Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Lab Test Report

Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

dG

DivineMeta[[w gi c a[ Serai ce s Put. LtD.


ACcREDITEO By NABL - ISO/lEC 17025 : 2017
14, Gopal lndustrial Estatq
Opp. \f.llabhnagar, Odhay
l. 079-22E91013, 228928U, 9227220997
El dMrrl.b-ihpeftdfrrn.ll.ron
#@ ,-t
"",iiN TC-5098
Ahmedabad-3E2 415. O ww{.dlvirEl.bootory.com Mschanlcal T6Btlng
Report No : T1833
ULR No. : TC509820000002907F Date: 1610112020
o,
Howe Engineering Projects (ndia) Pvt.Ltd.
ACH-2(Howe Office Building) at
Shantivan Township Near Vaishnodevi Circle,SG Highway,Ahmedaba+3gz421
Test sile
Test Method EN 10002-1
Test Performance At Divine lvletallurgical Services P. Ltd. - Ahmedabad

lnstrument Used Fie Make Universal Testing N4achine, UTE-40(DLS-30), Due Date of Catibration .16.04.2020

Customer Ref No. Ref.No. :CCPL,Date 1 0.01.2020


Condition of Sample 600mm X 300mm Aluminum Roof Sheet
Nature Of Sample Test Piece of Aluminum Roof Sheet Stamped as: -
Specification EN 10204 Al Alloy 3003(H'16)

Date Of Testing 1610112020 Sample Drawn By : Party

I
Project Name:CCPL-Mundra

Section Dimension (in mm) 24-widthx0.49 thk


Area (in mm'z)

Gauge Length (in mm)


't't.750
19.000
II
II
Final Gauge Lenqth (in mm)

Yield Load (in kN)


20.920

2.340
II
IT
Ultimate Load (in kN)
0.2% Yield Stress (in N/mm'.)
2.480
198.980
II
II
UTS (in N/mm')
Elongation (in %)
210.884
10.10s
II
II
Location of Fracture

Remarks
W.G.L
II
Witnessed By/ N.B
Tested By : Authorized Signatory
(Under NABL)
Condition Of Reporting
1. Sample must be drawn by the party. The result relate only to the sampte submitted by the pafty.
2. Any parl or pads of the Test Report shall not be resproduced. for this , the wdtten request to DLS is mandatory for the Customer
3. Samples are store for fifleen days from the date of receipt.
d LE
DiaineMeta[[ur gi c a[ Serai ce s Put. LtD.
ACCREDITED By NABL - ISO/IEC 17025 : 2017
14, Gopal lndunrial Estate,
Opp. Vallabhnagai odhav,
Ahmedabad-382 415.
L
El
O
079-22891013, 228924U, 9227220991
dMn l.b_nhpendrftnall.com
wyw.dtuinehbor.to.y..om
x@ TC-5098
il€chanlcal Testlng
Report No: T1834
ULR No. : TC5098200000029'l0F Date : 1610112020
To,
Howe Engineering Projecls (lndia) Pvt.Ltd.
ACH-2(Howe Office Building) at
Shantivan Township Near Vaishnodevi Circle,SG Highway,Ahmedabad382421
Test ens
Test Method: EN 10002-1

Test Performance Al Divine Metallurgical Services P Ltd. -Ahmedabad

lnstrument Used Fie Make Universal Testing Machine, UTE-40(DLS-30), Due Date of Calibration 16.04.2020

Customer Ref No. Ref .No. :CCPL, Datel 0.01.2020

Condition of Sample 200mmx250mm Aluminum Roof Sheet


Nature Of Sample Test Piece of Aluminum Roof Sheet Stamped as: -

Speciflcation EN 10204 Al Alloy 3003(H16)

Date Of Testing 't6to1t2020 Sample Drawn By : Party

II
Project Na me:C C P L- l\4 u nd ra

Section Dimension (in mm) 20.06-widthx0.5 thk


Area (in mmz)
Gauge Length (jn mm)
10.030
r8.000
II
II
Final Gauge Length (in mm)

Yield Load (in kN)


19.700

1.980
II
II
Ultimate Load (in kN)

0.2% Yield Stress (in Nimm'.)


2.100
197.408
IT
II
UTS (in N/mm')
Elongation (in %)
209.372
9.444
II
II
Location of Fracture

Remarks
W.G.L
II]
VMtnessed Byl N.B. :

Tested Bv: a-\ Authorized SIgnatory


runa".Nnerr, tUr2*L
bonaitlon oi nepoYng : -l-
1. Sample musl be drawn by lhe party. The result relate only to the sample submitted by the party.
2. Any parl or parts of the Test Reporl shall not be resproduced. for this , the written rcquest to DLS is mandalory for the Customer
3. Samples are store for fifle€n days lrom the date of receipt.

