Annexure - 1 User Manual For IMS
Annexure - 1 User Manual For IMS
Annexure - 1 User Manual For IMS
To Raise inspection
call click on ''CALL
Enter User ID &
Password allotted to
To raise fresh call,
click to "Add New
LIST of Inspection
Calls raised by
Enter all the details of
the inspection call.
NOTE : Proposed date of inspection can not be earlier than the inspection call date.
Only one status of drg. to be
indicated in case of multiple
drawings.
Incase of LOT / SET quantities,
change the inspection unit from
NA to the required one i.e. No. /
meters etc.
2
FORM NO. 11.20 (DQM) F-09 REV-0
1 QAP shall be submitted for each of the equipment separately with break Code Description Code Description Code Description DOCUMENTS :
up of assembly / sub-assembly & part/component or for group of equip-
ment having same specification. 1. Visual(Welding etc.) 19. Sponge test 34. Internal Inspection report D1. Approved GA drawings
2. Dimensional 20. Dust/Water Ingress test by Contractor D2. Information and other refer-
2 Use numerical codes as indicated for extent of inspection & tests and 3. Fitment & Alignment 21. Friction Factor Test 35. Hardness test ence drg / stamped drgs
submission of test certificates & documents. Additional codes & des- 4. Physical Test(Sample) 22. Adhesion Test 36. Spark test for Lining released for mfg.
cription for extent of inspection & tests may be added as applicable for 5. Chemical Test (Sample) 23. Performance Test/ 37. Calibration D3. Relevant catalogues
the plant and equipment. 6. Ultrasonic Test Characteristic curve 38. Safety device test D4. Bill of Matl./ item no./
7. Magnetic Particle Test(MPT) 24. No. Load/Free running Test 39. Ease of Maintenance identification.
3 Separate identification number with quantity for equipment shall be 8. Radiography test 25. Load/Overload Test 40 pouring witness D5 Matchmark details
indicated wherever equipment having same specification belonging to 9. Dye Penetration Test 26. Measurement of speeds 41 physical &chemical test D6 Line/Layout diagram
different facilities are grouped together. 10. Metallographic Exam. 27. Accoustical test 42 load/Deflection test of sor D7 Approved erection procedures
11. Welder's Qualification & 28. Geometrical Accuracy 43 DFT OF PRIMER D8 Unpriced sub P.O.with
4 Weight in tonnes (T) must be indicated under column 5 for each item. Weld Procedure Test 29. Repeatability and Positioning specification and amend-
Estimated weights may be indicated wherever actual weights are not 12. Approval of Test and Repair Accuracy ments, if any
available. Procedure 30. Proving Test measuring Certificate
D9. Calibration instrument of
andall
gauges.
13. Heat Treatment 31. Surface Preparation
32. Manufacturer's
Test Certificate for
ABBREVIATIONS USED : 14. Pressure Test raw material D10.Technical Specification
15. Leakage test
CONTR : CONTRACTOR 16. Balancing 33. IBR/Other statutory agencies
17. Vibration Test compliance certificate
MFG : MANUFACTURER 18. Amplitude test
submitted to
No. heading,place of use and No. No / M T Name and Address dule of Final BSL/MECON for review ASME/Norms and SAMPLING PLAN
brief specification) Inspn MFR CONTR MECON MFR CONTR MECON Documents
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 QAP shall be submitted for each of the equipment separately with break Code Description Code Description DOCUMENTS :
up of assembly / sub-assembly & part/component or for group of equip-
ment having same specification. 1. Visual 14. Impalse Test. D1. Approved GA drawings
2. Dimensional 15. Partial Discharge Test. D2. Approved single line /
2 Use numerical codes as indicated for extent of inspection & tests and 3. Fitment & Alignment 16. Heat run test/Temp. rise test. schematic diagram.
submission of test certificates & documents. Additional codes & des- 4. Physical Test(Sample) 17. Enclosure protection Test. D3. Catalogues / Approved data
cription for extent of inspection & tests may be added as applicable for 5. Chemical Test (Sample) 18. Calibration. sheet.
the plant and equipment. 6. Ultrasonic Test 19. Noise & Vibration. D4. Approved bill of materials.
7. Magnetic Particle Test(MPT) 20. Test Certificates for bought D5. Unpriced P.O.copy.
3 Separate identification number with quantity for equipment shall be 8. Radiography test out components. D6. Calibration Certificate of all
indicated wherever equipment having same specification belonging to 9. Dye Penetration Test 21. Tank pressure test. measuring instruments and
different facilities are grouped together. 10. Measurement of IR Value : 22. Paint shade verification. gauges.
a) Before HV Test 23. Short time rating.
4 Weight in tonnes (T) must be indicated under column 5 for each item. b) After HV Test 24. Operation & functional
Estimated weights may be indicated wherever actual weights are not 11. High voltage test/Dielectric check.
available. test. 25. Overspeed Test.
12. Routine test as per relevant 26. Flame proof test
ABBREVIATIONS USED : IS/other standard. 27. Clearance and creepage
13. Type tests as per relevant IS/ distance.
CONTR : CONTRACTOR other standard. 28. Acceptance Test
29. Response time
MFR : MANUFACTURER 30. Charactristic
PROJECT No.
For MECON QAP NO. REV.
for MECON ( Stamp & Signature ) (Stamp & Signature ) SHEET : OF
CONTINUATION SHEET FORM NO.11.20(DQM) F-10 REV-0
E Q U I P M E N T D E T A I L S INSPECTION AND TESTS
Raw Material and Inprocess Test Certificates & Acceptance Criteria
Sl. Description (with equipment Identification Quantity Manufacturer's Expected Sche- stage Inspection Final Inspection / Test by documents to be Standards/IS/BS/ REMARKS/
No. heading,place of use and No. No / M T Name and Address dule of Final submitted to MECON ASME/Norms and SAMPLING PLAN
brief specification) Inspn MFR CONTR MECON MFR CONTR MECON Documents
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
PROJECT NO.
For MECON QAP NO. REV.
for MECON ( Stamp & Signature ) (Stamp & Signature ) SHEET : OF
FORM NO.11.20(DQM) F-11 REV-0
CONTRACTOR QUALITY ASSURANCE PLAN PROJECT
1 QAP shall be submitted for each of the equipment separately with break Code Description Code Description Code Description DOCUMENTS :
up of assembly / sub-assembly & part/component or for group of equip-
ment having same specification. 1. Visual 18. Drying & firing shrinkage 38. Special test D1. Laboratory test report
2. Dimensions and geometry 19. Sieve analysis 39. Fibre dia D2. Dimensional drgs. showing
2 Use numerical codes as indicated for extent of inspection & tests and 3. Chemical composition 20. Warpage plan, elevation, side view
submission of test certificates & documents. Additional codes & des- 4. Apparent porosity 21. Drip slag test & cross sectional view duly
cription for extent of inspection & tests may be added as applicable for 5. True specific gravity 22. Permeability test approved.
the plant and equipment. 6. Bulk density/true density 23. Hydration resistance test D3. Copies of sub P.O. &
7. Cold crushing strength 24. Lap joint strength Technical Specification.
3 Separate identification number with quantity for equipment shall be 8. Pyrometric cone equivalent 25. Abrasion resistance D4. Calibration Certificate of all
indicated wherever equipment having same specification belonging to 9. Refractoriness under load 26. Cold bonding strength measuring instruments and
different facilities are grouped together. 10. Spalling resistance 27. Oxidation resistance gauges.
D5. Approved / Reference
11. Permanent linear change 28. Workability index
Drawing / Datasheet
4 Weight in tonnes (T) must be indicated under column 5 for each item. after heating 29. Surface area
Estimated weights may be indicated wherever actual weights are not 12. Modulus of Rupture/ 30. Corrosion resistance
available. Flexural strength 31. Consistency
13. Reversible thermal expansion 32. Internal Inspection Report
ABBREVIATIONS USED : 14. Resistance to dis-integration effect 33.Safe working temp. workability
of carbon monoxide gas. 34. Lot sampling
CONTR : CONTRACTOR 15. Water absorption 35. Part assembly
16. Acid resistance 36.Control assembly.
MFR : MANUFACTURER 17. Thermal conductivity 37. Creep Test
Project No.
for contractor MECON QAP NO. REV.
for MECON ( Stamp & Signature ) (Stamp & Signature ) SHEET : OF
CONTINUATION SHEET FORM NO.11.20(DQM) F-11 REV-0
Project No.
for BSP/CET MECON QAP NO. REV.
for MECON ( Stamp & Signature ) (Stamp & Signature ) SHEET : OF
NMDC
GENERALTECHNICALSPECIFICATION FOR
MATERIAL HANDLING
SYSTEM
(GS-06)
MECONLIMITED
RANCHI–834002
01.01 Scope
i) Motors
ii) Gear boxes
iii) Couplings
iv) Pulleys with bearing blocks – head, tail, snub, bend and take-up
v) Conveyor belting
vi) Idlers – carrying, return, impact, self-aligning and transition
vii) Idler frames
viii) Belt cleaning devices
ix) Hold back devices
x) Brakes
xi) Pull-cord switches with cord
xii) Belt sway switches
xiii) Rotary level / position limit switches
xiv) Optical Sensors for detecting longitudinal rupture
xv) Pulse encoder, wherever required
xvi) Zero-speed switches
xvii) Chute jamming devices
xviii) Level indicators, wherever required
xix) Take up pulley frame with take up guides, weight etc.
xx) Bend pulley frame
xxi) Head pulley frame
xxii) Tail pulley frame
xxiii) Drive base frame
xxiv) Chutes with liners
xxv) Guards – tail pulley, bend pulley, coupling
xxvi) Discharge hood at the discharge pulley
xxvii) Screw take – up, wherever required
xxviii) Skirt Boards with liners
xxix) Belt Weigh Scale – wherever required
2. The scope of the Tenderer shall be deemed to include all such items
which although are not specifically mentioned in the specification, but
are needed to make the equipment complete in all respect for its safe,
reliable, efficient and trouble free operation.
3. The scope of supply and services of the Tenderer shall include the
following:
a) Mechanical
b) Electrical
a) Technical Specification
b) General Technical Specification (GTS)
c) Indian Standard (IS) and IPSS
d) Indian Electricity Rules & statutory requirements of
Central Govt. and State Govt.
Equipment complying with other recognised Standards such as IEC,
BS, VDE, and IEEE will also be considered if it ensures performance
equivalent to or superior to Indian Standards.
The components and materials used and the equipment supplied shall
conform to high standards of design, engineering and workmanship
and shall be suitable for efficient operation and reliable service in steel
plant conditions.
Design Basis
Limestone - 40 mm 1.5t/m3
Belting
a) Top-cover thickness – 10 mm (min)
b) Bottom-cover thickness – 4 mm
c) Actual Running tension < 80% of allowable belt
tension
d) Starting tension <120% of allowable belt tension
e) Counterweight shall be chosen based on minimum
80% of full load starting.
f) Actual running tension shall be calculated based
on counterweight provided.
