TENDER DOCUMENTS HVAC WORK

GUIDELINE BILL OF QUANTITIES

Working Items
Number At Least 3 Unit Rates Total
section No. Description Unit Qty Vendors
S.R. SR.
General notes:
1
Supplying installing and commissioning of a complete system
of Air condition system, ductwork, all piping, fittings and
controls as herein specified and shown on plans. Price for
system shall include all required equipment accessories, pipe
sleeves & Escutcheons, Equipment identification, tools &
spare parts, protective painting of all systems ...etc.

2 Specification, drawings, and bill of quantities are


complimentary and are to be taken together for complete
interpretations of the work.
3 In case of conflict between contract document, please refer to
the engineer for clarification.

4 Quantities, include in this bill of quantities is for guidance, the


contractor shall check and verify all quantities.
5 The contractor should include in his offer all required materials
needed for optimum operation whatever or not mentioned in
the bill of quantity.
6 Responsibility of contractor is to ensure that all works are in
conformity with international stated codes and local
regulations.
7 Contractor should include in his offer all equibment civil base
,builder works ,openings, Excavation, backfilling and
firebariers materials.
8 Item prices should include only the spare parts for electrical
fueses and recommended spare parts within the first year
operation except otherwise noted clearly in the BOQ

TO SUMMARY

Page 1 of 11
TENDER DOCUMENTS HVAC WORK
GUIDELINE BILL OF QUANTITIES

Working Items
Number At Least 3 Unit Rates Total
section No. Description Unit Qty Vendors
S.R. SR.
1 AIR COOLED SCREW CHILLER
Supplying, installing, connecting, testing and commission of
air cooled screw chillers including all required hook up valves,
contols, accessories, equipment base, control panel,
instruments, supports, and fittings required for proper
operation and installation as shown on drawing:
Note: ΔT(CHWO - CHWI) is 12 ºF
1.1 ACCH-01 / Capacity 450 ton at ambient temp 115ºF No. 4

2 CHILLED WATER PUMP


Supplying, Installing, Connecting, Testing and Commission of
Horizontal Split Case Chilled Water Pump C/W base coupling
guard, open drip proof motor, valves, fittings, control and all
other accessories as per drawings and specifications

2.1 Variable speed Pumps 900 GPM, Head 180 Ft. No. 5

3 EXPANSION TANKS
3.1 Supplying, Installing, Connecting, Testing and Commission of
closed expansion tanks C/W valves, fittings , vessle, pump,
control unit, electrical work and all other accessories as shown
on drawings and specifications.

3.1.1 Chilled water system 1000 Liter No. 1

4 WATER TREATMENT
4.1 Supplying, Installing, Connecting, Testing and Commission of
water treatment system C/W all accessories and components
specifications for :
4.1.1 Chilled Water treatment unit Sys. 1

5 AIR SEPARATOR
5.1 Supplying, Installing, Connecting, Testing and Commission of
air separator 14 inch C/W valves, fittings and all other
accessories as shown on drawings and specifications No. 1
6 AIR HANDLING UNIT
6.1 Supplying, Installing, Connecting, Testing and Commission of
Air Handling Unit C/W fresh air intake, supply fan, chilled
water coil, Pre filter section, bag filter section,mixing box,
supply plenum, all hookup, control valves, all electrical works
and all accessories as shown on drawings and specifications :

6.1.1 AHU-01 3500 CFM, 9 TR. No. 2


6.1.2 AHU-02 4000 CFM, 10 TR. No. 1
6.1.3 AHU-04 5600 CFM, 14 TR. No. 1
6.1.4 AHU-05 9600 CFM, 24 TR. No. 1
6.1.5 AHU-07 22000 CFM, 55 TR. No. 1
TO SUMMARY

Page 2 of 11
TENDER DOCUMENTS HVAC WORK
GUIDELINE BILL OF QUANTITIES

Working Items
Number At Least 3 Unit Rates Total
section No. Description Unit Qty Vendors
S.R. SR.
6.2 Ditto as above but provided with Variable Speed Drive
(VSD)
6.2.1 AHU-03 5400 CFM, 13.5 TR. No. 1
6.2.2 AHU-06 20000 CFM, 50 TR. No. 1

