SECTION 09515 Matal Ceiling Systems

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

ANZ Royal Bank (Cambodia) LTD.

Mao Tse Tung Blvd Branch


Construction New Building June 2008

SECTION 09515

MATAL CEILING SYSTEMS

PART 1- GENERAL

1.1 SUMARY

A. Provide suspended metal ceiling system where shown on the Drawings, as specified
herein, and as needed for a complete and proper installation.

B. Related work:

1. Documents affecting work of this Section include, but are not necessarily
limited to, General Conditions, Supplementary Conditions, and Sections in
Division 1 of these Specifications.

1.2 SUBMITTALS

A. Comply with pertinent provisions of Section 01340.

B. Product data: Within 45 calendar days after the Contractor has received the Owner’s
Notice to Proceed, submit:

1. Materials list of items proposed to be provided under this Section.


2. Manufacturers’ specifications and other data needed to prove compliance
with the specified requirements.
3. Shop Drawings showing details of proposed suspension, layout, lateral
restraint, and interface with work of other trades.
4. Manufacturers’ recommended installation procedures which, when approved
by the Architect, will become the basis for accepting or rejecting actual
installation procedures used on the Work.

C. Samples: Accompanying the above submittal, submit Samples of:

1. Each type of aluminum item proposed for use;


2. Each component of the proposed suspension system;
3. Proposed acoustical material;
4. Standard finish colors available in the proposed system.

1.3 QUALITY ASSURANCE

A. Use adequate numbers of skilled workmen who are thoroughly trained and
experienced in the necessary crafts and who are completely familiar with the
specified requirements and the methods needed for proper performance of the work
of this Section.

B. Mock-Ups:

1. At an area on the site where approved by the Architect, provide a mock-up


ceiling panel.

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

a. Make the mock-up panel approximately 8’-0” square.


b. Provide one mock-up panel for each ceiling pattern and type used on
the Work.
c. The mock-ups may be part of the Work, and may be incorporated into
the finished Work, when so approved by the Architect.
d. Revise as necessary to secure the Architect’s approval.
2. The mock-up panels, when approved by the Architect, will be used as datum
points for comparison with the remainder of the metal ceiling installation for
the purpose of acceptance or rejection.
3. If the mock-up panels are not permitted to be part of the finished Work,
completely demolish and remove them from the job site upon completion and
acceptance of the work of this Section.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Comply with pertinent provisions of Section 01620.

B. Do not begin installation in any area until sufficient materials are on job site to
complete the work of this Section in that area.

PART-2 PRODUCT

2.1 SUSPENDED ALUMINUM CEILING

A. Acceptable manufacturers:

1. Alcan Aluminum Corporation.


2. Other manufacturers with equal products approved in advance by the
Architect.

B. Provide the manufacturer’s standard suspension system, complying with


requirements of governmental agencies having jurisdiction, and as approved by the
Architect.

C. Insulation: Provide glass fiber batts, 2 lb density, 1” thick.

D. Panels and carriers: Provide a subsystem of ceiling panels and carriers with the
following attributes.

1. Ceiling panels:
a. Standard panels formed, after painting, from 0.025” Alcan aluminum
alloy 3005-H26;
b. Dimensions 7-3/8” wide by minimum length of 3’-0” and maximum
length of 20’-0”;
c. Formed to snap onto, and be securely retained on, the provided
carriers without separate fasteners.
2. Carriers:
a. Standard carriers formed, after painting, from 0.040” Alcan aluminum
alloy 3005-H26, into a hat section 1-3/4” deep with protruding ears
designed to allow a 5/8” space between ceiling panels.
b. On both slanted sides of the carrier, provide 3/16” diameter holes at 2”
centers to accommodate hanger wires.

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

c. Also provide holes along spines to permit attachment to overhead


structural supports.
3. Splices: Provide the manufacturer’s standard units.
4. Access sections:
a. Provide the manufacturer’s standard design access sections with door
hinge assemblies, retainer clips, and retainer bars.
b. Provide for upward or downward aiming opening.

E. Finish:

1. Prepare all surfaces of all aluminum components with a chemical wash coat
and a chromate conversion coat.
2. On ceiling panels and the exposed surfaces of interior splices, provide a prime
coat and one backed-on coat of polyester enamel.
3. On carriers and carrier splices, provide a baked-on epoxy color coat.
4. Colors:

a.
Carriers and carrier splices: Flat black.
b.
Ceiling panels and the exposed surfaces of interior splices:
(1) Color type 1: Bright finish mirror reflecting metal with
acrylic lacquer protection;
(2) Color type 2: A standard finish color of the approved
manufacturer as selected by the Architect.
2.2 OTHER MATERIALS

A. Provide other materials, not specifically described but required for a complete and
proper installation, as selected by the Contractor subject to the approval of the
Architect.

PART 3- SURFACE CONDITIONS

A. Examine the areas and conditions under which work of this Section will be
performed. Correct conditions detrimental to timely and proper completion of the
Work. Do not proceed until unsatisfactory conditions are corrected.

3.2 INSTALLATION

A. Except as modified by requirements of governmental agencies having jurisdiction,


install the work of this Section in strict accordance with the manufacturer’s
installation recommendations as approved by the Architect.

B. Lateral bracing:

1. Provide lateral bracing as required by pertinent codes and regulations.

2. Secure lateral bracing to structural members. Secure at right angles to the


direction of the partition and four-ways in large ceiling areas.
C. Make all finished surfaces level, or true to plane where plane is designed to be other
than level, within a tolerance of one in 1000, and straight within a tolerance of one in
1000.

File: ANZ-SP-MTB 2007


ANZ Royal Bank (Cambodia) LTD. Mao Tse Tung Blvd Branch
Construction New Building June 2008

3.3 CLEANING UP

A. In addition to other stipulated requirements for cleaning, completely remove finger prints
and traces of soil from the surfaces of exposed portions, using only those cleaning
materials recommended for the purpose by the manufacturer of the material being
cleaned.

END OF SECTION