TRANSIT ORIENTED DEVELOPMENT.

CASE STUDY
TOD NODE /
STATION AREA
• The TOD Standard has been
designed to evaluate new
urban development.
• The Standard has a
complementary methodology
and set of metrics for use in
evaluating larger, existing areas
surrounding high-capacity
transit stations.
• These metrics have been
developed to allow
stakeholders to understand
existing land use
characteristics, or to
benchmark newly developed
station area plans in relation to
best practice transit-oriented
places.
FUNCTIONS
AND ZONING

ADMIN (V,S) TRANSIT (P,V,S) PERIPHERAL(P,S) CORE(P,V,S)


DESIGN PRINCIPLES
• Objective: Maximum Passenger
Convenience with Fast and Efficient
Passenger Flow
• Design Approach and Hierarchy:
should be done from whole to part:
Primary Order: Describes the creation of
Station volumes through large scale
engineering. Yard alignment, no. & size of
platform, size & location of concourses
etc.
Secondary Order: Building Components,
such as detailing of concoursespace,
facilities of passengers, operational
offices, staircases, escalators, elevators,
passageway, entry, exit, roof, ceilings,
walls etc.
Tertiary Order: Passenger Information
System, Seating, Lighting etc.
PRIMARY DATA
1.Station Facility Audit Survey
Objective : To cross-check the availability of passenger’s
amenities in the railway station as per the standards of Indian
Railway Manual.

2.Station User Opinion Survey – 250 Samples


Objective : To comprehend the user’s outlook (satisfaction level)
on the activities / components of the railway station for further
detailed surveys and analysis.

3.Station User Characteristics Survey – 250 Samples


Objective : To analyse user’s characteristics:
• Dwell Time of each movement and activity
• Profession,
• Income level,
• Time spent on the platforms or waiting lounge, and
• Luggage carried.
4.Passenger count survey by videography and photography
approach
KEY PERFORMANCE INDICATORS (KPI)

• To calculate productivity of any Station /


terminal in terms of its Physical and
Operational characteristics in the most
relevant Quantitative method is by
assessing the Level of Service (LOS), from
part to whole.
• Also, according to Indian Railway manual
2009, Creation of Station Volumes by
means of number & size of platforms, size
& location of concourse etc. is the primary
order for station planning & design, to
fulfill their objective of Maximum
Passenger Convenience with Fast and
Efficient Passenger Flow
Identified Key Performance Indicators:
• Dwell Time
• Level of Service (LOS)
-- Average Passenger Space (m²/pax)
-- Flow Rate (pax/m/min)
SITE
EXISTING BUILDING COMPONENTS
EXISTING SITE PICTURES
SCHEMATIC ZONING
DWELL TIME
Peak Hours :
9 am to 10 am (Morning)
5 pm to 6 pm (Evening)
60 % passenger footfalls at
Ajmeri Gate side, because of
the following

•Availability of PT
like bus service &
metro,
•Multilevel car
parking etc.
•Lower
Congestion level
as compare to
Paharganj.
LEVEL OF SERVICE (LOS)
Indian Railways follows “J.J. Fruin’s LOS Performance Standards”
LEVEL OF SERVICE (LOS)

At FOB
FOB
PROBLEMS AT RAILWAY STATION
STRATERGIES FOR STATION PRODUCTIVITY
IMPROVEMENT
NEW DELHI RAILWAY STATION
REDEVELOPMENT
DESIGN DETAILS
AREA PROGRAM
ROOF PLAN
LEVEL +/-0.00

GROUND FLOOR PLAN


LEVEL +5400

MEZZANINE FLOOR
PLAN

LEVEL +12000
LEVEL +8100

DEPARTURE FLOOR
INFERENCE:
1.Proper Spatial Zoning-
• No passenger will have the need to walk 2 mins apart from his set course for basic
amenities.This reduces unnecessary crowding and easy monitoring further improving
time taken aspects and security.
• The connectivity through seperate floors creates a barrier free design making it
universally accessible.
• Secluded space for admin. creates a clean office space without interupption and and
management.
• Proper Signage and Differentiation between pathway and stairs must be included.
2. Circulation-
• The Seperate entry and exit routes leading to and fro parking, encouraging the
pedestratian path from RailTerminus to Metro, covers the major objective of TOD by
saving the time wasted before and after commute.
• A drop off point for the share autos, autorickshaws etc., ( popular mode of transport
in Delhi ) must be included to reduce the Visitor traffic tension at the entrance.
3.Planning-
• No.of Toilets should be based on futuristic crowd expectations and not existing flow
rate.
• Check-in gates and Luggage-Trolley bay /Cloak rooms could be adjacent for better
circulation.
• Technical areas like Switchrooms etc., which is critically zoned, should be designed
properly such that passengers don't tresspass.
4.Structure-
• The Roof design materials(Openings) should
be designed properly such that it doesn't
affect the Escalators, Travelators etc.,
• The Use of Large volume of steel might
require extra caution to follow fire safety
standards.

5.Miscellenous-
• Although retail and Shopping amenities are
provided, better multi use spaces could be
provided for passegers who spend a brief
stay.
• The Volumetric design could have included
more green spaces in the platform for little
breathing spaces.
GOMTI NAGAR RAILWAY STATION
LUCKNOW (REDEVELOPMENT)
ZONING
MAIN FEATURES

• Centrally located prime land


• Attractive pricing & instalment
linked payment plan
• Flexible commercial & retail spaces
• Maximum frontage, wide corridors
& atriums
• Rain water harvesting and fire
safety compliance
• Direct connectivity to station
building
• Multiple access and wide
connectivity
• Centrally air-conditioned common
spaces
• Integrated building management
system
• CCTV surveillance
• State of modern art facilities
• Treated water use for horticulture
CONNECTIVITY PARKING FACILITY
• Site is well connected to transport • Adequate provision will be made for
facilities as well as surrounded by car/vehicle parking at the project
populated areas. Gomti Nagar site. There shall be adequate
Railway Station in itself is a parking provisions for visitors so as
connectivity boon for the city of not to disturb the traffic and allow
lucknow and nearby areas, with smooth movement at the site.
confluence of many people reaching Proposed project will have an open
their places of travel, work, etc parking.
through it. • Approx. 2000 parking including
• Nearest Railway Station: Malhour basement.
Railway Station (Approx. 3.76 km,
ESE)
• Nearest Airport: Chaudhary Charan
Singh International Airport
(Approx.16.06 km, SW)
VIDEO
What Did We Infer?
Development phase
Planning
Crowd Management
Connectivity
Innovative Integration of
Functionality