-3

CORE 1S1-1S2 2S1-2S2 3S1-3S2

Make ABB

Purpose METERING OCEF PROTECTION TRF. DIFF. & REF PROTECTION

Type / Model TPU 43.23

Ratio 1250/1 A

Class 0.5 FS5 5P20 PX

Burden (VA) 15 15 N/A

RCT (Ω) N/A N/A ≤ 5.0 Ω

Standard IEC 61869 – 2


Sl.No. R 1VLT5120013168 Y 1VLT5120013169 B 1VLT5120013168

2. VISUAL TESTS:

DESCRIPTION R Phase Y Phase B Phase

VISUAL INSPECTION OK OK OK

NAME PLATE OK OK OK

TIGHTNESS CHECK AT CT SEC. TB – LV Compartment OK OK OK

3. INSULATION RESISTANCE TESTS :

TESTED BY CONTRACTOR WITNESSED /APPROVED BY


COMPANY ALPHAPOWER Time Electro ADDC
NAME JAYAPRAKASH M P

SIGNATURE

DATE 02.05.2020

SAT Report for Current Transformer Page 1 of 3


Project: Power supply to Plot P18 at Zayed
Military City
Project no.: D108337 Substation: SWH38A1
Location: Plot P18, Zayed Military City

Client ADDC Site Ref. 33/11kV PU - 1 / 11kV Switchgear


Contractor Time Electro Feeder No. K01 Incomer feeder
Testing Company Alphapower Date of Test 02.05.2020
SITE ACCEPTANCE TEST REPORT FOR CURRENT TRANSFORMER

Duration: - 60Sec Applied Voltage: 500 Vdc Ambient temperature: 30°C


Test Points L1 L2 L3
(1S1-1S2) – Earth 10.94 GΩ 15.29 GΩ 14.10 GΩ
Core – Earth (2S1-2S2) – Earth 13.50 GΩ 16.32 GΩ 14.03 GΩ
(3S1-3S2) – Earth 12.54 GΩ 12.94 GΩ 10.76 GΩ
(1S1-1S2) – (2S1-2S2) 8.23 GΩ 15.52 GΩ 10.68 GΩ
Core – Core (1S1-1S2) – (3S1-3S2) 11.24 GΩ 12.97 GΩ 13.76 GΩ
(2S1- 2S2) – (3S1-3S2) 12.89 GΩ 13.14 GΩ 12.54 GΩ

4. POLARITY:
Core R – Phase Y – Phase B-Phase
1 OK OK OK
2 OK OK OK
3 OK OK OK

5. WINDING RESISTANCE TEST:

Core (1S1 – 1S2)


Phases Winding Resistance Winding Resistance
at Ambient Temperature (Ω) at 75ºC (Ω)
L1
L2 CT ANALYZER TEST REPORT ATTACHED
L3
Core (2S1 – 2S2)
Phases Winding Resistance Winding Resistance
at Ambient Temperature (Ω) at 75ºC (Ω)
L1
L2 CT ANALYZER TEST REPORT ATTACHED
L3

6. CT SATURATION TEST:

TESTED BY CONTRACTOR WITNESSED /APPROVED BY


COMPANY ALPHAPOWER Time Electro ADDC
NAME JAYAPRAKASH M P

SIGNATURE

DATE 02.05.2020

SAT Report for Current Transformer Page 2 of 3


Project: Power supply to Plot P18 at Zayed
Military City
Project no.: D108337 Substation: SWH38A1
Location: Plot P18, Zayed Military City

Client ADDC Site Ref. 33/11kV PU - 1 / 11kV Switchgear


Contractor Time Electro Feeder No. K01 Incomer feeder
Testing Company Alphapower Date of Test 02.05.2020
SITE ACCEPTANCE TEST REPORT FOR CURRENT TRANSFORMER

 (CT ANALYZER TEST REPORTS ARE ATTACHED ALONG WITH THIS REPORT)

7. RATIO TEST:

 (CT ANALYZER TEST REPORTS ARE ATTACHED ALONG WITH THIS REPORT)

8. TEST EQUIPMENTS USED:


Description Make Model Serial No. Calibration Due Date
Insulation Tester Megger MIT515 101574096 18.03.2021
CT Analyzer Omicron CT Analyzer KM 285H 11.12.2020

TESTED BY CONTRACTOR WITNESSED /APPROVED BY


COMPANY ALPHAPOWER Time Electro ADDC
NAME JAYAPRAKASH M P

SIGNATURE

DATE 02.05.2020