Two Roll V type 10˚ for 1400 & above wide belts or belt
length more than 400m. Single Roll Flat return idler below
1400 wide belt.
Diameter & bearing dia as per carrying Idler
Idlers (Impact)
Brakes
Take up
Screw take-up (with protected thread) up to 40 m conveyor
length. Automatic take up travels as per I.S. for conveyor
length more than 40m. Horizontal take up trolley shall be
provided provided in tail pulley or in intermediate portion
shall be provided where vertical gravity is not possible.
Counterweights shall be cast iron metallic type.
External scrapers
Internal scraper
Belt slip and snap switch - away from the drive (1 No.)
1. General
The Supplier shall make his own calculation in respect of belt speed,
motor kilowatt, belt tension etc. of belt conveyors to ensure satisfactory
performance of the conveyor components and system as a whole. The
starting torque of drive motor and the high speed coupling shall be so
chosen as to allow soft start condition.
Adequate no. of locating pins and match marking shall be provided for
easy assembly and dismantling.
All equipment shall be designed such that all components are easily
accessible for inspection, repair and maintenance.
Clear walkway width for all single galleries shall be 750 mm on one
side and 1200 mm on other side, unless otherwise specified excluding
cable/pipe trays.
Emergency escapes along with cross over for over head galleries shall
be provided with cross over where length of conveyor galleries is more
than 150m. Staircase shall be provided from ground to gallery floor
wherever emergency escapes are provided.
Height of tunnels shall have min. 2200mm clear height excluding cable
trays, service lines, dusts.
2. Conveyor Belting
Belting shall be designed for heavy duty condition and shall be suitable
for 24 effective working hour’s operations per day and 365 working
days per year. It shall be suitable for installation over conveyor system
having 35o troughing angle and shall be suitable for operation at an
ambient temperature of 50oC. It shall have sufficient resistant against
exposure to open sunlight so that its qualities do not deteriorate while
working in open sun. It also may have to work in rain and in conditions
where relative humidity goes upto 100%.
The fabric for belting shall be of Nylon. The belting shall be pre-
stretched, straight ply, skin coated with open ends. It shall have
sufficient strength to give required tension at 10 safety factor and 80%
tension utilisation. All belts shall be joined by hot vulcanized splicing.
The belt shall have sufficient lateral flexibility so that it suits the
troughing angle requirements even when it is empty. The belt shall
have sufficient longitudinal flexibility so that it can easily flex around
different pulleys of the conveyor system. The belt shall have sufficient
impact resistance to withstand impact at the loading points. The rubber
cover used in the top and bottom cover of the belting shall be of M-24
grade The edge shall be of cut edge construction.
d) Flexibility Test
3. Conveyor Pulleys
otherwise agreed. For all other pulleys, either keyless friction grip
connections or keyed connections may be used.
Shell thickness of the pulley shall be suitable for taking bending loads
on the pulley. This shall not be less than 16mm for drive pulley and 12
mm for tail and other pulleys. Pulleys’ shell below Magnetic separator
shall be of non – magnetic stainless steel SS304 material with min. 16
thk. Shell material shall be Fe410W as per IS: 2062-2006 for other
pulleys..Only one longitudinal weld per pulley shall be provided.
Rolled steel may be used for pulley shafts of diameter up to 140 mm.
Forged steel shall be used for shafts above 140 mm diameter.
4. Idlers
The eccentricity (diametrical run out) of troughing and return idlers shall
not exceed + 0.8 mm. Minimum shell thickness of idler tube shall be as
per design basis indicated earlier. All idlers shall be fitted with either
heavy duty deep groove ball bearings or seize resistant ball bearings.
The bearings shall be held positively on the shafts. Multi-labyrinth seals
shall be used for retention of grease. All bearings shall be greased and
sealed for life against ingress of dust, water and escape of grease. All
bearings shall be rated for minimum 40,000 working hours. Bearing
housing of idler shall be made of pressed steel of CRCA sheet press
fitted and preferably be welded with idler tube.
Self-aligning troughing and return idlers with vertical guide rollers shall
be of above specified construction. All self-aligning idlers shall be
provided with grease lubricated anti-friction bearings at pivot points. All
grease fittings shall be of the button head type or equivalent and shall
be accessible from the walkway side of the conveyor by piping. The
grease tubing shall be made of aluminum. The grease fittings shall
have adequate protection against dust collection.
Idler shaft shall be made of class -4, IS-1875 or EN-8, BS-970 or bright
bar of equivalent grade suitable for the duty requirement. Idler frame
shall be made of rolled/ formed steel with provision for securely bolting
to the stringers of the conveyor frame. All fixing bolts shall have spring
washers.
Clearance, gap etc. for the carrying and return idlers shall conform to
the relevant IS/IPSS Standard to extent possible. The fixing
arrangement of carrying and return idlers shall be such as to permit
adjustment of idler sets for the purpose of belt training. Allowance for
such adjustment shall be provided on both sides of the conveyor and
the play shall not be less than 10 mm on either side.
All conveyor shall be provided with one no self cleaning idlers on return
side near head end. Reversible conveyors shall be provided with self
cleaning idlers on both sides.
The preceding and succeeding set of idlers from belt weigh station
shall be of machined type with out of roundness limited to ± 0.2mm.
All idler rollers shall be painted with 2 coats of red oxide primer and 2
coats of enamel finish paint.
5. Belt Cleaners
b) Internal scraper
`V' shaped internal scraper shall be provided on the upper side of the
return belt near the tail end, fitted with wear resistant 10thk
polyurethane blade PU in segments with elasto-mount to remove
spilled materials on the belt. The blade shall be adjustable after the
wear. Reversible conveyors shall be provided with diagonal scrapper
on both ends.
6. Gear Boxes
7. Couplings
All inclined conveyors shall be provided with suitable roller type hold
back devices (other than brakes) to prevent belt from running back in
case of conveyor stoppage due to power failure or otherwise. Holdback
rating shall be minimum 1.5 times the maximum calculated torque.
9. Take Up
Hood shall be made of 6mm thick mild steel plate for portion above the
pulley frame. The hood shall be in segments bolted to each other for
ease of maintenance. The hood shall cover discharge opening for the
chute as well as pulley. Rubber curtain and guard shall be provided at
the entry of belt in the discharge hood. No direct impact of material on
hood wall shall be allowed. Baffle plates shall not be used.
The length of hood/chute shall be selected such that the first impact of
material occurs minimum 200mm below hood & chute flange joint..
Hinged inspection door shall also be provided in the hood. The door
shall preferably be located within a height of 1200 mm from the floor or
shall be provided with a platform. Adequate openings with rubber
curtain shall be provided in the hood for withdrawal and adjustment of
belt scrapers.
11. Chutes
All transfer points shall be provided with non choking chutes made of
minimum 10 mm thick mild steel plates with liners in all inside faces
and shall be constructed in small segments for easy dismantling.
Hinged type sealed inspection doors and flanged poking holes with bolt
cover shall be provided at suitable height and location. The size of the
door shall allow replacement of liners without any dismantling.
Chute shall be designed such that the spillage from snub pulley and
scrapped material from belt scrappers fall inside the chute. The chute
length at discharge area shall be such that the first impact of the
material trajectory is minimum 200mm below the discharge pulley line.
Minimum valley angle of the chute shall be 60 deg. to the horizontal.
Minimum angle of slope of chute plate shall be 65 deg. The valley
angle and slope angle shall be suitably increased for handling wet or
sticky material.
12. Guards
Safety guards shall be provided for all couplings, brakes, tail pulleys
etc. of the conveyor drive and screwed on the above base frame.
Where the return belt runs more than 1000 mm above floor, fencing
shall be provided to prevent persons from crossing below the conveyor.
The arrangement for fixing rubber curtain and rubber on skirt boards
shall be such as to ensure quick adjustment. The thickness of rubber
curtains shall be minimum 10 mm. Skirt board sealing with adjustable
segmented PU block shall be considered. Double Skirt sealing system
shal be provided where PU block shall be provided both inside and
outside skirt plate. The PU blocks shall be provided with slotted holes
to ensure quick adjustment.
The drive unit consisting of motor, gear-box, coupling and brakes along
with protective guards shall have a common base frame and shall be
fabricated form heavy structural sections and plates. Suitable bracings
should be provided wherever necessary on the drive unit base frame
and structure to make it rigid. Proper arrangements shall be provided
with gear-boxes and motors to maintain correct alignment with finish
pads for mounting. The drive base frames shall be bolted to the
structural floor beams/civil foundation of junction houses.
Shuttle conveyors shall have independent drive for travel motion &
Motion of Conveyor through electric motor and bevel helical gearbox.
Stringer frame for the conveyor shall be in segments independently
supported on wheels and connected together through hinged pins.
Screw take - up arrangements for the belt conveyors shall be
positioned at one of the hinged joints to avoid shifting of discharge
pulley location in the discharge hood.
Double flanged parallel tread wheels shall run on flat bottomed rails of
minimum 60 lbs/yd (or 60mm square bar) and shall have min hardness
of 350 BHN. Cleaners shall be provided to sweep the rail from spilled
material. Anti-friction bearings shall be used throughout. The travel
drive shall be so designed that no part of equipment shall project below
rail level.
The belt conveyor shall be driven through motor and bevel-helical gear
box. All other stipulation for conveyor component as detailed above
shall be applicable for the shuttle conveyor.
Belt Feeder shall be rugged construction having heavy duty flat belt,
life sealed impact idlers. Inlet opening to the feeder shall be equipped
with a manually adjustable vertical slide gate to adjust the depth of
material in the feeder. The load area shall be skirted on three sides.
The width of belt shall be so chosen that material shall not rub with the
side skirt. Belt feeders shall have a normal drive and shall be driven
with a variable speed drive if specifically mentioned. Belt scrapers shall
be provided to clean carrying as well as return side of the belt. The
maximum speed of belt feeders shall be limited to 0.5m/s. The drive
and tail frames, short post etc. shall be in partitions and bolted to each
other to facilitate mounting/removal of endless belt from sides.
Belt slip switches shall be provided for each conveyor to stop the drive
in case of excessive slippage of belt or over speeding. Provision shall
be made such that preceding conveyor does not start unless the
running conveyor picks up 80% of the rated speed.
23. Motors
II. For each equipment, the load test shall be conducted in stages. The
equipment shall be run for 8 to 10 hours continuously (cumulatively)
at no load, 25%, 50%, 75%, 100% of the rated capacities or at rate
mutually agreed upon between Contractor and Purchaser / MECON.
The intervening period shall be available for making adjustments and
arrangements by the Contractor as may be required.
III. All the specified speeds of the equipment shall be measured under full
load conditions.
