Electrified Double Track Project Between Rawang and Ipoh (Balance of Works) Construction

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

ELECTRIFIED DOUBLE TRACK PROJECT

UEM CONSTRUCTION
BETWEEN

RAWANG AND IPOH (BALANCE OF WORKS)

REF NO:

Test Conducted For : TRACKWORK Welding machine model & no:

INSPECTION OF THERMIT WELDING Panel number: Length:

1. Location / Section : 4. Date Inspection :

2. Offset : 5. Line : Up / Down :

3. CH From : To 6.Depot / Site :

Rail Temp Before


Joint No Date Of Welding Time Of welding LHS / RHS Rail Inspection By Visual Name Of Welder Remarks
Heating

Supervising Consultant

Name : Signature : Date :

Contractor:

Name : Signature : Date :

UEMC-F-TW003 Rev 0 Date: 01-06-05