F.\
G,M.

o
DiaineMeta[tur gi c al Sevvi ce s Put. LtD.
diq ACCREDITED By NABL- ISO/IEC 17025:2017
14, Gopal tndustria I Esate,
Opp. \bllabhnagar, Odhav,
Ahmedabad-382 415,
L
El
O
o79-22E91013, 22a92AU, 922722893
dMlEl.b_nhperldlffirl.ll.com
Es*.dlvlncLbontory.com
#@ TC-5098
]{ochanlcal Testlng
Report No: T1835
ULR No. : TC509820000002912F Date : 1610112020
o,
Howe Engineering Projects (lndia) Pvt.Ltd
ACH-2(Howe Office Building) at
Shantivan Township Near Vaishnodevi Circle,SG Hi hway,Ahmedabad382421
Test : ens ile

Test Method: EN 10002-1


Test Performance At: Divine l\.4etallurgical Services P. Ltd. - Ahmedabad

lnstrument Used MCS Make Universal Testing Machine, UTE-150(DLS-42)Ton,Due Date of Calibrated 09.07.2020

Customer Ref No Ref No. :CCPL, Date'l 0.01.2O2O


.

Condition of Sample 500mm Long Support Leg(40mm Pipe)


Nature Of Sample Test Piece of Suppoert Leg Stamped as: -
Specification EN AW-6063-T66

Date Of Testing : 't6to1t2020 Sample Drawn By : Party


Project Name:CCPL-N4undra

Min Max
Section Dimension (in mm) 42.06-ODX2.96 THK
Area (in mm'1)
Gauge Length (in mm)
363.742

50.000
II
II
FinalGauge Length (in mm)
Yield Load (in kN)
57.700
9't.2s0
II
II
Ultimate Load (in kN)
0.2% Yield Stress (in N/mm'1)
100.950

250.865
II200.000
UTS (in N/mm') 277.533 245.000
Elongation (in %) 15.400 8.000
Location of Fracture

Remarks:
W.G.L
The Result meets the Requirement of EN AW-6063-T66
II
YMtnessed By/ N.B
Tested 8y

(Under NABL):
Condition Of
A**t
aM,nc,:
Authorized Signatory

1. Sample must be drawn by the party. The result reiate only to the sample submitted by lhe party.
2. Any pa or pa s of the Test Report shall nol be resproduced. for this , the written request to OLS is mandatory for the Customer.
3. Samples are store for fifleen days from lhe date of receipt.
diq
Divinelrrreta[[ur gi c a[ Serai
ACCREDITED By NABL - lSO/lEC 17025 : 2017
14, Gopal lndustrial Estate,
Opp. \hllabhnagar, Odhav,
ce s Put. LtD.
l. 079-22891013, 22892804, 922722G83
el dM l.b_ntpeEdKrn ll.conl
#@
z"i,nN ,-t
TC-5098
Ahmedabad-3E2 415. a wsr.dMn Lbor.to.y.com Mschanlcal Testing
Report No: T1836
ULR No. : TC509820000002913F Date : 1610112020
o,
Howe Engineering Projects (lndia) Pvt.Ltd.
ACH-2(Howe Office Building) at
Shantivan Township Near Vaishnodevi Circle,SG Highway,Ahmedaba+382421
Test nsile
Test Method: EN 10002-1

Test Performance At: Divine Metallurgical Services P Ltd. - Ahmedabad

lnstrument Used Fie N.4ake Universal Testing Machine, UTE-40(DLS-30), Due Date of Calibration 16.04.2020

Customer Ref No Ref.No.:CCPL,Date10.O1.2020


Condition of Sample 500mm Long Support Bracket
Nature Of Sample Test Piece of Suppoe Bracket Stamped as
Specific€tion EN AW-6063-T66

Date Of Testing 16t01t2020 Sample Drawn By : Party


Project Name:CCPL-Mundra

Min Max
Section Dimension (in mm) 20.36-widthx'1.94 thk
Area (in mmz)

Gauge Length (in mm)


39.498
35.000
II
II
Final Gauge Length (in mm) 40_460
II
II
rI
Yield Load (in kN) 9.500
Ultimate Load (in kN) ,10.600

0.2% Yield Stress (in N/mm'z)


UTS (in N/mm'z)
240.518
268.365
200.000
245.000
II
Elongation (in %)

Location of Fraclure
,5.600
W.G.L
rI
8.000
I
Remarks The Result meets the Requirement of EN AW-6063-T66
Witnessed By/ N.B
Tested By : Authorized Signatory
(Under NABL)l
Condition Of Re ng
=zz-
1. Sample musl be drawn by the party. The result relate only to the sampte submitted bylhe party.
2. Any part or parls of the Tesl Report shallnot be resproduced. for this, the written request to OLS is mandatory for the Customer
3. Samples are store for ifleen days frcm the date ot receipt.
d tE
DivineMeta[[w gi c a[ Seyvi ce s Put. LtD.
ACCREDITED By NABL - ISO/IEC 17025:2017
14. Gopal lndunrial Estate,
Opp. \/allabh nagar, Odhay
Ahmedabad-382 415.
L
E
O
079-22E91013, 22E92W, 9227229993
dMrEl.b-nhperedttfrn ll.com
w*w.dlvla€lrboaatory.com
x@ TC-5098
Mechanical Testing
Report No: T1837
ULR No. : TC509820000002914F Date : 1610112020