IV. Proper operation of all positional limit switches for shuttle conveyor
and all safety switches for cable reeling drums, limit and safety
switches/ alarm for conveyors like pull cord switch, zero speed switch,
belt sway switch etc. shall be demonstrated by the Contractor in the
presence of Purchaser / MECON.
VI. Any other observations/ tests felt necessary for judging the
performance of the machines and mutually agreed between
Contractor and Purchaser shall be carried out.
VII. If during the test runs, there is an interruption exceeding 2 hours due
to any cause other than power failure or shortage of input materials
for which the Purchaser is responsible, the test run shall be
discontinued and fresh date shall be decided mutually by both the
parties.
approval.
- Load data and foundation pedestal plan for head end, tail end, drive
base frame etc., specially where the Junction House/ building is
provided by another supplier/ purchaser.
The Tenderer shall also furnish the following questionnaire and submit
with his offer. This data shall form a part of the contract with Successful
Tenderer.
General
i) Conveyor no. :
ii) Carrying capacity (t/h) :
(Rated/ Design)
iii) Centre to centre horizontal :
distance (m)
iv) Belt width (mm) :
v) Belt speed (m/s) :
vi) Total weight of conveyor (kg) :
vii) Pulley details :
a) Make :
b) Pulley diameter (mm) :
c) Face width (mm) :
d) Shell thickness (mm) :
e) Bearing
- Make :
- Expected life (hrs) :
f) Weight (kg) :
viii) Belting
a) Designation
b) Cover thickness
c) Cover Grade
ix) Brakes
a) Type
b) Torque rating
c) Brake drum dia
x) Idlers :
xi) Motors
a) KW rating :
b) RPM :
c) Type :
b) Type :
c) Reduction ratio :
d) Mech kW rating (kg-m) :
e) Overall efficiency :
f) Wt. of Gear box (kg) :
g) Hold Back considered
h) Type of hold back
xiii) Couplings
a) Make, type and rating of high :
speed couplings
b) Make, type and rating of :
low speed couplings
c) Weight (kg) :
All items essential for the desired operation of this equipment whether
specifically mentioned in this specification or not, shall be included in
the scope of work of the Bidder.
02.02.01 General
1. All equipment Shall be designed for out door duty and shall be complete
with mechanical, structural, power supply, conveyors, chutes, drives,
controls etc.
GS 06 -Rev-1, Sept-2016 Material Handling & Hoisting Page 32of 184
© 2016 MECON Limited All rights reserved
GENERAL TECHNICAL SPECIFICATION FOR
2. The machine shall be complete with bogie mounted tripper. The tripper
shall be have minimum possible height to reduce belt tension and power
requirement of the conveyor on which the machine is mounted. The tripper
inclination shall be limited to 15 degrees. For pellet tripper inclination shall
be limited to 10 degrees. The material shall be stacked on the bed through
yard conveyor; tripper and boom conveyor .The bucket wheel shall be
mounted at the end of a boom conveyor. The material received from the
bucket wheel shall be discharged on the yard conveyor (through the boom
conveyor and chutes) for onward supply to consumer shops. The slewing
mass of the machine shall be balanced to contain the centre of gravity well
within the slew bearing diameter. The machine shall be have bypass
arrangement, with the help of Diverter gate the material could be stacked
in the bed or directly go to the consumer shop or at the same time 50%
material shall be stacked and 50 % shall go to the consumer shop by three
positioning of the diverter gate. Position limit switch shall be provided for
indication at Operators cabin/Plant PLC.
3. The machine shall be complete in all respects including operator’s cabin,
electricals, Instrumentation, PLC system, Flexible Trailing Power, Cabling,
Lighting, Protection Devices, Earthing System, Remote Wireless based
interlocks, Control and Voice Communication etc. All items essential for
the desired operation of the machine, whether specifically mentioned in
this specification or not, shall be included in the scope of work of the
Supplier.
4. Following shall also be included in the scope of supply of the contractor:
fan and two adequately sized CO2 fire extinguishers. A hooter whose
sound can be heard from a distance of 300 m shall be provided outside
the cabin. The cabin shall be fixed with boom in such a manner that it shall
remain horizontal even when the boom is at extreme luffing positions.
6. Type of belting and idlers of the machine shall be interchangeable with
yard conveyor. The belting and type of idlers to be provided shall be
indicated to the successful Bidder.
7. The boom’s hoisting movement upwards shall be restricted to maximum
limit to prevent it from damaging the Reclaimer structure. However, the
provision shall be made to enable the boom end brought up to 1m above
ground for repair and maintenance by bypassing the operational limit
switch that restrict its down ward movement.
8. The height of the boom end shall be automatically adjusted to limit the
height of the free fall of the discharge materials. The boom hoist shall get
automatically adjusted so that the height of free fall of material shall not
exceed 2m and shall not be less than 1m. However, at the start of
formation of pile on the ground, the initial height of free fall may be up to
4m. central stockpiling shall be possible with all boom positions. Before the
stack of material reaches to its topmost height in a particular position an
audio visual signal shall be provided in the cabin to warn the operator to
plan for shifting of the machine to the next location.
9. The machine shall be suitable for reclaiming material from the stock pile of
the given cross section with full capacity by operating from one side of the
stock pile leaving a maximum 2% as dead stock.
6. The electrical room shall be pressurized type to prevent dust ingress
and shall be provided with 2 ton (min.) A.C. Electric hoist of suitable
capacity shall be provided in the electrical room.
7. Press to talk system shall be provided.
8. Over travel device (non contact type) shall be provided.
9. Auto tension trip device shall be provided for cables.
10. Each Stacker-cum-Reclaimer shall be provided with a storm anchor
support at one end of the bed. The same shall also act as boom resting
pad for maintenance purpose.
4. The counter weight boom with ballast shall be mounted on the upper
structure. The counter weights shall be made out of concrete T
sections. There shall be provision for easy access to the counter
weight and mast.
5. The boom conveyor with bucket wheel assembly, the mast and
counterweight mounted on the upper structure shall rotate over the
slewing bearing ring. The slewing mechanism shall consist of the gear
rim mounted rigidly with the under-frame and the drive unit comprising
of motor, overload safety coupling, gear box and pinion shall be fitted
with the upper structure of the equipment. Gear rims & pinions shall be
provided with protective hood.
7. Toi take care of impact of reclaimed material from the discharge boom
conveyor of reclaimer, an impact table consisting of a number of impact
idlers mounted on a frame suitably attached to the sub-structure below
GS 06 -Rev-1, Sept-2016 Material Handling & Hoisting Page 35of 184
© 2016 MECON Limited All rights reserved
GENERAL TECHNICAL SPECIFICATION FOR
the central discharge chute of the reclaimer along with a skirt shall be
provided and the same shall move with the machine along the yard
conveyor.
1. The design of the bogie and carriages of the equipment shall be such
that differential movement of the wheel sets of the machine on two rail
tracks resulting in skewing effects does not occur. The traverse
bogies shall be provided with material removing guard plate as well as
rail cleaners at both ends so that the machine can travel even if
there is spillage or overflow of material on rail track and the L.T.
drives shall e be selected accordingly.
3. Walkway of minimum 800 mm width with grating floor and hand railing
shall be provided on both side of the boom and tripper conveyor
wherever applicable.
6. All matching parts shall be given identifiable marking for easy erection
of the machine.
13. Adequate working space on the platform around all machinery parts
shall be provided for personal working for maintenance or inspection.
15. All edges or openings shall be provided with toe guards. Toe angles
or bent plates shall be minimum 100 mm in height.
17. All moving parts, wherever required from the safety point of view,
except long travel gear wheels, shall be provided with covers opening
on strong hinges. These covers shall preferably be made of minimum
3 mm thick plate. All heavy covers shall be provided with inspection
windows.
20. Sizes for all equipment viz. wheels, brakes etc. Shall be selected from
preferred number series and shall be of reputed make.
21. The design of the equipment shall ensure that there is no spillage of
material on any part of the equipment. Dust covers shall be provided
for all motors, gear boxes, drums etc.
22. End limit switches and over run limit switches shall be provided at both
the ends of the movements / motions. The corresponding strikers shall
also be supplied by the bidder.
23. The speed of the boom conveyor shall be in line with the speed of the
yard conveyor.
24. The machines shall be provided with adequate numbers of buffers. The
corresponding buffer stop at rail yard has also to be provided by the
bidder
25. The bucket wheel shall be driven by hydraulic motor directly mounted
on bucket wheel drive shaft.
27. Suitable probe / capacitance type level sensor shall be provided at the
boom end for sensing the material height and accordingly to adjust the
boom luffing as required and to avoid collision.
1. The long travel mechanism drive shall be provided with multiple drives
on each side. In the event of failure of any drive motor, the
corresponding motor on the other side shall be automatically
disconnected. However, the machine shall be operable with the
remaining drives at a lower speed.
5. For travel motion, rotating axle drive arrangement with 'L' type supports
shall be provided.
10. The output shaft of the hydraulic drive shall be equipped with a pinion,
meshing with the toothed rim of the slewing bearing.
1. The slewing mechanism shall consist of Slew bearing, slewing ring and
the toothed rim with which two pinions shall be in mesh. Both the
pinions shall be driven by AC motors with VVVF drive (refer electrical
specifications for details) through safety couplings and planetary gear
boxes. Thrustor brakes with brake drums & pin bush couplings shall
be provided. The gear rims and pinions shall be provided with
protective hood. Calculation for selection of slew bearing shall have
approval of bearing manufacturer. Geared motors shall not be used
The length of the shaft between pinion and gearbos shall selected such
that the all the component of slew drive is approachable from slew
deck.
2. The Slew ring supplied shall be integral part along with slew bearing.
4. The Slewing motion shall be covering 210 deg. (105 deg. on either side
of the track)
5. Though both drives are in operation normally, the drive rating shall be
selected such that each motor can be used for operation temporarily in
case of failure of one motor.
1. The wheels shall be double flanged with straight tread, and shall be of
forged steel of C55 IS 2004 / equivalent.
Speed : : 5%
1. The bucket wheel shall be fitted with cell less type of buckets &
supported on two pillow blocks of double row spherical bearings at the
head of the boom. The wheel shall be inclined to the vertical by 6
degree to 8 degree and off set to the boom conveyor belt axis by 8
degree to 10 degree.
2. The bucket wheel shall be of welded construction. The inner wall of the
bucket wheel body shall be provided with chromium carbide liners
fused on MS backing plate in whole of slant chute & circular chute.
3. The design and construction of bucket shall be such that it will empty
all the materials fully from the buckets.
9. Bucket wheel drive side & non drive side bearing shall be provided with
an extra protective guard which protects the bearing from water & dust.
However, suitable provision for access to the grease nipples on the
bearing block, without removal of the protective guard shall be
considered in the guard design.
11. The no. of discharges per minute shall be restricted to 40 for Iron ore /
Pellet.
