CQI-9Special Process: Heat Treat System Assessment
CQI-9Special Process: Heat Treat System Assessment
CQI-9Special Process: Heat Treat System Assessment
Process Table E
Annealing Yes
Normalizing Yes
Stress-Relieving Yes
Process Table F
Low Pressure Carburizing No
Process Table G
Sinter Hardening No
Process Table H
Ion Nitriding No
Auditors/Assessors:
Name: Company: Phone: Email:
Brad Bukowski American Systems Registrar 616-240-5542 brad@asrworldwide.com
Assessment
1
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
2
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
3
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
4
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
5
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
6
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
Has the Heat Treater Section 1 - Management Responsibility & Quality Planning
The heat treater shall develop and maintain a
developed a critical spare part
critical spare parts list and shall ensure the
1.19 list and are the parts available Critical Parts in Inventory MI-003. x
availability of such parts to minimize production
to minimize production
disruptions.
disruptions?
7
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
Section 1 -2Management
Section Responsibility
- Floor and Material & Responsibility
Handling Quality Planning
It is critical that all customer requirements and lot
identification be adequately transferred to internal
heat treat documents. The facility shall ensure that
the data entered in the receiving system match the All incoming product is reviewed for
information on the customer's shipping documents. accuracy at receiving. All information
Documented processes and evidence of provided is verified with our process and
Does the facility ensure that compliance shall exist, e.g., shop travelers, work recorded on the customers' document.
the data entered in the orders, etc. Sometimes the material received does Any discrepancies are
2.1 receiving system matches the not precisely correspond to customer shipping documented and product is placed on hold x
information on the customer's documents. The facility shall have a detailed pending a review by Management.
shipping documents? process in place to resolve receiving
discrepancies. See WI-7-001-C and WI-7-001-D. See
The requirements stated above also apply to SHP-003 (WO) and SHP-013 (Receipt of
captive heat treat departments. This process CSP).
refers to receiving and shipping the parts in and
out of the heat treat department.
8
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
9
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
Parts are often dipped in or sprayed with rust The rust prevention is controlled by new
preventive solutions immediately after the heat additions of product and by supplier once
treating process. Soluble oil solutions or other rust every 6 months.
Is soluble oil or other rust
preventive solutions shall be monitored and
2.13 preventive monitored and x
controlled, if applicable. The heat treater shall Product is pre-titrated by the supplier prior
controlled if applicable?
have and maintain documented tolerances for the to being added into our tank.
solutions. Refer to Process Tables, Section 5.0,
for frequency of checks. Maintenance puts out a work order for this.
10
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
11
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
12
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
monitored,Section
automatically1 controlled,
- Management and Responsibility & Quality Planning
documented. Recorded carbon potential shall be
controlled within +/- 0.05 of the set point. Recorded
dew point shall be controlled within acceptable
limits specified in the control plan or internal
procedures.
13
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
Section
Ammonia pick-up 1 -undesirable
can be Management Responsibility
in parts and & Quality Planning
heat treat processes not specifying/requiring
ammonia as an addition.
14
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
15
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
16
CQI-9Special Processes: Heat Treat Systems AssessmentVersion 3, Issued 10/11
1
CQI-9Special Processes: Heat Treat Systems AssessmentVersion 3, Issued 10/11
2
CQI-9Special Processes: Heat Treat Systems AssessmentVersion 3, Issued 10/11
3
CQI-9Special Processes: Heat Treat Systems AssessmentVersion 3, Issued 10/11
4
CQI-9Special Processes: Heat Treat Systems AssessmentVersion 3, Issued 10/11
1
CQI-9Special Processes: Heat Treat Systems AssessmentVersion 3, Issued 10/11
2
CQI-9Special Processes: Heat Treat Systems AssessmentVersion 3, Issued 10/11
3
CQI-9Special Processes: Heat Treat Systems AssessmentVersion 3, Issued 10/11