Howe Engineering Projects (lndia) Pvt.Ltd


ACH-2(Howe Office Building) at
Shantivan Township Near Vaishnodevi Circle,SG Highwa ,Ahmedabad382421
Test lensile
Test Method: EN 10002-1
Test Performance At: Divine l\4etallurgical Services P. Ltd. - Ahmedabad

lnstrument Used: Fie Make Universal Testing l\,lachine, UTE-40(DLS-30), Due Date of Calibration 16.04.2020

Cuslomer Ref No Ref . No. :CCPL, Date 1 O.O'1.2020


Condition of Sample 200mm Long Support Bracket
Nature Of Sample Tes Piece of Support Bracket Stamped as
Specification EN AW-6063-T65

Date Of Testing 06t01t2020 Sample Drawn By : Party


Project Name:CCPL-Mundra

Min Max
Section Dimension (in mm) 19.9-widthx2.93 thk
Area (in mm')
Gauge Length (in mm)
58.307
43.000
II II
Final Gauge Length (in mm)
Yield Load (in kN)
49.500
8.8s9
II I
rI
Ultimate Load (in kN)

0.2% Yield Stress (in N/mm1


18.000
t51.954
I200.000
I
UTS (in N/mm')
Elongation (in %)
308.711
't 5.116
245.000
8.000
Ir
Location of Fracture

Remarks
W.G,L
The Result does not meet the Requirement of EN AW-6063-T66
II
Wtnessed By/ N.B
Tested By Authorized Signatory
(Under NABL):
Condition Of
.zr.-
1. Sample must be drawn by the party. The result relate only to the sample submitted by lhe party.
2 Any part or parts oftheTesl Report shallnot be rcsproduced. for lhis, the written request to DLS is mandatory for the Customer-
3. Samples arc store lor fiteen days from the date of receipl.

G.l,'l
s
DivineMeta[[ur gi c al Serai ce s p at. Ltb.
die ACcREDITEo By NABL - ISO/lEC 17025 : 20l7
14. Gopal lndustrial Estate,
Opp. \allabhnagar, Odhav
Ahmedabad-3E2 415.
L
E
O
079-22891013, 22892aU, 9227220993
dMrtl.b_nhpondlftmell.con
ww*.dlvin.hboatory..om
#@ TC-5098
Mechanlcal Tostlng
Report No: T1838
ULR No. : TC509820000002915F Date : 1610112020
o,
Howe Engineering Projects (lndia) Pvt.Ltd.
ACH-2(Howe Office Building) at
Shantivan Township Near Vaishnodevi Circle,SG Highway,Ahmedaba+382421
Test ns
Test Method: ASTM E8-,I6A
Test Performance At: Divine Nletallurgical Services P Ltd. - Ahmedabad

lnslrument Used: Fie Make UniversalTe sting l\4achine, UTE-40(DLS-30), Due Date of Catibration 16.04.2020

Customer Ref No Ref.No.:CCPL, Date 1O.O1 .2020


Condition of Sample 250mm Long Support Bracket
Nature Of Sample Test Piece of Support Bracket Stamped as: -
Specification EN AW-6063-T66

Date Of Testing 16101t2020 Sample Drawn By : Party


Project Name:CCPL-Mundra

Min Max
Section Dimension (in mm) 19.96-widthx1.95 thk
Area (in mm'?)
Gauge Length (in mm)
38.922
35.000
II
II
Final Gauge Length (in mm)
Yield Load (in kN)
40.r00
9.299
II
II
Ultimate Load (in kN)

0.2% Yield Stress (in N/mm')


10.200
238.939
IT200.000
II
UTS (in N/mm'z)
Elongation (in %)
Location of Fracture
262.063
't4.571
W.G.L
II
245.000
8.000
r
Remarks: The Result meets the Requirement of EN AW-6063-T66
Wtnessed By/ N.B
Tested By