4. The hydraulic system shal be mounted on the slew deck and shall
consist of two independent system, One system shall driving the
hydraulic motor and the other the luffing cylinder preferably mounted
on a single oil sump to save space.
5. Hot stand-by hydraulic pump and motor mounted on same oil reservoir
for both luffing and hydraulic motor shall be considered for luffing
system and bucket wheel. The design and construction of hydraulic
system shall be suitable to operate in the atmospheric conditions and
dusty operating environment of the plant. The system shall be
complete and consist of hydraulic fluid, various kinds of valves,
accumulators, hydraulic motors/ hydraulic pumps, various accessories
such as filters, strainers, magnet and restructures, hydraulic pipe work,
fittings and fluid passages, flexible pipe work, sealing devices,
instruments for indicating various parameters such as pressure,
temperature etc., control devices for local and automatic
operation of the system, safety devices and alarm for abnormal
operating conditions, interlocks for sequencing and safe operations.
11. The hydraulic motor shall be of fixed displacement, radial piston, cam
curve design suitable for continuous industrial duty operation even at
low speeds. The hydraulic motor shall be directly mounted on the
pinion shaft without any mechanical speed reduction unit such as gear
box. Motor shall be selected such that it can deliver the full range of
unit such as gear box. Motor shall be selected such that it can deliver
the full range of torque & speed combination under various operating
conditions e.g. start – up on full load, continuous duty at full rated
capacity etc. system pressure shall have sufficient range to take care
to handle peak load, start – up & overload.
14. A suitable capacity reservoir with provisions for oil filling, air breathing,
15. The reservoir shall be designed to prevent the ingress of any foreign
materials including water and dust. The reservoir & system piping
fittings for slew drive hydraulic system shall be of stainless steel
material.
16. Inner face of the reservoir shall be sand blasted and shall be suitably
painted, so that it does not have any adverse effect on hydraulic fluid
used.
17. Suitable level indicators shall be provided in the reservoir. Low level of
the fluid in the reservoir shall produce warning alarm in the operator's
cabin and switch off the hydraulic pumping unit.
18. Each set of Pump and pump motor shall be designed to operate under
load conditions at a minimum of 125% of system operating
pressure and give a flow rate of 125% of system operating flow rate.
19. All hydraulic valves, accessories and devices shall be provided with
identification metal tags.
20. Necessary relief valve shall be provided to protect the hydraulic system
from excessive pressure. The fluid leaked through the relief valve shall
be suitably carried to the reservoir. The overload of the system in
raising or lowering of the boom shall be give necessary warning signal
in the operator's cabin.
1. Straight and helical, spur gearing shall be used. Worm gears shall be
not be used unless specified otherwise all spur gears shall be have 20
degree pressure angle with involutes teeth profile.
2. All first reduction pinions and also other pinions, if feasible, shall be
integral with the shafts.
not possible.
9. Covers shall be split horizontally at each shaft centre line and fastened
and arranged so that the top half can be removed for inspection and
repair without disturbing the bottom half.
10. Directly above the mesh line of teeth, hand-holes with bolted covers be
provided in the gear box body for inspection of the teeth.
11. Oil pumps with filters etc. shall be used if vertical gearing exceeds two
reductions. On horizontal gearing, the oil level shall be above the
smallest gear.
12. All gear boxes shall be mounted on machined surfaces and shall have
machined feet. Shims shall not be used.
13. Gear boxes shall be provided with lugs or other means for lifting
purposes.
14. Interior of all gear box housing shall be sand blasted. Suitable
resistance paint matching to the lubricant used shall be applied inside
the gear box.
16. The reducers shall be selected with a service rating of 1.8 times the
calculated mechanical kW or 1.25 times the motor rating, whichever is
higher. Gear boxes shall be provided with breather vents, oil level
indicators, dip stick and easily accessible drain plugs.
2. Rated life of ball and roller bearings shall be designed for B-10 life of
not less than 40,000 hours.
02.02.11 Couplings
02.02.12 Brakes
2. Double shoe brake shall be provided for each drive and shall be
mounted on the input pinion of the gear train. The brake shoes shall be
of hinged type. Brake levers shall be forged or fabricated or of cast
steel. Hinge pins shall be of hardened alloy steel and shall be
lubricated. These hinge pins shall be provided with steel bushes at
bearing points.
5.Brakes shall be installed such that these are easily approachable for
servicing.
7.The service factor shall be 1.5 on motor rating for selection of all
gear-boxes/ couplings, brakes etc.
d) The automatic rail clamps shall be such that when wind velocity
reaches 112 km/hr, the machine shall be automatically shut down
and the rail clamps applied.
02.02.15 Chutes
02.02.16 Lubrication
GS 06 -Rev-1, Sept-2016 Material Handling & Hoisting Page 48of 184
© 2016 MECON Limited All rights reserved
GENERAL TECHNICAL SPECIFICATION FOR
4. Suitable fire alarm with fire detectors shall be provided for the
electrical premises.
1. All steel structures and the portal frames shall be of box construction
with double web plate girder. The span to depth ratio shall be not
exceeding 18. For box plate girders, all diaphragms shall bear against
the top flanges.
6. All bolts except those with nyloc nuts shall be provided with grip lock
nuts and/or spring washers.
7. For side alignments of motors, strong adjustable screws with lock nuts
and sliding blocks shall be provided.
10. Design of the structures for these equipment shall be take into
account the following factors and shall be have ample precautions
taken to withstand the following.
2. Walkway of minimum 800 mm width grating floor and hand railing shall
be provided on both the sides of the boom conveyor and tripper portion
for maintenance purpose. Conveyor structures shall be such that all
idlers are easily approachable from the walkways.
Rail mounted self propelled, luffable, slewable boom type stacker cum
bucket wheel reclaimer, complete with electrics etc. shall be supplied
as per the given specification. The main characteristics of the machine
shall be as follows.
3) Capacity, tph :
Stacking :
Rated : As per Flow Diagram
Designed : 20% above Rated capacity
Reclaiming
Rated : As per Flow diagram
Designed : As per Flow Diagram
5) Track centres : 8m
The equipment shall conform to the latest Indian Electricity Rules and
Regulations as regards safety requirements, earthing and other
essential provisions specified therein. They shall e also comply with
the statutory requirements.
a) Mechanical
(Reaffirmed 1991)
b) Electrical
03.01 The scope of work of the Tenderer shall include design, engineering,
manufacture, fabrication, assembly, testing and inspection, packing,
dispatch, transportation, delivery FOR Purchaser’s site, unloading,
handling and storage at site, erection, erection supervision, testing,
inspection, commissioning, guarantee testing and handing over to the
client including all electrics and standard accessories of electronic micro-
processor based Belt Weigh Scales as covered under this specification.
The scope of the Tenderer shall be deemed to include all such items
which although are not specifically mentioned in the specification, but
are needed to make the equipment complete in all respect for its safe,
reliable, efficient and trouble free operation.
Insurance spares.
Required quantity of initial fill of oil, grease, lubricants, hydraulic fluid etc.
and other consumables which are necessary for cleaning/ flushing
including erection, testing and commissioning the equipment shall be in
the scope of supply of the Tenderer.
1. General
Belt weigh scale for measurement of flow rate and total-quantity shall
be provided at specified locations as per relevant requirement as
indicated in data sheets. System shall be complete with flow rate
indicator, totaliser, control panel etc.
3. Equipment Specification
Each belt weigh scale shall comprise of a belt weigh scale platform
with minimum 4 nos. weighing idlers. It shall have unitized construction
for ease of installation and shall be fully floating type (without pivot
points). Minimum 3 nos. hermetically sealed load cells of precision
strain gauge type shall be applied in tension to support the weigh
bridge. The load cells shall have 100% overload protection and shall be
structurally safe upto to 250% of rated belt scale capacity.
Fully automatic zero and span calibration facility shall be provided. The
electronic systems offered by the Bidder shall include all signal
conditioning, power amplifiers and printed circuits etc. The printed
circuits shall be encapsulated against dust and moisture.
Belt scale shall be provided with flow rate total quantity etc. Remote
flow rate indicators shall also be additionally provided in the Central
Control Room i.e. duplicated. Special cables, if any, required for
transferring data from scale location to control room shall be within the
scope of tenderer.
The flow rate indicator shall have minimum 4 digits. The flow totalizer
should have 8 digits display scale with reset facility.
03.03 DOCUMENTATION
03.04 Questionnaire
Type :
Operation :
Overload protection
Capacity :
Accuracy :
Calibration :
2. The scope of supply and services of the Tenderer shall include the
following:
a) Mechanical
3. All fixing bolts and nuts including foundation bolts shall be included in
the scope of supply of Tenderer.
6. Insurance spares.
7. Required quantity of initial fill of oil, grease, lubricants, hydraulic fluid etc.
and other consumables which are necessary for cleaning/ flushing
including erection, testing and commissioning the equipment shall be in
the scope of supply of the Tenderer.
10. The scope of work shall stand supplemented by such details as are
given in this specification, tender drawing, and instruction to the
Tenderer, General Conditions of Contract (GCC), or any other part of the
document.
1. General
The Supplier shall make his own calculation in respect of motor kilowatt
to ensure satisfactory performance of the equipment.
All equipment shall be designed such that all components are easily
accessible for inspection, repair and maintenance.
f. All bolts except those with nyloc nuts shall be provided with lock nuts
and spring washers.
g. No cast iron parts shall be used (except for pillow block with FG - 260)
04.02 DOCUMENTATION
e. List of tools and tackles to be supplied with the plant and equipment.
g. The Tenderer has to furnish one copy of the specification drawing duly
signed by him as a token of acceptance along with the list of deviation
from tender documents.
04.03 QUESTIONNAIRE
The Tenderer shall furnish the following questionnaire and submit with his
offer. This data shall form a part of the contract with Successful Tenderer.
11. Motors
a) KW rating :
b) RPM :
c) Type :
05.00 Scope
The scope of supply and services of the Tenderer shall include the
following:
a) Mechanical
2. Technical requirement
c. The deck area excluding solid deck area shall be minimum 0.75
m2 per 100 tonnes/hr of incoming feed. Inclination of the grizzly
pan shall be so selected so as to ensuing proper flow ability of
material on the deck without any hindrance.
3. Constructional Features
a. The deck shall have continuous solid deck section in the impact
zone under direct material fall and remaining deck shall be
fitted with perforated deck assembly.
d. The Vibrating deck shall be mounted on the floor with the help
of helical springs made of alloy steel. No rubber / synthetic
material for the support shall be provided.
f) G.A. drgs for the equipment/ system including sections and details
giving relevant information, binding dimension, loads for designing
civil/structural works etc.
05.03 QUESTIONNAIRE
The Tenderer shall also furnish the following questionnaire and submit
with his offer. This data shall form a part of the contract with Successful
Tenderer.
