Slab Design
Slab Design
Slab Design
discontinuous
discontinuous
discontinuous
Shorter Span Lx = 4 m
Ratio Ly/Lx = 1.725
Coefficients Moment Bar Dia. d fcu fy Factor, K Factor, z As, reqd As, prov fs
KN-m mm mm N/mm2 N/mm2 mm2 mm2 N/mm2
(-) Bsx 0.000 0.00 12 124 30 460 0.000000 124.00 0 524
(-) Bsy 0.000 0.00 12 112 30 460 0.000000 112.00 0 524
(+) Bsx 0.103 18.54 12 124 30 460 0.040193 118.19 392 754 149.46
(+) Bsy 0.056 10.08 12 112 30 460 0.026786 108.56 232 754 88.47
Total Design Load, wu = 1.4 x Dead Load + 1.6 x Live Load ( BS Code )
PROJECT :
SLAB S
discontinuous
discontinuous
discontinuous
Longer Span Ly = 6.1 m
Shorter Span Lx = 5.7 m
Ratio Ly/Lx = 1.070
Coefficients Moment Bar Dia. d fcu fy Factor, K Factor, z As, reqd As, prov fs
KN-m mm mm N/mm2 N/mm2 mm2 mm2 N/mm2
(-) Bsx 0.000 0.00 12 224 30 460 0.0000 224.00 0 0
(-) Bsy 0.000 0.00 12 212 30 460 0.0000 212.00 0 0
(+) Bsx 0.065 38.54 12 224 30 460 0.0256 217.44 443 754 168.88
(+) Bsy 0.056 12.00 12 212 30 460 0.0089 209.88 143 754
Total Design Load, wu = 1.4 x Dead Load + 1.6 x Live Load ( BS Code )
Size of Ribs
Width (mm) Depth (mm) C/C Distance between Ribs
Ribs Direction top bottom ( mm )
In Shorter direction 140 180 320 560
In Longer direction 140 180 320 560
wu = 9.50 KN/M2
Total Design Load, wu = 1.4 x Dead Load + 1.6 x Live Load ( BS Code )
Depth & weight of hourdi used
Loading due to Ribs = 4.721 KN/M2 Depth = 250 mm
Loading due to Hourdi Blocks = 1.875 KN/M2 Weight = 0.21 KN
= 8.622 KN/M2
Load on shorter Ribs/ unit length = 4.828 KN/M
= 7.474 KN/M2
Load on longer Ribs/ unit length = 4.185 KN/M
discontinous
Size of Ribs
Width (mm) Depth (mm) C/C Distance between Ribs
Ribs Direction top bottom ( mm )
In Shorter direction 140 180 320 560
In Longer direction 140 180 320 560
Total Design Load, wu = 1.4 x Dead Load + 1.6 x Live Load ( BS Code )
Depth & weight of hourdi used
Loading due to Ribs = 4.532 KN/M2 Depth = 240 mm
Loading due to Hourdi Blocks = 1.875 KN/M2 Weight = 0.21 KN
= 8.020 KN/M2
Load on shorter Ribs/ unit length = 4.491 KN/M
= 7.187 KN/M2
Load on longer Ribs/ unit length = 4.025 KN/M
ccc
cover = 25 mm dia = 16 D= 600 mm
fc= 30 fy = 460 b= 200 mm d = 567 mm
M= 200 kNm V= 250 kN
K = M/{(bd2)*fc} = 0.103684 <.156 if K <K'=.156 ,comp steel is not reqd.
As prpvide 1340
Design concrete shear stress,vc (Table 3.9,BS 8110) = 0.632(100As/bd)1/3(400/d)1/4
100As/b'd 1.181658 < 3,use = 1.181658 , 400/d = 0.705467 >=1 use 1
MFt= 1.027059
cover = 40 mm dia = 25 D= 700 mm
fc= 40 fy = 460 b= 1000 mm d = 647.5 mm
M= 940 kNm
K = M/{(bd2)*fc} = 0.056052 <.156 if K <K'=.156 ,comp steel is not reqd.
