Attachment 1 TOP Binder Index
Attachment 1 TOP Binder Index
Attachment 1 TOP Binder Index
OWNER: CONTRACTOR:
SUB SYSTEM:
AD2-C2-W0-WAZ01-QEE-SIS-00024
OWNER: CONTRACTOR:
TABLE OF CONTENTS
SECTION DESCRIPTION PAGE
1 ECC Package
1.1 Erection Completion Certificate
1.2 Reference Documentation
1.2.1 P&ID with system identified
1.2.2 ECC Battery Limits Definition
1.2.3 Functional Description and O&M Manuals List
1.2.4 Lay out identifying system area
1.2.5 Data Sheets
1.2.6 Single Line Diagram
1.2.7 Equipment List
1.2.7.1 Mechanical Equipment Lists
1.2.7.2 Electrical Equipment Lists
1.2.7.3 I&C Equipment Lists
1.2.8 Lines Lists
1.2.9 Valves Lists
1.2.10 Cables Lists
1.2.11 Codes and Standards List
1.3 Mechanical / Electrical / I&C Erection Documents
1.3.1 Mechanical Erection Documents
4 TURN-OVER PUNCHLIST
4.1 PunchList
Provided within thirty (30)
Acceptance.
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
1.ECC Package
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
System
ECC No.
Date
Signature
Commissioning acceptance:
EPC Commissioning
Acceptance Partial acceptance Rejection
manager
Signature
Name/Signature/date
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
5
OWNER: CONTRACTOR:
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
List of Equipments
ITEAM NAME of Equipment KKS Mark
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
List of Lines
ITEAM NAME of Instruments KKS Mark
5
OWNER: CONTRACTOR:
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
List of Valves
5
OWNER: CONTRACTOR:
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
5
OWNER: CONTRACTOR:
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
NCR List
Issued Closed
ITEAM Description NCR No. From To
date date
1
5
OWNER: CONTRACTOR:
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
2. CCC Package
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
5
OWNER: CONTRACTOR:
5
OWNER: CONTRACTOR:
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
5
OWNER: CONTRACTOR:
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
5
OWNER: CONTRACTOR:
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
System
TAG number
Date
Acceptance result The system and sub-system commissioning work are qualified completed.
SUPPORTING DOCUMENTATION:
Remark:
NAME
DATE
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
5
OWNER: CONTRACTOR:
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
5
OWNER: CONTRACTOR:
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
4. TURN-OVER PUNCHLIST
OWNER: CONTRACTOR:
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT
AL DUR PHASE II
INDEPENDENT WATER AND POWER PROJECT