17. Designation
27. Foundation load data for screens & feeders for design of
building
28. Duty
32. Details of spring, i.e. material composition, wire dia , free length
etc.
33. Whether anti- vibration pads have been provided below spring
base plate
b) Type :
c) Reduction ratio :
d) Torque rating (kg-m) :
e) Overall efficiency :
f) Wt. of Gear box (kg) :
36. Couplings
a) Make and type of high :
speed couplings
b) Make and type of low :
speed couplings
c) Weight (kg) :
26. Bearing
Make :
Expected life (hrs) :
1. The scope of supply and services of the Tenderer shall include the
following:
All fixing bolts and nuts shall be included in the scope of supply of
Tenderer.
1. Only the broad specifications covering the technical requirements for the
equipment to be supplied are indicated. It is not the intent of this
specification to specify complete details of the equipment including
design and manufacture. The Successful Tenderer shall carry out
detailed design, engineering and manufacture in a manner that shall
ensure smooth and trouble free performance of the equipment as a
whole.
GS 06 -Rev-1, Sept-2016 Material Handling & Hoisting Page 74of 184
© 2016 MECON Limited All rights reserved
GENERAL TECHNICAL SPECIFICATION FOR
Rod gates shall be fitted between the bunker & equipment below like
feeder/screens etc. to control the feed rate and to isolate the
equipment from the bunker during maintenance. The gate shall be
normally in partial /full open position and shall be controlled manually.
The gates shall be fabricated from rolled steel of minimum ISMC 200
section. All rods shall be of minimum 32mm dis diameter that ensures
no bending and MOC shall be high carbon steel. The spacing between
rods shall be decided based on size of material stored in hopper/ bin &
direct material load. The tapered ends of the rod shall rest on square
bars placed beyond zone of discharge. A tray shall be provided on the
hopper for storing the rods. The rod gates shall be in 2 rows. The
direction of removal of rods shall be such that it shall not come in the
way of vibro-feeder suspension arrangement.
6. Sector gates shall be biparting clamshell type fitted below bins/ bunkers
and shall be electrically operated to regulate the discharge of material
from the bins/ bunkers. Sector gates shall be constructed out of
materials having good resistance against impact and sliding wear rolled
plates (Fe 570) after hardening and tempering to HRC 25-3 with 10 thk.
SAILHARD liner. The material of pin shall be C-40 (IS: 1570 – 1979).
The sector gears used shall be made of cast steel grade 23-24 (IS: 1030
– 1989) or EN-8 or equivalent and the teeth shall match perfectly to
render noiseless and smooth service in operation. Wear resistant liner
plate of suitable material shall be provided. Liner shall be provided on
the gate main body and bottom portion. Antifriction ball and roller
bearings shall be used throughout.
All bolts except those with nyloc nuts shall be provided with grip lock
nuts or washers. Stud or body bolts shall not be used as fasteners for
mechanical items.
The flap gates shall be used to divert the flow of material received from
feeding conveyor to the receiving conveyors. The gates shall be
operated by an electromechanical linear actuator. The actuators will be
mounted on the chute body/ or on a working / maintenance platform.
The flap gate travel shall be in the range of 60° to 70°. Limit switches
shall be provided to indicate extreme positions. Lever arm shall be
provided between actuator and flap gate shaft for obtaining required
thrust. Each gate shall be provided with a shaft, a hand lever and self
aligning type antifriction bearings with adequate sealing for dust
proofing.
GS 06 -Rev-1, Sept-2016 Material Handling & Hoisting Page 76of 184
© 2016 MECON Limited All rights reserved
GENERAL TECHNICAL SPECIFICATION FOR
Suitable self aligned double row ball bearings of approved make in dust
tight housing shall carry the gate shaft
8. Rack & Pinion Gates shall be of two types, i.e. motorised actuator
operated or manually operated. All clauses below under “Motorised
Rack & Pinion Gate” shall be applicable for manually operated Rack &
Pinion Gates also, except that the mode of operation shall be manually
and hence actuators, drives etc. are only for the motorised type.
The gate shall be fitted in the transfer chutes between the bunkers /
hoppers and feeders to control the feed rate to the feeder. During
GS 06 -Rev-1, Sept-2016 Material Handling & Hoisting Page 77of 184
© 2016 MECON Limited All rights reserved
GENERAL TECHNICAL SPECIFICATION FOR
The gate shall be normally in partial / full open position. Actuator shall
be provided for opening & closing of the gate. In case of by-passing the
actuator, the gates opening shall be controlled by the hand chains
(manually).
The actuator operated rack & pinion gates shall be suitable for closing
and opening the gate with hopper / bunker full.
Rack and Pinion Gates shall be fabricated from rolled steel plates and
section of minimum ISMC 200. It shall be complete in all respects
including gates plate, frame work, operating chains, sprockets, gear
rack and pinion, rollers etc. The gates plate shall have wear resistant
liners and shall slide over rollers mounted on anti-friction bearings. The
nos of rollers shall be such the gate is supported on minimum 3 nos
rollers at any position. The gate plate shall be properly stiffened to
avoid distortion of gate plate. The flap shall be made of minimum 12
mm thick plates and lined. Material of construction for various elements
shall be:-
The pull required to operate the gate manually (on actuator bypass)
shall not exceed 25 kg when operating under a loaded bunker / hopper.
All bolts except those with nyloc nuts shall be provided with grip lock
nut or grip washers. Stud or body bolts shall not be used as fasteners
for mechanical items.
06.02 DOCUMENTATION
06.03 QUESTIONNAIRE
The Tenderer shall also furnish the following questionnaire and submit
with his offer. This data shall form a part of the contract with Successful
Tenderer.
GS 06 -Rev-1, Sept-2016 Material Handling & Hoisting Page 79of 184
© 2016 MECON Limited All rights reserved
GENERAL TECHNICAL SPECIFICATION FOR
07.00 Scope
I. Hierarchy of Specifications
a) Technical Specification
b) General Technical Specification (GTS)
e) Indian Electricity Rules & statutory requirements of
Central Govt. and State Govt.
The components and materials used and the equipment supplied shall
conform to high standards of design, engineering and workmanship
and shall be suitable for efficient operation and reliable service in steel
plant conditions.
Pillow blocks
Reducer
The Supplier shall make his own calculation in respect of motor kilowatt
to ensure satisfactory performance of the equipment.
All equipment shall be designed such that all components are easily
accessible for inspection, repair and maintenance.
The conical gate shall be guided on top and shall slide over rollers at
bottom. The rollers shall be provided with anti-friction bearings and the
gate shall be supported on minimum 3 nos roller at all positions.
The drive shaft shall be made of C45. Antifriction ball / roller bearings
shall be used throughout.
Provision for manual operation of the gate shall also be provided at the
extended motor shaft. Manual force required shall not exceed 25 kg.
Rubber buffers on the gate shall be provided at both ends inside the
casing.
All bolts except those with nyloc nuts shall be provided with lock nuts
or spring washers.
07.02 DOCUMENTATION
07.03 Questionnaire
The Tenderer shall also furnish the following questionnaire and submit
with his offer. This data shall form a part of the contract with Successful
Tenderer.
GS 06 -Rev-1, Sept-2016 Material Handling & Hoisting Page 84of 184
© 2016 MECON Limited All rights reserved
GENERAL TECHNICAL SPECIFICATION FOR
05. Designation
10. Motors
a) KW rating :
b) RPM :
c) Type :
a) Make :
b) Type :
c) Reduction ratio :
d) Torque rating (kg-m) :
e) Overall efficiency :
f) Wt. of Gear box (kg) :
12. Couplings
All the equipment shall be of reputed make and proven quality with
regard to their performance. The make shall be as per approved list of
Purchaser/Consultant.
The crane shall be inspected and tested during different stages of its
manufacture (starting from raw materials till the completion of the
crane) by the Purchaser/ his authorized representative at the Supplier's
or his sub supplier’s works as per the inspection procedure mutually
agreed between the Purchaser or his authorized representative and the
Supplier. Inspection shall be regarded as a check up and shall be in no
way binding on the Purchaser.
i) General
vi) No cast iron parts shall be used except for electrical equipment and no
wood or other combustible material shall be used unless specifically
mentioned otherwise. Deviations, if any, to this clause shall be
permitted only with the specific approval of the Purchaser.
viii) For welded construction such as that of bridge girders, end carriages,
rope drums, gear-boxes etc. steel shall be as per IS: 2062-1992
quality. For welding these members low hydrogen electrodes shall be
used.
ix) All wheels, couplings, open gears etc. shall be provided with covers,
opening on strong hinges. All heavy covers shall be provided with
inspection windows. Minimum thickness of such steel covers shall be
3.15mm.
x) Where down shop leads are located below runway rails, guards shall
be provided on the crane to prevent the hoist ropes from coming in
contact with down shop leads.
xi) All bolts except those with nyloc nuts shall be provided with grip lock
nuts or spring washers.
xii) For outdoor cranes all electrical and mechanical equipment which are
exposed to weather shall be completely covered or made weather
proof. The covers shall be segmental to facilitate easy dismantling and
assembly.
xiii) The end carriages shall be fitted with substantial safety stops to
prevent the crane from falling more than 25 mm in the event of
breakage of a track wheel, bogie or axle. These stops shall not
interfere with the removal of wheels.
xiv) Fasteners for pedestal blocks, motors, gear-boxes etc. shall be easily
removable from the top. Studs or body bound bolts shall not be used
as fasteners for mechanical items except for fixing cover.
xv) Power & control cables shall be clamped in-groups separately. All
trailing cables shall be clamped with PVC or non-metallic clamps.
Group de-rating factor shall be appropriately taken according to the
recommendations of the cable manufacturers based on the method of
laying and number of cables being laid together.
xvi) Guards of approved design, which will push forward off the track, any
object placed across it, shall be attached to each end of the end
carriages.
xviii) Defects in the material like fractures, cracks, blow holes, lamination,
pitting etc. are not allowed. Rectification of any such flaw is permissible
only with the approval of the Purchaser.
ii) Tolerances: The Tenderer / Supplier shall ensure that the crane shall
be manufactured as per the tolerances specified below :
: mm span
+ 5 mm above
7500 mm span
(vii) Trolley track gauge : + 3 mm upto 7500
: mm span
+ 5 mm above
7500 mm span
(viii) Difference in height between trolley
rails (H) in relation to the trolley track
gauge (S) shall be within the
following tolerances:
`S' (mm) `H' (mm)
Upto 2500 : 4
Above 2500 and upto 4500 Above : 6
4500 : 10
(ix) Horizontal bend of girder in plan : Span / 2000
:
(x) Shift of the web plates of main & end : H / 200
girders from vertical over height `H’ :
measured near the mid span & close
to the main diaphragm.