(l.Jnder NABL): A**


Condition Of n"a\o#ng,
=:-
Authorized SIgnatory

1. Sample musl be drawn by ihe pa.V. The result relate only to the sample submitted bythe party.
2. Any part or parts of the Test Reporl shall not be resproduced. for this , the written request to DLS is mandatory for the Cuslomer
3. Samples are store for fifteen days from lhe date of receipt.
d LE
2 DivineMeta[tur gi c a[ Serai ce s Put. Ltd.
ACCREDITEO By NABL - lSO/lEC 17025 : 2017
14, Gopal lnd ustrial Estate,
Opp. Vallabhnagar, OdhaV
Ahmedabad-382 415.
L
el
rt
079-2289108, 228928U, 9227220993
dMEl.b_nhpeEdlftn ll.com
wru.dlviEhbonrory.com
x@ TC-5098
ilechanlcal Testing
Report No : T1839
ULR No. : TC509820000002916F Date: 1610112020
o,
Howe Engineering Projects (lndia) Pvt.Ltd.
ACH-2(Howe Office Building) at
Shantivan Township Near Vaishnodevi Circle,SG Highway,Ahmedaba+382421
Test ensi e
Test Method: ASTM E8-16a
Test Performance At: Divine Metallurgical Services P Ltd. - Ahmedabad

lnstrument Used Fie lvlake Universal Testing Machine, UTE-40(DLS-30), Due Date of Calibration '16.04.2020

Customer Ref No Ref.No.:CCPL,Date10.0'1.2020


Condition of Sample 280mm Long Roof Drain Pipe
Nature Of Sample Test Piece of roof Drain Pipe Stamped as
Speciflcation EN AW-6063-T66

Date OfTesting 16tO1nO20 Sample Drawn By : Party


Project Name:CCPL-Mundra
s.No.1 s.No.2 Min Max
Section Dimension (in mm) 9.98-OOX8.06 rD 9.98-OOX8.06 THK
Area (in mm'z)
Gauge Length (in mm)
27.215 27.215
II]
IIi
rI
29.000 29.000
Final Gauge Length (in mm) 33.660 34.360
Yield Load (in kN)

Ultimate Load (in kN)


5.060
5.900
5.000
5.960
II]
II
0.2% Yield Skess (in Nimm') 185.930 183.725 200.000
I
UTS (in N/mm')
Elongation (in %)
216.795
16.069
2't9.000
18.483
245.000
8.000
II
Location of Fracture

Remarks
WG.L W.G.L
fhe Result does not meet the Requirement of EN AW-6063-T66
I
Wtnessed By/ N.B
Tested By Authodzed Signatory
(Under NABL)
Condition Of
z>)
1. Sample must be drawn by the party. The result aelate only to the sampte submitted by the party.
2. Any part or parts ot the Test Report shall not be resproduced. for lhis , lhe wrilten request to DLS is mandatory for the Customer
3. Samples are slore fo. fiiteen days from the date of rec€ipl.

G,M
DivineMeta[[w gi c al Seyai ce s put. LtD.
dh ACCREDITED By NABL- ISO/IEC '1702s:2017
l4copal l.dustrial Estate, L 079-22E91013, 22a92804, 9227220993
Opp. \/allabhnagar, Odhav, Et irMn l.b_ihponiflrn l.com
Ahmedabad-382415, O eww.dlvlncLbor.rory.com
x@ TC-5098
Mechanlcal Testing
Report No : T1840
ULR No. : TC509820000002917F Date : 1610112020
o,
Howe Engineering Projects (lndia) Pvt.Ltd.
ACH-2(Howe Office Building) at
Shantivan Township Near Vaishnodevi Circle,SG Highway,Ahmedaba+382421
Test ensi
Test Method: lS 1367 (Part-14)
Test Performance Al: Divine Metallurgical Services P Ltd. - Ahmedabad
lnstrument Used FIE lvlake UniversalTesting Machine,UTE-60(DLS-22) Due Date of Catibration:07.05.2020

Customer Ref No Ref.No.:CCPL,Date10.O1.2020


Condition of Sample MBx2smm Long Connection Bolt
Nature Of Sample Test Piece of Cnnection Bolt Stamped as: -
Specification lS 1367 (Part-14) GR.42-70
Date Of Tesling 16t0112020 Sample Drawn By : Party
Projecl Name: CCPL-l\4undra
s.No.1 s.No.2 s.No.3 s.No.4 Min Max
Section Dimension (in mm) M8 M8 M8 M8
Area (in mm'z)
Gauge Length (in mm)
36.600
25.000
36.600
25.100
36.600
25.080
36.600
25.100
II
II
Final Gauge Length (in mm)

Yield Load (in kN)


28.300
26.560
28.620
24.820
28.700
29.460
25.620
28.100
II
II
Ultimate Load (in kN)
Yield Stress (in N/mm'?)
32.'t00
725.643
33.060
787.432
32.760
804.918
32.580

767.760
II II
450.000
UTS (in N/mm'z) 877.049 903.279 895.082 890.164 700.000

II I
Extension (in mm) 3.300 3.520 3.620 3.520 3.200
Location of Fraciure WG.L W.G.L W.G.L WG.L
Remarks: The Result meets the Requirement of lS '1367 (Part-'14) GR.42-70
Witnessed Byl N.B
Tested By Authorized Signatory

