Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

FOR BID: Refining & NGL Projects Department North RT Refinery & Ju'Aymah NGL Projects Division

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Saudi Aramco 2616-ENG (10/2002)

SAUDI ARABIAN OIL COMPANY


ENGG CERT PMT OPRNS

TBD

TBD
TBD

TBD

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
IAD

IAD
AAN

AAN
ISSUED FOR 60% REVIEW

ISSUED FOR 90% REVIEW

REFINING & NGL PROJECTS DEPARTMENT


DESCRIPTION

NORTH RT REFINERY & JU’AYMAH NGL PROJECTS DIVISION

I D
B
10-01868

10-01868

BI-10-01868
JO/EWO

R
12/31/19

03/15/20
DATE

UPGRADE ETHANE FACILITY – JU’AYMAH NGL

O
REV.
NO.

FRACTIONATION PLANT
A

F
DISCIPLINE
ENGINEER
AAN
DATE 03/15/20

D
PROJECT
ENGINEER
YKH

E
DATE 03/15/20
CERTIFIED
IAD LSPB MECHANICAL EQUIPMENT DEMOLITION LIST

U
DATE 03/15/20
CONSTRUCTION IN-PLANT (JNGLF) PACKAGE

S
AGENCY
TBD

S
DATE 03/15/20
OPERATIONS

I
TBD
DATE 03/15/20
CONTROL NUMBER

Prepared by:
VERIFICATION
EDSD

DATE:
BY:
REVISION CERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS
B
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

MARCH 2020
10-01868-0001-001
THIS INDICATES THAT REV. NO.

JO / EWO
LSPB MECHANICAL EQUIPMENT DEMOLITION LIST (IN-PLANT JNGLF PKG) DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT NO. REV NO.

UPGRADE ETHANE FACILITY – JU’AYMAH NGL FRACTIONATION PLANT DOC 1


R83 A RD-MEC007
(DCC) NO.

JO NO.

EWO NO.
FRACTIONATOR CENTER OFFSITE OF B
JU’AYMAH SAUDI ARABIA BI / EWO 10-01868-0001 2
EDSD/2616-1002.XLS
LSPB MECHANICAL EQUIPMENT DEMOLITION LIST -JNGLF
UPGRADE ETHANE FACILITY – JU’AYMAH NGL FRACTIONATION PLANT
PROJECT NO. BI-10-01868
DOC No. RD-MEC007 REV. B REV. DESCRIPTION Issued for 90% Review LOCATION JU’AYMAH

CAPACITY DESIGN DESIGN OPER. OPER. WEIGHT WEIGHT


EQUIPMENT POWER MATERIAL MATERIAL DIA/WIDTH LENGTH HEIGHT Foundation
TAG P&ID No. DATASHEET NO. DESCRIPTION QTY PARENT EQUIPMENT (RATED)/ PRESSURE TEMP. PRESSURE TEMP. EMPTY OPER. REMARKS
TYPE (HP) (Internals) (External) FT. (mm) FT. (mm) FT. (mm) Required

D
TOTAL DIFF.HEAD (PSIG) (°F) (PSIG) (°F) LB. (Kg) LB. (Kg)

11' 34900 48650 To be demolished once new system

I
R83-D-224 Vessel NA-D80486.021 -- C2 Reproduction Slug Catcher 1 -- N/A -- 2860 225 2285 150 CS CS 4' (1219.2) -- Yes
(3352.8) (15830) (22067) become operational.
15' 7880 29830 To be demolished once new system
R83-D-391 Vessel NA-D80752.003 -- Separated Liquids Flash Drum 1 -- N/A -- 75 225 12 180 CS CS 5' (1524) -- Yes
(4572) (3574) (13530) become operational.

B
Legend
N/A : Not Applicable
VTA: Vendor to Advise
VTC: Vendor to Confirm

R
TBD: To Be Defined

F O
E D
S U
I S
2 of 2

You might also like