(xi) Twist of the main girder : Span / 1500
(xii) Axis of the flange plates from the axis : H / 250
of the beam
(xiii) Tolerances on camber
Upto 4 mm : (+) 4
(-) 0
:
Above 4 mm and upto 8 mm. (+) 5
(-) 0
:
Above 8 mm and upto 16 mm. (+) 6.3
(-) 0
:
Above 16 mm and upto 31.5 mm (+) 8
(-) 0
:
Above 31.5 mm and upto 63 mm (+) 10
(-) 0
(xiii) Over buffer length : + 5 mm
(Over buffer dimension on two sides :
shall be same)
(xiv) Height of center of buffer : + 5 mm
(from top of track rail)
GS 06 -Rev-1, Sept-2016 Material Handling & Hoisting Page 89of 184
© 2016 MECON Limited All rights reserved
GENERAL TECHNICAL SPECIFICATION FOR
ii) Deflection Test: The deflection test of the bridge girders shall
be carried out as per IS: 3177-1999. After the deflection test
with safe working load, the crane shall be tested for deflection
with 25% overload and there shall not be any permanent set
after the removal of the load. The deflection of the bridge girder
shall not exceed 1/900 of span with the fully loaded trolley at
the middle of the span.
a) All motion of the crane shall be tested with rated load and
speed (together) and the speeds shall be attained within the
tolerance limit.
b) All motions of the crane shall be tested with 25% over load in
which case the specified speeds need not be attained but the
crane shall show itself capable of dealing with the overload
without difficulty.
ii) The crane bridge girder up to 12-m span shall be in one piece.
Girders above 12 m span may be spliced. The number of such
splices shall not exceed 2 up to 36 m span. Beyond 36 m span,
the number of splices may be 3. Splices shall be designed to
resist all the forces and moments to which it is subjected to, plus
50% thereof.
iii) Black bolts shall not be used in the main structure of the cranes.
iv) Cross travel rail shall be fixed to the bridge girders by clamping
only and not by welding.
vi) Plates, bars, angles and where practicable other rolled sections
used in the load bearing members of structures shall not be less
than 6 mm in thickness.
vii) The end carriages shall be of double web plate box construction
and shall be connected to the girders by welding at shop or by
large gusset plates and fitted bolts to ensure maximum rigidity.
Drop stops and jacking pads shall be built-in features of the
cranes. Full length checkered plate platforms shall be provided
along both sides of the cranes in order to ensure easy access to
crane crab, long travel gears and other parts. Safety railings shall
be provided on crane bridges and crab frame. Access to the
operator's cabin shall be via staircases only and not through
ladders. Platforms to facilitate inspection and dismantling of long
travel wheels and main current collectors shall be provided.
ix) The closed cabins shall be equipped with circulating and exhaust
fans whereas open cabins shall have only circulating fans.
xi) All the cabin floors shall be covered with heat and electrically
insulated material. The cabin shall also be equipped with
adjustable swivelling type upholstered chair.
xii) The crab frame shall be made of steel plates and rolled sections
in welded construction. Crab frame shall be fabricated in one
piece if there are no transport limitations. If the trolley is
fabricated in more than one piece due to transport limitation, the
design of the splice shall be such that one unit of mechanism
mounted on one part of the trolley, does not come over the other
part.
xiv) The platforms along the bridge girders and over the crab shall
allow convenient access for replacement, inspection, lubrication
v) MECHANICAL DETAILS :
i) Rope drums
The wire rope shall be hemp cored for all cranes. Ropes shall be
regular right hand lay as per IS : 2266-1989. The construction of
the ropes shall be 6 x 37 upto 16 mm diameter and 6 x 36 above
16 mm diameter.
Straight and helical spur gearing shall be used for all motions.
Worm & bevel gearing shall not be used. All first reduction gears
shall have helical teeth. All pinions shall be integral with the shaft.
All gears shall be hardened and tempered alloy steel having
metric module. Overhung gears shall not be used.
Surface hardness for pinion shall be 255 to 300 BHN and for
gears it shall be 215 to 260 BHN. Difference in hardness of pinion
and gear shall not be less than 20 BHN. All cast steel gear shall
be tested by Gamma Ray. All gears shall be enclosed in oil tight
gear-boxes. Gearboxes shall be of high grade cast iron/cast steel
or fabricated and split at each shaft centerlines. Fabricated
gearboxes shall be stress relieved before machining. For
Cross-travel and Long-travel motions, horizontal gear-boxes shall
be used unless and until there is specific requirement for hook
approaches in which case CT shall be provided with vertically
gear-boxes with `T' split and dual (one standby) pump for
lubrication.
vii) Wheels
For process cranes of 100T Capacity and above and for Rotating
trolley cranes, wheels shall be of EN28M material. All Rotating
trolley cranes shall be on slew bearings of RotherDe (Germany)
make – (Wheel on rail type RT cranes are not acceptable).
x) Buffers
xi) Brakes
xii) Lubrication
08-A-03 DOCUMENTATION
24. Motor:
( Type, kW, rpm starts/ hr enclosure etc)
a) Main hoist
b) Aux hoist
c) Cross travel
d) Long travel
25. Type of control for each motion with corresponding
characteristic curve :
26. Method of obtaining creep speed:
27. Power supply
- Power supply S.L.D:
- Electric equipment specification
28. Control voltage
29. Ambient temp/ Environment
30. Total weight of the crane (t)
31. Break up of crane weight (t)
a) Structural
b) Mechanical
c) Electrical
32. Total weight of the crab (t)
33. Code of design
34. General arrangement drawing, incorporating the front and side
elevations, plan, hook approaches, location of cabin/ pendant,
down shop lead, clearance dimension, handling attachments
and other relevant characteristics of the crane.
35. Details of swiveling / rotating arrangement, if any, along with
scheme.
36. Any other information
08-B-01 The scope of work of the Tenderer shall consist of design, manufacture,
inspection, assembly, and painting at manufacturer’s shop as well as at
site after erection, supply and transportation to site, obtaining necessary
statutory clearances unloading and re-conservation at site, erection
testing & commissioning of Single Girder EOT / Under Slung Cranes of
various capacity.
All electrical cables shall be so laid that they are not liable to be
damaged and can be easily inspected and tested.
No cast iron parts shall be used except for electrical equipment and no
wood or other combustible material shall be used unless specifically
mentioned otherwise.
Where down shop leads are located below runway rails, guard shall be
provided on the crane to prevent the hoist ropes from coming in
contact with down shop leads.
All bolts except those with nyloc nuts shall be provided with grip lock
nuts or spring washers.
GS 06 -Rev-1, Sept-2016 Material Handling & Hoisting Page 99of 184
© 2016 MECON Limited All rights reserved
GENERAL TECHNICAL SPECIFICATION FOR
a. Design of Mechanisms
b. Rope Drums
c. Wire Rope
The wire ropes shall be regular right hand lay hemp cores as per
IS: 2266/1989. However, ropes working under water and in corrosive
atmosphere shall be galvanized and shall have steel core. For rope
arrangement with 2 falls, wire rope shall be of non-spinning type. For
the cranes in steel plant, selection of wire rope shall be as per IPSS.
d. Rope Guides
e. Rope sheaves
f. Wheels
For single girder EOT cranes, the wheels for long travel motion
shall be double flanged with straight tread. The width of wheel tread
shall be greater than the rail head by 30 mm. For under slung cranes
hoists block, the wheels shall be single flanged with straight/ taper
tread to suit the track beams. Minimum diameter of the LT wheels for
S.G. EOT cranes shall be 320 mm. However, in case of steel plant
duty cranes the combination of wheel diameter and rail size shall be
ensured. Wheels shall be of forged/ rolled/ cast steel with minimum
hardness of 200 BHN in case of single girder under slung cranes
running on rolled steel joist and 300 BHN for EOT cranes and for
under slung cranes/ hoists running on wear resistant flats welded to
rolled steel joists. Minimum diameter of CT & LT wheels for under
slung cranes shall be 200 mm.
k. Motors/ Couplings
l. Hook Blocks
m. Brakes
n. Buffers
08-B-05 DOCUMENTATION
I/ Crane No. :
ii/ Nos. off :
iii/ Type of crane :
iv/ Capacity (t) :
v/ Span (m) :
vi/ Duty class :
vii/ Location :
viii/ Hoists :
a) Speed with safe working load, m/min :
b) No. of rope falls supporting the load
and specification of rope :
c) Lift of hook above floor, m :
d) Drop of hook below floor, m :
e) kW of motor at specified rating :
f) RPM of motor :
g) Make, type and size of brake :
ix/ Cross - travel
a) Speed with working load, m/min :
b) Wheel base, mm :
c) No. of wheels :
d) kW of motor at specified speed :
e) RPM of motor :
ELECTRIC HOIST
08-C-01 The scope of work of the Tenderer shall consist of design, manufacture,
inspection, assembly, and painting at manufacturer’s shop as well as at site
after erection, supply and transportation to site, unloading and re-
conservation at site, erection testing & commissioning of Electric hoist of
various capacity.
b) For outdoor hoists, motors, brakes & other equipment shall be covered to
suit to outdoor operations.
e) No cast iron parts shall be used except for electrical equipments and no
wood or combustible material shall be used unless specifically mentioned
otherwise.
g) All bolts except those with nyloc nuts shall be provided with grip lock nuts
or spring washer.
h) All parts of the hoist shall be thoroughly cleaned of all loose mill scales,
rust or foreign matter & then painted as specified. All parts inaccessible
after assembly shall be painted before assembly & assembled while paint
is still wet.
i) All parts except motors, resistors, gears, thrustors, solenoids, etc. shall be
de-rusted manually & painted as follows:
The electric hoist shall run on two pairs of wheels, a pair of which shall
be driven by flange mounted motor through reduction gear. The wheels
shall be of cast steel/forged steel, single flanged with taper / parallel
treads to suit to monorail. The wheels shall be mounted on anti-friction
bearings & shall be easily removable for repair & replacement. The
wheel diameter shall be selected such that skidding does not take
place even under unloaded condition.
03. Gearing
Straight & helical spur gearing shall be used for all motions. Worm &
bevel gears shall not be used with specific permission from purchaser.
Preferably all first reduction gears shall have single helical teeth. All
gears shall be hardened & tempered alloy or carbon steel with machine
out teeth. Surface hardening of teeth is not acceptable. All gears shall
be enclosed in oil filled gear box except when not possible.
For Hoists of capacity 5 T & above, the motor (Foot mounted B3 type)
shall be connected to its gear drive by a flexible coupling. Flange
mounted motors (B5) may be used for Hoists of capacity below 5T and
also for traverse drive of hoists.
05. Lubrication
06. Bearings
Ball & roller antifriction bearings of reputed make shall only be used,
with minimum bearing life as per IS: 3938.
07. Brakes
08. The Electric hoists shall be inspected as per IS: 3938 - 1983 and as
specified in GCC.