{Under NABL)l
Condition Ot Reporting : az=
1. Sample musl be drawn by lhe party. The result relate only to lhe sample submitted by the party.
2. Any parl or parts of the Test Reporl shall not be resproduced. forthis, the written requesl to DLS is mandatory for the Customer
3. Samples arc store for fifleen days from lhe date of receipt.
dlq
DizineMeta[tur gi c a[ Seyai ce s Put. LtD.
ACCREDITED By NABL - ISO/IEC '17025 : 2017
14, Gopa I lndustrial Estate,
Opp. Vallabhnagar, Odhav,
Ahmedabad-382 415.
t.
El
la
079-2289108, 22E92aU,

www.dlvlneLbor.tory.com
9227
dMrEl.b_nhpoodltfii.ll.co.n
22G93 x@ TC-5098
lrlechanlcal Testing
Report No : f1841
ULR No. : TC509820000002918F Date: 1610112020
To,
Howe Engineering Projects (lndia) Pvt.Ltd
ACH-2(Howe Ofiice Building) at
Shantivan Township Near Vaishnodevi Circle,SG H hway,Ahmedabad382421
Test ens
Test Nlethod: lS 1367 (Part-14)
Test Performance At: Divine Metallurgical Services P Ltd. - Ahmedabad
lnstrument Used FIE l\.4ake U niversal Testing Machine,UTE -60(DLS-22) Due Date of Calibration:07.05.2020

Customer Ref No Ref . No. :CCPL, Date I 0.0'1.2020


Condition of Sample M8X50mm Long Connection Bolt
Nature Of Sample Test Piece of Connection Bolt Stamped as: -
Specification lS 1367 (Part-14) cR.A2-70
Date OfTesting 16t01t2020 Sample Drawn By : Party
roject Name:CCPL-Mundra

s.No.1 s.No.2 Min Max


Section Dimension (in mm) M8 M8
rea (in mm'z)

Gauge Length (in mm)


36.600
50.200
36.600

50.120
II
II
FinalGauge Length (in mm)
Yield Load (in kN)
54.500
28.320
54.400
24.220
II]
III
Ultimate Load (in kN)
Yield Skess (in N/mmz)
31.860
773.77'l
31.500
771.038
II
@I
UTS (in N/mm'z) 870.492 860.656
@I
Extension (in mm)

Location oI Fracture
4.300
W.G.L
4.280
W.G.L
@r
II
Remarks he Result meets the Requirement of IS 1367 Part-14) GR.42-70
y'Vltnessed Byl N.B. :

Tested By Auurodzed Signatory


(Under NABL)
Condition Of Reporting :
-=v
1. Sample must be drawn by the party. The resutt retate only to the sampte submitted by the party.
2. Any part or pa.ts ofthe Test Reportshallnot be resproduced. for this ,lhe wdtten requesl to DLS is mandatory for the Customer
3. Samples are storc for fifteen days frofi the date of receipt.

F G.M.

0
Dir.tine A/tevt[ur gica[ Vraices pur. LrD.
diq ld
ACCREDITED By NABL -tSO,lEC 17025:2017
Gopal lhdust.ial Estate,
Opp. \A[abhnagar, Odhav,
Ahmedabad-382 415.
! (,922fnr10L, 22!)2!9,9Zn22O9t
Et dvl.d.b_rara6drfti.l.co.r
O ws.dMnebtor.try.com
' #@ TC-5098

Tbst
Name & Address Customer
M/s. Test Report No. 51833 D
Howe Engineering Projects (lndia) Pvt.Ltd.
ACH-2(Howe Ofiice Building) at ULR No. : TC509820000003060F s
Shantivan Township Near Vaishnodevi Circle,SG P
Highway,Ahmedabad382421 13-O',t-2020
UAIE :
L

Description Ref,No.:CCPL,Datel 0.0'1.2020,Project Name:CCPL-Mundra

Nature of Sample : 600mm X 300mm Aluminum Roof Sheet


Date of Receipt of Sample : '1110'112020

Test method Used: PT.O.(SPECTRO ANALYSIS)


Specification : EN 10204 Al Alloy 3003(H16) ldentification : -

TEST RESULT
ELEM E NTS PERCENTAGE (%)

srLtcoN 0.160
IRON 0.s20
COPPER 0.052
MANGANESE 1.170
MAGNESIUM 0.001
ztNc 0.005
TITANIUM 0.01r
CHROMIUM 0.019
NICKEL 0.002
LEAD 0.001
TIN NIL
ALUMINIUM 98.040

N.B.:

Remarks : Above Composition/Elements Approved by

P.T.O.
20l8-Formate No.: F-1611
Diaine uteut[urgica[ varvi ces pzr. LrD.
#@
2
dtE ACCREDITED By NABL - tSOrtEC 17025 : 2Ol7
Eiate, ! or*22et1olt, 2t!918u, g227z2o!r!tt
14, Gopal lndustrial
Opp,\rallabhnapr,Odhar, Et dvklLb_nlfa'.dfirufi.co.n
Ahmedabad-382415. O wsudMrlcbtorrory..om TC-s098