7 FRESH AIR HANDLING UNIT


7.1 supplying, installing, connecting,Testing and Commission of
Chilled Water Fresh Air Handling Unit complete with fresh air
intake, supply fan, chilled water coil, Pre filter section,bag filter
section, supply plenum, valves, control valves, all electrical
works all accessories as shown on drawings and
specifications :
7.1.1 FAHU-01 2000 CFM, 11 TR. No. 1
7.1.2 FAHU-04 3000 CFM, 17 TR. No. 1
7.1.3 FAHU-06 3500 CFM, 19.5 TR. No. 1
7.1.4 FAHU-07 5000 CFM, 28 TR. No. 1
7.1.5 FAHU-08 5150 CFM, 28.5 TR. No. 1
7.1.6 FAHU-09 5300 CFM, 29.5 TR. No. 1
7.1.7 FAHU-12 7000 CFM, 39 TR. No. 2
7.1.8 FAHU-15 12000 CFM, 67 TR. No. 4
7.1.9 FAHU-16 15500 CFM, 86 TR. No. 1
7.1.10 FAHU-17 16000 CFM, 90 TR. No. 1
7.1.11 FAHU-18 20000 CFM, 111 TR. No. 1

7.2 Ditto as above but provided with HEPA filter

7.2.1 FAHU-02 2250 CFM, 12.5 TR. No. 1


7.2.2 FAHU-03 2520 CFM, 14 TR. (C/W VSD) No. 1

7.2.3 FAHU-05 3000 CFM, 17 TR. No. 4


7.2.4 FAHU-10 5900 CFM, 33 TR. No. 1
7.2.5 FAHU-11 6600 CFM, 36.5 TR. No. 1
7.2.6 FAHU-13 7000 CFM, 39 TR. (C/W VSD) No. 1

7.2.7 FAHU-14 9800 CFM, 54.5 TR. No. 1

TO SUMMARY

Page 3 of 11
TENDER DOCUMENTS HVAC WORK
GUIDELINE BILL OF QUANTITIES

Working Items
Number At Least 3 Unit Rates Total
section No. Description Unit Qty Vendors
S.R. SR.
8 FAN COIL UNIT
8.1 Supplying, Installing, Connecting, Testing and Commission of
two pipe Ceiling Mounted Chilled water Fan Coil Units C/W
chilled water coil, fan, filter, valves, control, all electrical works
(components, wiring, etc.) and all accessories as shown on
drawings and specifications .

8.1.1 FCU-01 400 CFM , 1 TR (Chilled Water) No. 205


8.1.2 FCU-02 600 CFM , 1.5 TR (Chilled Water) No. 70
8.1.3 FCU-03 800 CFM , 2 TR (Chilled Water) No. 174
8.1.4 FCU-04 1000 CFM , 2.5 TR (Chilled Water) No. 53
8.1.5 FCU-05 1200 CFM , 3 TR (Chilled Water) No. 64
8.1.6 FCU-06 1400 CFM , 3.5 TR (Chilled Water) No. 60
8.1.7 FCU-07 1600 CFM , 4 TR (Chilled Water) No. 20
8.1.8 FCU-08 1800 CFM , 4.5 TR (Chilled Water) No. 14
8.1.9 FCU-09 2000 CFM , 5 TR (Chilled Water) No. 31

9 DX HI WALL UNIT
9.1 Supplying, installing,connecting,testing and commission of Hi
Wall split units c/w referigerant pipes with standerd and extra
length between Hi Wall split units & compresor, electrical and
control cables berweenHi Wall split units and compressor,
piping insulations, controls and accessories as shown on
drawings:
9.1.1 S.P.U-01/CU-01 (12000 BTU/HR) No. 15
9.1.2 S.P.U-02/CU-02 (18000 BTU/HR) No. 13
9.1.3 S.P.U-03/CU-03 30000 BTU/HR) No. 2

TO SUMMARY