As prpvide 999
Design concrete shear stress,vc (Table 3.9,BS 8110) = 0.632(100As/bd)1/3(400/d)1/4
100As/b'd 0.1542857143 < 3,use = 0.154286 , 400/d = 0.617761 >=1 use 1
MFt= 1.3160649423
PLOT NO. LOCATION:
Total Design Load, wu = 1.4 x Dead Load + 1.6 x Live Load ( BS Code )
Total Design Load ( Decking + Ribs + Hourdi Blocks ) on Rib = 7.742 KN/M
PROJECT :
Shorter Span Lx = 9 m
fcu = 40 N/mm2
fy = 460 N/mm2
wu = 9.50 kN/M2
Total Design Load, wu = 1.4 x Dead Load + 1.6 x Live Load ( BS Code )
Total Design Load ( Decking + Ribs + Hourdi Blocks ) on Rib = 9.900 kN/M
page 1
EDMAC CONSULTING
page 1
EDMAC CONSULTING
page 1
EDMAC CONSULTING
MF(comp)
2-12 1.143
2no14mm 1.185
16 1.228
20 1.32
25 1.42
page 1
EDMAC Consulting
PLOT NO. LOCATION:
PROJECT : G + 1 VILLA
wu = 8.80 KN/M2
Total Design Load, wu = 1.4 x Dead Load + 1.6 x Live Load ( BS Code )
Total Design Load ( Decking + Ribs + Hourdi Blocks ) on Rib = 7.742 KN/M
PROJECT :
The net earth pressure acting upward due to fact. load , qu=Pu/Ap 100 kN/m2
Assuming overall depth of footing ,D = 600 mm, cover (mm ) = 75 dia of bar 20
Effective depth, dx = 515 mm dy = 495 mm
Size of column , b = 800 mm c= 800 mm
Mx =(qu*l1 )/2
2
= 91.125 kN-m My =(qu*l2 )/2
2
= 91.125 kN-m
K =M/(b*d^2*Fcu) Kx = 0.011453 Ky = 0.012397 , If K <= K',comp. steel not reqd.K' =0.156
Lever arm,z = d[0.5+sqrt{0.25-(K/0.9)}] zx = 508.361 zy = 488.0852
Area of steel reqd,As =M*10^6/(.87*Fy*z) , Asx = 447.9074 mm2 Asy = 466.5141 mm2
Area of steel provided,Asx = 754 mm2 Asy = 754 mm2
I) Check for one way shear at distance "d" from face of column l1
b
Shear force per metre , V 83500 N , V=qu*z & z =((x-b)/2)-d Y
c
Nominal shear stress,v =V/bd= 0.162136 N/mm2 b=1000mm
Design concrete shear stress,vc (Table 3.9,BS 8110) = 0.632(100As/bd)1/3(400/d)1/4 l2 d
100As/b'd 0.146408 < 3,use = 0.146408 400/d = 0.776699 >1,use = 1
vc = 0.333311 N/mm2 > v OK z
X
ii) Punching shear
At Face of column X
Perimeter ,bo = 3200 mm
b1
Shear
force,V= qu*Ap' = 1161 kN Ap'=(Ap-b*c/1000000) b
Y
Nominal shear stress,v =V/bo*d = 0.70449 N/mm2 c c1
1.5d
< .8sqrtFc or 5 N/mm2 O.K
At 1.5d from face of the column = 772.5 mm
Perimeter bo = 9380 mm
Shearing area = as = 5.499025 m2 as = b1 x c1
Shear Force V = 675.0975 kN V=qu(Ap-as)
Nominal shear stress, v = V/bo*d = 0.139751 < vc
O.K
DESIGN OF FOUNDATION F
Owner : Plot No:
Fcu = 40 N/mm2 Fy = 460 N/mm2
Ultimate load, Pu = 410 kN S.B.C = 100 kN/m2
Area of footing required,(1.1*Pu)/(1.45*SBC 3.110345 m2
Side of footing,square = 1.763617 m
Size of footing provided , X = 1.80 m Y = 1.80 m
Actual area provided,Ap 3.24 m 2
The net earth pressure acting upward due to fact. load , qu=Pu/Ap 126.5432 kN/m2
Assuming overall depth of footing ,D = 400 mm, cover (mm ) = 50 dia of bar 12
Effective depth, dx = 344 mm 332 mm
Size of column , b = 200 mm c= 400 mm
Mx =(qu*l1 )/2
2
= 40.49383 My =(qu*l2 )/2
2
= 31.00309 kN-m
K =M/(b*d^2*Fcu) Kx = 0.011406 Ky = 0.0093758 , If K <= K',comp. steel not reqd.K' =0.156
Lever arm,z = d[0.5+sqrt{0.25-(K/0.9)}] zx = 339.5835 zy = 328.5046
Area of steel reqd,As =M*10^6/(.87*Fy*z) , Asx = 297.96494 mm2 Asy = 235.8231 mm2
Area of steel provided,Asx = 754 mm2 Asy = 754 mm2
I) Check for one way shear at distance "d" from face of column l1
b
Shear force per metre , Vx 57703.7 N , Vx=qu*z1 & z1 =((X-b)/2)-dx Y
c
Nominal shear stress,vx =Vx/bd 0.167743 N/mm2 b'=1000mm
Design concrete shear stress,vcx (Table 3.9,BS 8110) = 0.632(100Asx/bd)1/3(400/dx)1/4 l2 d
100Asx/b'd 0.219186 < 3,use = 0.219186 400/dx = 1.1627907 >1,use = 1.16
vcx = 0.39566 N/mm2 > vx OK z1
X
Shear force per metre , Vy 46567.9 N , Vy=qu*z2 & z2 =((Y-C)/2)-dy
Nominal sh. stress,vy =Vy/bdy= 0.140265 N/mm2 b=1000mm
Design concrete shear stress,vcy (Table 3.9,BS 8110) = 0.632(100Asy/bdy)1/3(400/dy)1/4
100Asy/b'd 0.227108 < 3,use = 0.227108 400/dy = 1.2048193 >1,use = 1.2
vcy = 0.403774 N/mm2 > vy OK
ii) Punching shear
At Face of column X
Perimeter ,bo = 1200 mm
b1
Shear
force,V= qu*Ap' = 399.8765 kN Ap'=(Ap-b*c/1000000) b
Y
Nominal shear stress,v =V/bo*d = 0.968693 N/mm 2 c c1
1.5d
< .8sqrtFc or 5 N/mm O.K
2