ARCTIC LNG 2 LLC

EXCEPTION REQUEST RFC ✘ AOC


Client Name : ARCTIC LNG 2 LLC Project Name : ARCTIC LNG 2

Contractor : CASCADE ENGINEERING Project No.: 079332

EXCEPTION No: EXP-GBS2-0055 Description:


Module No.: 2-TMR-005
System No.: 2-BLM-000 Main Technical Room & EDGs
Sub-System No.: 2-BLM-000-EL-ET-01 BLM-000-EDG - EDG-200A/B/C/D
Type of Exception (Select applicable)
Tags ✘ QCF form Punch List NCR Document
If Other provide Details:
Disciplines included under this Exception (Select)
Civil and
Structure
Mechanical Piping ✘ Electrical Instrumentation Telecoms
HVAC Safety Equip Painting Building Other
Equipment / Tagged Items to be covered under the Exception Request. Ensuring to address all aspects
Details of Exception Include including Pre-Commissioning / Commissioning and Start-up impacts that this exception may have.

Tag Tag Description Exp. Type No: Reason for Exception


G241N-241-EB-PE-
Earthing Cable (Secondary) QCF 2757979 Will be done in later stages
102-PE/1
G241N-241-EB-PE-
Earthing Cable (Secondary) QCF 2757980 Will be done in later stages
102-PE/1
G241N-241-EB-PE-
Earthing Cable (Secondary) QCF 2757981 Will be done in later stages
102-PE/2
G241N-241-EB-PE-
Earthing Cable (Secondary) QCF 2757982 Will be done in later stages
102-PE/2
G241N-241-EB-PE-
Earthing Cable (Secondary) QCF 2757983 Will be done in later stages
102-PE/3
G241N-241-EB-PE-
Earthing Cable (Secondary) QCF 2757984 Will be done in later stages
102-PE/3
G241N-241-EB-PE-
Earthing Cable (Secondary) QCF 2757985 Will be done in later stages
102-PE/4
G241N-241-EB-PE-
Earthing Cable (Secondary) QCF 2757986 Will be done in later stages
102-PE/4
G241N-241-EB-PE-
Earthing Cable (Secondary) QCF 2758003 Will be done in later stages
105-PE/3
G241N-241-EB-PE-
Earthing Cable (Secondary) QCF 2758004 Will be done in later stages
105-PE/3
G241N-241-EB-PE-
Earthing Cable (Secondary) QCF 2758005 Will be done in later stages
105-PE/4
G241N-241-EB-PE-
Earthing Cable (Secondary) QCF 2758006 Will be done in later stages
105-PE/4

Detail Mitigation Measures (Provide Details of Mitigation measures that Contractor will implement)

Exception Originator Detail

1
EXP-GBS2-0001
ARCTIC LNG 2 LLC

EXCEPTION REQUEST RFC ✘ AOC


Client Name : ARCTIC LNG 2 LLC Project Name : ARCTIC LNG 2

Contractor : CASCADE ENGINEERING Project No.: 079332

Name: Alister Mackinnon Signature:

Position: Completion Manager Date: 11.21.2023


CTR Approval Signatories
Construction Manager Commissioning Manager
Name: Michel Swaidan

Signature:

Date:
Company Approval Signatories
Company Representative
Name:

Signature:

Date:

Approval Required Required for every Exception

2
EXP-GBS2-0001