08-C-04 DOCUMENTATION
01 General
Item number :
Location :
Capacity :
Duty classification :
Total weight of hoist :
Make :
02 Hoist
Speeds with safe working load :
Lifting height :
a) Above floor level :
b) Below floor level :
Wire ropes
a) Type of construction :
b) Size :
c) Number of falls :
d) Factor of safety :
Rope drum :
a) Materials :
b) Diameter :
Drives
a) Type & material of gear box :
b) Gear & pinion :
c) Material & hardness :
Motors
a) Type & number :
b) Kw rating :
c) Synchronous speed :
d) Class of insulation :
e) Pull out torque :
f) Frame size :
Brakes :
a) Type :
b) Size :
c) Torque rating :
Type & details of limit switches :
Type of couplings :
Type of bearings :
Lifting hook
a) Type :
b) Material :
Type & details of control :
03 Trolley
Speed with safe working load :
Wheels
a) Numbers :
b) Diameter :
c) Material & hardness :
d) Max. wheel load :
e) Wheel base :
Drive
a) Type & material of gear box :
b) Gears & pinions :
c) Material & hardness :
d) Kw rating :
e) Synchronous speed :
f) Class of insulation :
g) Pull out torque :
i) Frame size :
Brakes
a) Type :
b) Size :
c) Torque rating :
01. The Crane Structure shall be designed in accordance with IS: 807-
1976 for the jib column and jib arm of the crane. The details of the
crane structure indicated in the Single Girder EOT/US Crane part of the
TS shall be followed.
02. The components of electric hoist for the jib crane and the slew drive
shall be designed, manufactured, assembled and tested in accordance
with IS:3938-1983 and shall be of standard make. The details of the
electric hoist indicated in the electric hoist part of the TS (Clause
8C.00) shall be followed.
04. The Structural steel work of the jib crane structure shall conform to IS;
2062-1992.
05. The boom of the jib crane shall be from either rolled steel section of
fabricated type.
06. The design of the boom shall be such that the vertical deflection
caused by the maximum rated load with the hoist at the maximum jib
radius position on the boom, shall not exceed 1/250 of the boom
length.
07. The column of the jib crane shall be of heavy duty steel tube or
fabricated / lattice structure. Proper bearing housing block for housing
bearing for supporting the boom shall be provided at the top.
08. The jib arm support bearing shall be of anti friction ball/ roller bearing.
09. Base plate of the column should be provided with drilling holes of
appropriate sizes for fixing the jib crane on the foundation / support.
10. The foundation bolts will be so designed that 50 percent of the bolts
provided will be able to take the full load of the jib crane and the turning
moments.
11. The design of the column of the jib crane shall be such that overall
deflection of the jib does not exceed 1/200 of (boom length, column
height) when the jib crane is fully loaded.
12. The connection between the boom and the pillar shall be designed
suitably to give proper end fixing to the boom and to ensure that the
play between moving members is kept to the minimum.
13. All electrical cables shall be so laid that they are not liable to be
damaged and can be easily inspected and tested.
14. Horizontal guide rollers for swivelling motion shall be C55Mn75 with a
minimum hardness of 300 BHN.
08-D-04 Documentation
08-D-05 Questionnaire
08-E-01 The scope of work of the Tenderer shall consist of design, manufacture,
The bridge shall consist of main girder which shall be of steel section
and with an auxiliary structure where necessary. Girder shall be
sufficiently strong and rigid to withstand the most severe combination
of loads that may develop under different working conditions.
The bridge shall not deflect more than 1/900 of span with safe working
load on the trolley, with trolley stationed at mid span and excluding
deflection due to dead load. There shall be no permanent set when
the crane is loaded with 1.25 times the safe working load.
The Manual Hoist and the traverse mechanism shall be as per the
details indicated below under clause 15-F.
08-E-03 DOCUMENTATION
The Tenderer shall submit the following technical drawings & technical
data/ information with tender for manual hoist with traveling trolley,
without which the tender shall be considered as incomplete & may not
be considered for acceptance.
08-E-04 Questionnaire
1. Equipment No. :
2. Capacity :
3. Quantity :
4. Height of Lift :
5. Travel distance
6. Class of Duty :
7. Make :
8. Minm . Radius of Curvature
Of Track beam size: :
9. Max. Trctive effort (Kgs)
Hoist :
Cross Travel
Long Travel :
10. Movement in ‘m’
corresponding to operating
chain movement of 30m.
Hoist :
Travel
The Chain Pulley Block shall conform to class-I duty as per IS: 3832-
1986.
Pulley used for the operating mechanism shall have suitable guards to
prevent the operating chain from coming out.
08-F-03 DOCUMENTATION
The Tenderer shall submit the following technical drawings & technical
data/ information with tender for manual hoist with traveling trolley,
without which the tender shall be considered as incomplete & may not
be considered for acceptance.
08-F-04 Questionnaire
1. Equipment No. :
2. Capacity :
3. Quantity :
4. Height of Lift :
5. Class of Duty :
6. Make :
7. Minm. Radius of Curvature
Of Track beam size:
8. Max. Tractive effort (Kgs)
Hoist :
Travel :
9. Movement in ‘m’
corresponding to operating
chain movement of 30m.
Hoist :
Travel
Belt vulcanizing machines for belt splice of various widths (as indicated
in data sheets) shall be supplied. The machine shall be easy to handle
type. Heating element for Hot Belt Vulcanizing Machines shall be
preferably of flexible type. The equipment shall be suitable for
vulcanizing of entire splice width in single setting. It shall be capable of
applying uniform pressure over splice by pneumatic or hydraulic
means.
e) Two Nos. of belt gripping devices (one for old and one for
new belt) including fasteners & necessary rope fixing
arrangement shall be provided. One spare gripping
device meant for spare belt shall also be provided.
09-B-03 DOCUMENTATION
b) Operating weight
c) Filled up Questionnaire
b) Supplier's name for components & catalogues for these items shall be
furnished.
e) List of tools and tackles to be supplied with the plant and equipment.
09-B-04 Questionnaire
Technical Parameters:
The scope of the tender shall be deemed to include all such items which
although are not specifically mentioned in the specification, but are
needed to make the equipment complete in all respect for it’s safe,
reliable, efficient and trouble free operation.
2. The scope of supply and services of the Tenderer shall include the
following:
a) Mechanical
- Design capacity shall be considered as 120% of rated capacity
- Each equipment shall be complete in all respect including, its
drive units, cables, safety switches, hoods, sealing
materials, structural, mechanical and other standard
accessories including feed and discharge chutes with
specified liners, dust hood etc..
- Provision o f n ece ssa ry f i x t u r e s , s u p p o r t i n g a n g l e s
a n d b r a cke t s r e q u i r e d f o r mounting and supporting the
equipment & drive with floor / bins.
3. All fixing bolts and nuts including foundation bolts shall be included
in the scope of supply of Tenderer.
1. General
c) The tenderer shall offer the linear motion screen with the direct force
exciter (DFE) until and unless the requirement changes due to specific
technical reasons. The motion to DFE shall b e i mp a r t e d t h r o u g h
c a r d o n -shaft. Other t y p e o f scr ee ns s h a l l b e sp e ci fi call y
mentioned in the data sheet. The tenderer may also offer unbalanced
motor type screen where the unbalance motors are directly mounted
on the screen frame.
e) The screen deck shall be provided with side liners upto a height
50mm more than material depth.
10.02 DOCUMENTATION
f) G.A. drgs for the equipment/ system including sections and details
giving relevant information, binding dimension, loads for designing
civil/structural works etc.
j. Detail drawing and specifications of all wearing out parts and parts
subject to breakage during normal operating conditions.
10.03 QUESTIONNAIRE
4. Type of screen :
GS 06 -Rev-1, Sept-2016 Material Handling & Hoisting Page 127of 184
© 2016 MECON Limited All rights reserved
GENERAL TECHNICAL SPECIFICATION FOR
6. Capacity through
:
7. Separation size
:
17. Duty
18. Special features if
any
26. Bearing
Make
: Expected life (hrs)
:
11. The travelling tripper shall consist of belt scrapper with adjustable
rubber strip, rubber lagged head and bend pulleys complete with
shaft bearings, chutes, stops and limit switches, brakes etc. The
tripper shall have two-way discharge chute or three way chute with
flap gate as per application which shall be capable of discharging
material into the bunker openings.
13. Vertical and horizontal guide rollers shall be provided to control sway
and uplift of the belt in unloaded condition. The tripper shall run on
standard flat bottom Indian Rails at least of CR 60. Wheels shall be
double flanged with parallel tread running on anti-friction bearings
and shall have min hardness of 350 BHN. Material of wheel shall
be forged steel / cast steel.
14. Travelling trippers shall be equipped with manually operated rail clamps
and rail cleaners and jacking pads.
15. Diverter gates on two way or three way chutes shall be electrically
operated.
16. Power supply to the tripper shall be given through motorized cable
reeling drum with trailing cables, cable trays for resting the trailing
cables and end limit switches for protection against over travel of
GS 06 -Rev-1, Sept-2016 Material Handling & Hoisting Page 131of 184
© 2016 MECON Limited All rights reserved
GENERAL TECHNICAL SPECIFICATION FOR
the tripper. The cable reeling drum and trailing cable of each tripper
shall be suitable for the entire length of the bunker bay. The cables
shall have copper conductors, proper insulating material and braided
armouring in accordance with IS: 691.
18. All stipulation regarding belt pulley, belt scraper, idlers, safety
guards, wind guard, access for maintenance etc. specified for belt
conveyors, diverter gates and discharge chutes shall be applicable for
the travelling tripper.
19. The rating of tripper travel motor shall be adequate to move the tripper
smoothly either in forward or opposite direction to belt direction
under fully loaded conditions. Coefficient of friction shall be taken as
maximum 0.15.
20. Minimum two drive axles shall be provided for tripper travel.
Arrangement shall be provided at the starting point of the tripper to
avoid folding of belt.
21. Provision shall be kept for automatic tripping of bunker bay conveyor in
event of travelling tripper getting dragged (.i.e. travel speed in excess
of rated speed).
22. The supporting structures for the rails with necessary end stops
shall also be supplied under this specification. Suitable belt hold
down guide pulley shall be provided over the concave curve of belt
over tripper.
23. Suitable bunker sealing arrangement with conveyor belting shall keep
the bunkers sealed and prevent dust emission.
26. Suitable dust cover shall be provided over tripper head pulley.
Serrated rubber seal shall be provided at open side to prevent dust
nuisance. Suitable dust tight access doors shall be provided. Counter
GS 06 -Rev-1, Sept-2016 Material Handling & Hoisting Page 132of 184
© 2016 MECON Limited All rights reserved
GENERAL TECHNICAL SPECIFICATION FOR
weighted type belt cleaner shall be provided below the tripper head
pulley to cleaning the carrying side of the belt.
28. Continuous deck plates shall be provided below carrying idlers on the
trippers.
