Minor Drain

Reference Calculation Output


nd
All reference is Manual SaliranMesraAlam (MSMA 2
Edition)

Catchment area = CA 1
Table 2.2
Land use = Sekolah&Tangki Air
1. Area = 28135 m2 (2.8135 ha)
2. Horton's Roughness Value, n* = 0.015 (Paved)
3. Overland sheet flow path length, Lo (m) = 135m
4. Elevation Level
Elevation Level Top (m) = 219.5m

Table 2.1 Elevation Level Bottom (m) = 215m


Table 2.2 5. Gradient/slope of overland surface, S (%)
ELTop−EL Bottom
S= x 100
Lo
Figure 219.5−215
2.F1 S= x 100
135

Table 2.3 S = 3.33%


6. Overland sheet flow travel time, to (min)
1
107 n L 3
𝑡𝑜= 1
S2
1
3
107 x 0.015 x 135
to = 1
2
S
to= 4.51 min

DRAIN FLOW TIME


7. Drain length, Ld(m) = 246.4m
8. Manning's Coefficient, n = 0.015
9. Elevation Level
Elevation Level Top (m) = 219.5m
Elevation Level Bottom (m) = 215m
10. Flow gradient, G (m)
G = EL Top – EL Bottom
G = 219.5 – 215
G = 4.5m
11. Friction’s slope, S (m/m)
S = Flow gradient, G / Drain length, Ld
4.5
S=
246.4
S = 0.02
Table 12. Area of drain, A
2.B1 A = 1200mm (Depth) x 600mm (Width)
A = 720 000mm2(0.72m2)

13. Wetted perimeter, P


P = (1.2 x 2) + 0.6
P = 3m

14. Hydraulic Gradient, R


A
R=
P
Table 2.5
0.72
R=
3
R = 0.24
15. Travel time in drain, td

0.015 x 246.4
td= 2 1
3 2
60 x 0.24 x 0.02
td = 1.1803
16. Time of Concentration, tc (min)
tc = to + td
tc = 4.51 + 1.1803
tc = 5.69
DESIGN FLOW

17. IDF constants


STOR JPS BATU PAHAT
T=ARI 5 Year
λ 64.099
ᴋ 0.174
θ 0.201
Ƞ 0.826

18. Rainfall intensity, i


λTᵏ
I= (mm/hr)
(ԁ + θ)ᵑ
0.174
i = 64.099 x 5
¿¿
i= 231.946 mm/hr

19. Runoff Coefficient, C = 0.65


20. Determination of peak flow, Q
C .i . A
Q= (m3/s)
360
0.65 X 231.946 X 2.8135
Q=
360
Q = 1.178 m3/s

DRAIN PROPERTIES

21. Design slope = friction’s slope = 0.02


22. Drain capacity , Q
2 1
3 2
Q= AR S
n
2 1
3 2
Q = 0.72 x 0.24 x 0.02
0.015
Q = 2.505 m3/s

23. Drain Velocity, V


V = Peak flow, Q / Area Drain, A
V = 6.679 / 3.75
V = 1.78 m/s
24. Velocity limit = 2 m/s

Summary:

Inflow from proposed development:


Total inflow, Q = 1.178 m3/s
Drain capacity, Q = 2.505 m3/s OK !
Drain velocity limit = 2.0 m/s OK !
Drain velocity = 1.78 m/s

Therefore, Total inflow, Q < Drain capacity, Q


Therefore, Drain velocity < Velocity limit