Tbst
Name & Address Customer
M/s. Test Report No. S,t834 o
Howe Engineering Poects (ndia) Pvt.Ltd. M
ACH-2(Howe Ofiice Building) at ULR No. : TC509820000003061F s
Shantivan Township Near Vaishnodevi Circle,SG P
13-01-2020
Highway,Ahmedaba+382421 Date: L

Description: Ref.No.:CCPL,Datel 0.01.2020,Projecl Name:CCPL-Mundra

Nature of Sample : 200mmx250mm Aluminum RoofSheet


Date of Receipt of Sample i 1110112020
Test method Used: PT.O.(SPECTRO ANALYSIS)
Specification : EN 10204 AlAlloy 3003(H16) ldentification : -

TEST RESULT
ELEMENTS PERCENTAGE (%)

stLtcoN 0.160
IRON 0.520
COPPER 0.053
MANGANESE 1.150
MAGNESIUM 0.001
zlNc 0.005
TITANIUM 0.012
CHROMIUM 0.019
NICKEL 0.002
LEAD 0.00'l
TIN NIL
ALUMINIUM 98.050

N.B.:

Remarks : Above Composition/Elements Approved by

P.T.O.
20l8-Formate No.: F-15/1
Divine wemt[urgical Services pur. LrD.
die ACCREDITED By NABL - tSO,tEC l7O2S : 2017
1+ Gopal lndustrial Enate,
Opp, \hllabhnag.r, Odhar,
Ahmedabad-382 415.
I 07gl22E91o8, Zltr)2g,
El dh{lELb_r*9o.raftrEll.or
a wrw.dMi.Lto.ery.om
922722Gl,
#@ TC-5098

TEst
Name & Address Customer
M/s. Test Report No. 51835 D
Howe Engineering Projects (lndia) Pvt.Ltd. M
ACH-2(Howe Office Building) at ULR No. : TC509820000003062F s
Shantivan Township Near Vaishnodevi Circle,SG P
Highway,Ahmedabad3S242'l 13-01-2020
UAIE :
L

Description: Ref.No.:CCPL,Datel 0.01.2020,Proje6t Name:CCPL-Mundra

Nature of Sample: 500mm Long Support Leg(4omm Pipe)


Date of Receipt of Sample: '1110112020

Test method Used: PT.O.(SPECTRO ANALYSIS)


Specification : EN AW-6063 ldentification : -

TEST RESULT
ELEMENTS PERCENTAGE (%)

Min Max

srLtcoN 0.480 0.200 0.600


IRON 0.170 0.350
COPPER 0.001 0.100
MANGANESE 0.036 0.100
MAGNESIUM 0.5r0 0.450 0.900
ztNc 0.006 0.100
TITANIUM 0.013 0.100
CHROMIUM 0.001 0.100
NICKEL 0.004
LEAD NIL
TIN NIL
ALUMINIUM 98.760

N.B.:

Remarks :Above Composition/Elements Approved by


\-'-
"coNFoRM EN Aw-GoG3
D
N H P. s
P.T.O.
20l8-Formate No.: F-15/1
Diaine x/teu[lur gi c a[ Serai ces pur. Lrd.

dh ACCREDITED By NABL - ISOflEC 17025 : 20t7


14, GopallndusHal E tate,
Opp. Vallabhnat 0 Odh&/,
Ahmedabad-3E2 4:lt.
!
O
qrlzrtg1or3, zua:toa,

wrw.dMrEbbor{ory.com
92272209!13
El dir{l.bb_*ralrdrfrt!.I.corr @TC-5098

TEst
Name & Address Customer
' Test Report No. 51A36 D
Howe Engineering Poects (lndia) Pvt.Ltd. M
ACH-2(Howe Office Building) at ULR No. : TC509820000003063F s
Shantivan Township Near Vaishnodevi Circle,SG P
1.3-o't-2o2o
Highway,Ahmedabad3S242 1 Date: L

Description: Ref.No.:CCPL,Datel 0.0 l.2020,Project Name:CCPL-Mundra

Nature of Sample: 500mm Long Support Bracket


Date of Receipt of Sample : 11/0'l/2020
Used:
Test method PT.O.(SPECTRO ANALYSIS)
Specification: EN AW-6063 ldentification : -

TEST RESULT
ELEM ENTS PERCENTAGE (%)

Min Max

SILICON 0.490 0.200 0.600


IRON 0.160 0.350
COPPER 0.001 0.100
MANGANESE 0.039 0.100
MAGNESIUM 0.540 0.450 0.900
ztNc 0.005 0.100
TITANIUM 0.01s 0.100
CHROMIUM 0.004 0.100
NICKEL 0.004
LEAD NIL
TIN NIL
ALUMINIIJM 98.730

N.B.:

Remarks : Above Composition/Elements

---- w'-
-coruroRu EN Aw-Goo3

PI.O.
20l8-Formate No.: F-16/i
Diaine tvteutturgi c a[ Serai ces put. LrD.