11.02 DOCUMENTATION
a) For approval:
i. Constructional feature.
v. Speeds.
d) Tripper Details
e) Sealing details :
g) Drive details
i. Motors
a. KW rating
:
b. RPM
:
c. Type
:
d. Bearing
Make
:
Expected life
(hrs) :
iii. Couplings
a. Make and type of high
:
speed couplings
b. Make and type of low
speed couplings
c. Weight (kg)
:
b) Electricals
3. The control panel for all functions & controls for ILMS shall be
supplied with adequate no. of I/Os for integrating with system PLC &
sufficient length of cables for monitoring the panel at suitable place
on the wall / floor of building.
4. All fixing bolts and nuts including foundation bolts shall be included in
the scope of supply of Tenderer.
5. Two years maintenance spares.
1. General
c) Equipment Specification
For ILMS, the motor and the gear reduction unit for
driving the in-line belt shall be adequate sized with
minimum 20% margin to avoid any over loading during
operation. Suitable zero speed switch shall be provided. No
Chain/belt drives shall be accepted.
- MS Bolt ‘L’ = 5 X
Diameter.
2.02 DOCUMENTATION
b) Suspension device :
f) Mounting height :
j) Control
m) MOC of coil
p) MOC of diaphragm
q) MOC of idler
1. SCOPE OF WORK
b) Electricals
4. All fixing bolts and nuts including foundation bolts shall be included
in the scope of supply of Tenderer.
2. TECHNICAL SPECIFICATION
2. Equipment Specification
3. Construction Requirement
3. DOCUMENTATION
and equipment.
equipment.
equipment.
4. Questionnaire
1. SCOPE OF WORK
2. The scope of supply and services of the Tenderer shall include the
following:
3. Mechanical
2. TECHNICAL SPECIFICATION
3. DOCUMENTATION
c) Details of load cell such as type, rating, make and other details
4. QUESTIONNAIRE
8. Weighing range.
9. Control circuit diagram.
10. Response time, repeatability
xvi. Accuracy
xvii. Hysteresis
xviii. Linear error
GS 06 -Rev-1, Sept-2016 Material Handling & Hoisting Page 152of 184
© 2016 MECON Limited All rights reserved
GENERAL TECHNICAL SPECIFICATION FOR
1. SCOPE OF WORK
2. TECHNICAL SPECIFICATION
1. Mechanical Details
f) The motor for the elevator shall be squirrel cage induction motor
with VVVF control for controlling the speed during starting and
stopping at landings
1. Wire Rope
2. Car
a) Car frame
b) Car enclosure
c) Car platform
d) Car roof
e) Car Door
Hangers and tracks for car door and each having a clear
hoist way door shall be provided. Suitable material shall be
used to minimize the noise. Ball bearing rollers or
equivalent arrangement shall be provided to take upward
thrust of the doors. Suitable devices shall be provided for
transmitting from one door panel to the other.
The car and hoist way doors shall open automatically in case
of any obstruction in closing the doors.
5. Emergency Exit
6. Terminal Buffers
The terminal buffers shall be provided for stopping the car and
the counter weight at the extreme ends of travel. All structural
steel members required to install the buffers shall be supplied
by the lift supplier.
a) Load test with 100% and 110% of rated load as per IS: 14665
– 2000 Part 5.
b) A static load test with 125% of rated load as per IS: 14665 –
2000 Part 5 to check that the brake will sustain the car.
c) All other tests on electrical system as mentioned in IS: 14665 –
2000 Part 5
d) Any other test felt necessary by Owner and supplier to
ensure proper functioning and installation of the lift.
e) Demonstration of the functioning of all safety provisions
made available in the elevator.
3. DOCUMENTATION
4. QUESTIONNAIRE
i. Mechanical component :
ii. Structural item :
iii. Others :
15. Headroom above top landing :
16. Elevator operation :
17. Method of control : Selective
collective
automatic control
as per clause no.
3.41.3 of IS: 14665
(Part 2/Sec1): 2000
with or without
attendant. The control panel
shall be located in the
machine room. (VVVF
control with pulse width
modulation)
18. Ambient temperature : 50o C
19. Quantity of Motor :
20. Power consumption :
21. Leveling accuracy :
22. Emergency power supply :
23. Intercommunication :
24. Electric power supply :
i. Power Voltage :
ii. (AC) Phase :
iii. Cycles :
iv. Wire system :
v. Control voltage (DC) : 415 V ±10%, 3 ph 50 Hz
±5% AC.
: vi. FL amperes
: vii. Class of insulation
:
viii.No. of permissible starts per hour :
• Special Feature :
16 VIBRATING HOPPERS
SCOPE OF WORK
The scope of the tender shall be deemed to include all such items which
although are not specifically mentioned in the specification, but are
needed to make the equipment complete in all respect for it’s safe,
reliable, efficient and trouble free operation.
9. The scope of supply and services of the Tenderer shall include the
following:
c) Mechanical
- Each equipment shall be complete in all respect including, its
Unbalance Motor units, cables, safety switches, structural
hoppers with liners, gates, support/suspension structures,
mechanical and other standard accessories including feed
and discharge chutes with specified liners, dust hood etc..
- Provision o f n ece ssa ry f i x t u r e s , s u p p o r t i n g a n g l e s
a n d b r a cke t s r e q u i r e d f o r mounting and supporting the
equipment & drive with floor / bins.
10. All fixing bolts and nuts including foundation bolts shall be included
in the scope of supply of Tenderer.
TECHNICAL SPECIFICATION
1. General
a) The vibrating hopper shall be placed below the iron ore fines/ slime silos
above the belt weigh feeders to ensure steady flow of sticky iron fines to
the weigh feeders. These shall also be provided in other areas where
belt weigh feeders are provided. The vibrating hopper shall be designed
to ensure mass flow of materials.
b) A Rack & Pinion gate shall be provided at the mouth to isolate the weigh
DOCUMENTATION
u. Detail drawing and specifications of all wearing out parts and parts
subject to breakage during normal operating conditions.
QUESTIONNAIRE
i. Place of installation
ix. Motor kW
x. Duty
1. General
a) The belt weigh feeder shall be placed be below bins, hoppers, silos. The
belt weigh feeder shall consist of shut off gate, in feed chute with liners,
full length skirt board with dust cover, tail pulleys with screw take up
arrangement, head pulleys , snub pulleys, Plummer blocks, deck plates,
internal & external scrappers, idler, belting ,load cells, belt speed
sensors, discharge hood & chute with liners, Dust control system, drive
system consisting of VFD motor, gearboxes, couplings etc, supporting
structures, foundation bolts, belt changing beams etc.
b) A shut off gate shall be provided at the in feed chute to isolate the weigh
feeder during it’s maintenance.
c) For different components of the belt weigh feeder, the conveyor portion
of GTS shall be referred.
d) The skirting shall be for full length of the belt. The skirt height shall be
minimum 200mm higher than the material height at design capacity. For
skirt rubber, skirt liner conveyor specification shall be referred.
e) The minimum belt designation shall be 315/3 NN, M-24 grade. The
minimum top & bottom cover thickness shall be 5mm & 2 mm.
f) The minimum idler diameter shall be 88.9mm & shell thickness 4.5mm.
g) Machined idler shall be considered in the weighing area.
h) Minimum pulley diameter shall be 315 mm & thickness shall be 12 mm
for drive pulley & 10 mm for other pulleys. The lagging shall be as per
conveyor GTS.
i) Each feeder shall provided with double load cells. Load cells shall be
provided with calibration weights.
j) The design capacity shall be 120% of rated capacity. The belt speed
shall be 0.3m/s (variable). The variation of speed shall be from 20% to
120% & accuracy of system shall be minm. +/- 0.25%.
k) The whole belt weigh feeder shall mounted on a frame which shall be
bolted on floor at four corners.
l) The belt weigh feeder shall be working in tandem with the vibrating
hopper installed below silo. The belt weigh feeder shall be designed
suitable for the discharge from the vibrating hopper.
m) The drive shall consist of conventional separate motor nad gearbox with
coupling. Geared motor shall not be used.
11.04 DOCUMENTATION
a) General arrangement drawing of the belt weigh feeders & other drawings
in line with conveyor portion of list of drawings.
j. Detail drawing and specifications of all wearing out parts and parts
subject to breakage during normal operating conditions.
11.05 QUESTIONNAIRE
xiv. Motor kW
xv. Duty
1. General
Raw materials after being discharged from conveyor shall fall into the
respective bunkers through charging hatches. When material is
discharged at any section of the inclined removable slide plate by a
shuttle belt conveyor, the pressure generated by the falling material
shall be able to push the respective curtain plates to make the required
opening for being fed to bunker.
The flaps of charging hatch, normally closed, shall open under dead
weight of material and close of its own under gravity after the materials
falls into bunker. Thus the dust emitted by falling material is hermetically
sealed.
The charging hatch assembly shall rest on the Insert Plates provided in
GS 06 -Rev-1, Sept-2016 Material Handling & Hoisting Page 175of 184
© 2016 MECON Limited All rights reserved
GENERAL TECHNICAL SPECIFICATION FOR
3. DOCUMENTATION
j. Detail drawing and specifications of all wearing out parts and parts
subject to breakage during normal operating conditions.
0 QUESTIONNAIRE
xx. Duty:
19 Samplers
1. General
20 DOCUMENTATION
Detail drawing and specifications of all wearing out parts and parts
subject to breakage during normal operating conditions.
21 QUESTIONNAIRE
xxiii. Duty:
1. General
a) It shall consists of a manual winch (with 60m of wire rope for threading
the old belt to the empty reel), spring loaded cable reeling drum (with 60
m of power cable), individual drive assemblies for rotating an “Empty
reel” (for pulling the old belt out of the conveyor system and winding the
same on the reel) and a “Loaded belt reel” (to un-wind new belt out of
GS 06 -Rev-1, Sept-2016 Material Handling & Hoisting Page 181of 184
© 2016 MECON Limited All rights reserved
GENERAL TECHNICAL SPECIFICATION FOR
b) The drives for “Empty reel” and “Loaded belt reel” shall have hydraulic
motors with suitable gearbox and power pack mounted on the base.
Adequate pulling force as per the requirement or 20t (whichever is
more) shall be considered.
d) Two Nos. of belt gripping devices (one for old and one for new belt)
including fasteners & necessary rope fixing arrangement shall be
provided. It shall be made of Aluminium alloy and shall be mounted on
self-locking chuck to ensure safety of operator. One spare gripping
device meant for spare belt shall also be provided.
3. DOCUMENTATION
Detail drawing and specifications of all wearing out parts and parts
subject to breakage during normal operating conditions.
4. QUESTIONNAIRE
i. Place of installation
ii. Quantity envisaged
iii. Maximum Belt Width Considered
iv. Maximum belt length considered
v. Mobile equipment details