1 Intro
2 Code of Ethics
3 PM Framework p. 29 18-Jun
4 PM Process 1
5 Role of the PM
6 Integration 5
7 Scope 8
8 Schedule 13
9 Cost 18
10 Quality 22
11 Resource 27
12 Comms 31
13 Risk 34
14 Procurement 40
15 Stakeholder 44
16 PM Skills
Case
Studies
For tomorrow/next week
PMP master quiz p. 1 2/3 PM Framework and Process
6, 8 17 qs, don't worry about score or timing.
1 we'll discuss at the thop of our class.

5 Project 2
4 Our project is due:
7 Our last day 30-Jun
What do I do now the sessions are complete?
2 Project 1 Scheduling the exam and when to schedule
Exam day strategies

Section LoE (hours)


Intro 0 Remaining LoE Remaining Time TCPI
Code of Ethics 0 25 27 0.93 Benefits / Cost
PM Framework 0
PM Process 0 We have 0.93 hr(s) material remaining
Role of the PM 1.5 for every hr remaining
Integration 3
Scope 2.5
Schedule 3.5
Cost 3.5 TCPI > 1?
Quality 2 We need to speed up.
Resource 1.5
Comms 0.75
Risk 3
Procurement 3
Stakeholder 0.75
PM Skills 0.25
Total 25