diq ACCREDITED By NABL - lSOnEC 17025 : 2017


! orlzra o8, ,2ltlnra, 9x272a1t93
14 Gopal lndustri.l Eihte,
Opp. Wllabhnag.., Odhav,
Ahmedabad-3E2 415.
e, trtrLl_ir9.,ldlttn [.Gn
a w{.dMrEhtor&ry.corn
@TC-5098

TEst R
Name & Address Customer
M/s-
' Test Report No. SiB37
D
Howe Engineering Prolecls (lndia) Pvt.Ltd. M
ACH-2(Howe Ofiice Building) at ULR No. : TC509820000003064F s
Shantivan Township Near Vaishnodevi Circle,SG P
13-01-2020
Highway,Ahmedabad382421 oate: L

Description: Ref.No.:CCPL,Datel 0.01.2020,Projecl Name:CCPL-Mundra

Nature of Sample : 200mm Long Support Bracket


Date of Receipt of Sample i 1110112020
Used:
Test method PT.O.(SPECTRO ANALYSIS)
Specification: EN AW-6063 ldentification: -

TEST RESUTT
ELEMENTS PERCENTAGE (%}

Min Max

stLtcoN 0.120 0.200 0,000


IRON 0.290 0.350
COPPER 0.028 0.'100
MANGANESE 0.770 0.100
MAGNESIUM 4.200 0.450 0.900
ztNc 0.015 0.'100
TITANIUM 0.013 0.100
CHROMIUM 0.120 0.'100
NICKEL 0.005
LEAD 0.002
TIN NIL
ALUMINIUM 94.420

N.B,:

Remarks : Above Composition/Elements Approved by

NOTCONFORM ENAW.6O63

P,T,O.
20l8-Formate No.: F-15l1
2 Diaine tvteutlur gi c al Serai ces put. LtD.

dLE ACCREDITED By NABL - ISOnEC 17025 : 2017


14 Gopal lndustrial Estate,
Opp. V'.llabhnatar, Odhav,
Ahmedabad-3E2 415,
l. 07$22A)rc8, zll9jMa , 9227220993
El drlr.LL*qNnrn [.cdr
a M.dMrEbhor.tory.com
@
TC.5098

TEst
Name & Address Customer
Mls. Test Report No. 51838
D
Howe Engineering Projects (lndia) Pvt.Ltd. M
ACH-2(Howe Ofiice Building) at ULR No. : TC509820000003065F s
Shanlivan Township NearVaishnodevi Circle,SG P
Date: 13-01-2020
Highway,Ahmedaba+38242 1 L

Description: Ref.No.:CCPL,Datel 0.01.2020,Projecl Name:CCPL-Mundra

Nature of Sample : 250mm Long Support Bracket


Date of Receipt of Sample : 1110112020
Test method Used: PT.O.(SPECTRO ANALYSIS)
Specification : EN AW-6063 ldentification : -

TEST RESUTT

ETEMENTS PERCENTAGE (%)

Min Max

SILICON 0.480 0.200 0.600


IRON 0.203 0.350
COPPER NIL 0.'100
MANGANESE 0.052 0.100
MAGNESIUM 0.490 0.450 0.900
ztNc NIL 0.100
TITANIUM 0.0 t4 0.100
CHROMIUM NIL 0.100
NICKEL 0.004
LEAD NIL
TIN NIL
ALUMINIUM 98.740

N.B.:

Remarks : Above Composition/Elements Approved by

CONFORM EN AW-6063

P.T.O.
2018-Formate No.: F-i6A
Diaine ttrteta[[ur gi c a[ Servi ces put. LrD.
diq Opp.
ACCREDITED By NABL - ISOnEC 17O25..201?
Industri.l Estate,
14, Gopal
Wllabhrat
L 0?$28tr08, zlg2loa, 92lt72201
., Odhav,
Ahmedab.+3E2415.
el
a
dMn LLnieltrititr.ll.com
rwd\drtbtor.S.y.com
93
#@ TC-5098

TEst Re
Name & Address Customer
u/s. Test Report No. 51839 D
Howe Engineering Projects (lndia) Pvt.Ltd. M
ACH-2(Howe Ofiice Building) at ULR No. : TC509820000003066F s
Shantivan Township Near Vaishnodevi Circle,SG P
13-01-2020
Highway,Ahmedabad382421 Date: L

Description: Ref.No. :CCPL,Datel 0.0'1.2020,Project Name:CCPL-l\4undra

Nature of Sample : 280mm Long Roof Drain Pipe


Date of Receipt of Sample : 11/01/2020
Test method Used : PT.O.(SPECTRO ANALYSIS)
Specification : EN AW-6063 ldentification: -

TTST RESULT
ELEMENTS PERCENTAGE (%)

s.No.01 s.No.02 Min Max

slLtcoN 0.390 0.390 0.200 0.600


IRON 0.170 0.170 0.350
COPPER NIL NIL 0.100
MANGANESE 0.031 0.032 0.100
MAGNESIUM 0.450 0.460 0.450 0.900
ztNc 0.003 0.003 0.'100
TITANIUM 0.017 0.017 0.100
CHROMIUM 0.001 0.00r 0.100
NICKEL 0.003 0.003
LEAD NIL NIL
TIN NIL NIL
ALUMINIUM 98.930 98.910

N.B.:

Remarks : Above Composition/Elements Approved by

I -..-...
CONFORM EN AW.6O63
MD/ Lab
N,H.P. 5.K G K.
P.T.O.
2018-Formate No,: F-16n
Diaine tvfeuhur gi c al Serui ces Put. LtD.
die ACCREDITED By NABL - ISOfEC 17025 : 2017
14, Gopel lndustri.l Estate,
Opp. \hllabhna8.r, Odhar,
Ahmedab.+382 415.
I o7g-z,,/lt0rr, z2arz,,),, 9t27 22099?
El dlrrhd.L pdllirll..om
O wKr.dM[bDoraEy.co.n
#@ TC-5098

TEst R
Name & Address Customer
M/s.' Test Report No. 51840 D
Howe Engineering Projects (lndia) Pvt.Ltd. M
ACH-2(Howe Office Building) at ULR No. : TC509820000003067F s
Shantivan Township Near Vaishnodevi Circle,SG P
13-01-2020
Highway,Ahmedabad3S242 I Date: L

Description: Ref.No.:CCPL,Datel 0.01.2020,Projecl Name:CCPL-Mundra

Nature of Sample : M8X30mm Long Connection Bolt


Date of Receipt of Sample i 1110112020
Used:
Test method ASTM E - 1086 - 2014(SPECTRO)
Specification: lS 1367 (Part-14) Gr. 42-70 ldentification : -

TEST RESULT

ELEM E NTS PERCENTAGE (%)

s.No.01 s.No.02 s.No.03 S,NO.04 Min Max

CARBON 0.026 0.027 0.026 0.026 0.080


SILICON 0.400 0.390 0.390 0.380 1.000
SULPHUR 0.024 0.024 0.023 0.022 0.030
PHOSPHORUS 0.035 0.035 0.034 0.034 0.050
MANGANESE 1.670 1.750 'l.750 '1.740 2.000
NICKEL 8.130 8.230 8.180 8.250 8.000 13.000
CHROMIUM 18.160 18.250 18.260 18.220 17,000 20.000
MOLY 0.300 0.270 0.260 0.260
COPPER 0.700 0.'140 0./til0 0./t40 4.000

N.B.:

Remark : Above Composition/Elements Approved by


\.'-
CONFORM lS '1367 (Part-14) Gr. A2-70

P.T.O.
2018-Formate No.: F-16ll
Divine tweta[[ur gi c a[ Serui ces put. LtD.
d LE
2
ACCREDITED By NABL - ISOnEC 17025 : 2017
14 Gopal lndunrhl Estate,
Opp. \rbllabhnatar, Odhav,
Ahm€daba43E2 415.
!
g
07922t9r0U, Zrl9ltor,

O wrY-dM hlor.tdy.com
9227220!)!13
d|rliaSaLnltgl'rr{thfll.corrl #@ TC-5098

TEstRepor[ I

Name & Address Customer


'
M/s. TestReportNo. 51841
D
Howe Engineering Projecls (lndia) Pvt.Ltd. M
ACH-2(Howe Office Building) at ULR No. : TC509820000003068F s
Shantivan Township Near Vaishnodevi Circle,SG P
1+01-2020
Highway,Ahmedabad38242 1 Date: L

Description: Ref.No.:CCPL,Date l 0.0 l.2020,Projec1 Name:CCPL-Mundra

Nature of Sample: M8x30mm Long Connection Bolt


Date of Receipt of Sample i 1110'1/2020
Used:
Test method ASTM E - 1086 - 2014(SPECTRO)
Specification: lS 1367 (Part-14) Gr A2-70 ldentification: -

TEST RESUtT
ELEMENTS PERCENTAGE (%}

s.No.01 s.No.02 Min Max

CARBON 0.032 0.036 0.080


SILICON 0.410 0.410 1.000
SULPHUR 0.025 0.025 0.030
PHOSPHORUS 0.032 0.032 0.050
MANGANESE 1.600 1.590 2.000
NICKEL 8.010 8.020 8.000 13.000
CHROMIUM 18.010 18.010 17.000 20.000
MOLY 0./tl0 0./tt 0
COPPER 0.600 0.610 4.000

N.B

Remarks : Above Composition/Elements Approved by


,-.?

CONFORM lS 1367 (Part-14) Gr. A2-70


M D La b n ch arSe
N H. P s. K.G VH.K.
P.T.O.
20l8-Formate No.: F-16l1

You might also like