Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Oteco Inc. 3" Reset Relief Valve 3" LPT Inlet & Outlet Installation & Maintenance Manual PART NO. 130350

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

Page 1 of 9

Oteco Inc. Houston, Texas Manual: OS-130350 Rev.B


3” Reset Relief Valve Maintenance Revision Date: 5/27/15
Issued: B.H. Date: 8/25/08 Approved: WU Date: 8/25/08

OTECO INC.
3” RESET RELIEF VALVE
3” LPT INLET & OUTLET
INSTALLATION & MAINTENANCE
MANUAL
PART NO. 130350

___________________________________________________________________________________
OTECO, Inc. – P.O. Box 1849 – Houston, Texas USA 77251 – Phone 713-695-3693 Fax 713-695-3520
Web Address: www.oteco.com
Page 2 of 9
Oteco Inc. Houston, Texas Manual: OS-130350 Rev.B
3” Reset Relief Valve Maintenance Revision Date: 5/27/15
Issued: B.H. Date: 8/25/08 Approved: WU Date: 8/25/08

TABLE OF CONTENTS

1. PERIODIC MAINTENANCE

2. SPARE PARTS LIST

3 PROCEDURES FOR REPLACEMENT OF SEALS

4. PROCEDURES FOR MAINTENANCE AND REPAIR


OF BONNET ASSEMBLY

5. PARTS LIST

6. EXPLODED DRAWING

7. INSTALLATION DRAWING

___________________________________________________________________________________
OTECO, Inc. – P.O. Box 1849 – Houston, Texas USA 77251 – Phone 713-695-3693 Fax 713-695-3520
Web Address: www.oteco.com
Page 3 of 9
Oteco Inc. Houston, Texas Manual: OS-130350 Rev.B
3” Reset Relief Valve Maintenance Revision Date: 5/27/15
Issued: B.H. Date: 8/25/08 Approved: WU Date: 8/25/08

1.0 PERIODIC MAINTENANCE

WEEKLY
1. Unseat valve by striking release button at rear of valve.
Release pressure in system to 0 PSI and reset valve with
reset lever.

6 MONTHS

1. Lubrication-Remove 1/8 plastic pipe plug located behind


right load spring on bottom of bonnet. Pump grease through
grease fitting until new grease comes out of 7/16 hole.
Replace 1/8 plastic pipe plug.

2. Replace seals as required.

12 MONTHS

1. Lubrication-Clean bonnet assembly and repack with new


grease.

2. Replace parts and seals as required

___________________________________________________________________________________
OTECO, Inc. – P.O. Box 1849 – Houston, Texas USA 77251 – Phone 713-695-3693 Fax 713-695-3520
Web Address: www.oteco.com
Page 4 of 9
Oteco Inc. Houston, Texas Manual: OS-130350 Rev.B
3” Reset Relief Valve Maintenance Revision Date: 5/27/15
Issued: B.H. Date: 8/25/08 Approved: WU Date: 8/25/08

2.0 SPARE PARTS LIST

SEALS FOR 6 MONTHS NORMAL OPERATION

QUANTITY DESCRIPTION PART NO.


1 Cushion Ring 143130
1 Outer Seal 302686
1 “O” Ring 143150
1 Inner Seal 302687
(4 above parts, Oteco repair kit 143215)
1 Stem Bushing O-ring, outside 302750
1 Stem Bushing O-ring, inside 302752

REPAIR PARTS FOR 12 MONTHS NORMAL OPERATION

QUANTITY DESCRIPTION PART NO.


2 Cushion Ring 143130
2 Outer Seal 302686
2 “O” Ring 143150
2 Inner Seal 302687
(4 above parts, Oteco repair kit 143215, qty.2)
2 Stem Bushing O-ring, outside 302750
2 Stem Bushing O-ring, inside 302752
1 Top Crank Pin 142200
2 Link Pins 142403
2 Bearing f/Upper Link 142423
and Piston
2 Bearing f/Bonnet 142424
2 Bearing f/Crank 142422
1 Bearing f/Bonnet Cover 142425
5 Spiral Pin 1/8 X 5/8 142432
1 Spiral Pin 1/4 X 1-1/2 142435
1 Spiral Pin 5/16 X 1-3/8 142434

___________________________________________________________________________________
OTECO, Inc. – P.O. Box 1849 – Houston, Texas USA 77251 – Phone 713-695-3693 Fax 713-695-3520
Web Address: www.oteco.com
Page 5 of 9
Oteco Inc. Houston, Texas Manual: OS-130350 Rev.B
3” Reset Relief Valve Maintenance Revision Date: 5/27/15
Issued: B.H. Date: 8/25/08 Approved: WU Date: 8/25/08

2.0 SPARE PARTS LIST (continued)

REPAIR PARTS FOR MAJOR REBUILD

QUANTITY DESCRIPTION PART NO.


1 Cushion Ring 143130
1 Outer Seal 302686
1 “O” Ring 143150
1 Inner Seal 302687
1 Piston/Bearing assy. 143110
1 Stem Bushing 143140
1 Inner Retainer 143160
1 Outer Retainer 143170
(8 above parts, Oteco major repair kit 143216)
1 Top Crank Pin 142200
2 Link Pins 142403
2 Bearing f/Bonnet 142424
2 Bearing f/Crank 142422
1 Bearing f/Bonnet Cover 142425
5 Spiral Pin 1/8 X 5/8 142432
1 Spiral Pin 1/4 X 1-1/2 142435
1 Spiral Pin 5/16 X 1-3/8 142434

___________________________________________________________________________________
OTECO, Inc. – P.O. Box 1849 – Houston, Texas USA 77251 – Phone 713-695-3693 Fax 713-695-3520
Web Address: www.oteco.com
Page 6 of 9
Oteco Inc. Houston, Texas Manual: OS-130350 Rev.B
3” Reset Relief Valve Maintenance Revision Date: 5/27/15
Issued: B.H. Date: 8/25/08 Approved: WU Date: 8/25/08

3.0 REPLACEMENT OF SEALS: Ref. Drawings 15442 and 19699

DISASSEMBLY

1. Remove pressure from relief valve.

2. Remove valve from piping system and grip in vise.

3. Remove (4) cap screws (item 7). Lift piston and bonnet
assembly away from body (item 37).

4. Unscrew sub (item 48) from body (item 37). Remove inner
retainer (item 43) and inner piston seal (item 44) from sub.

5. Remove internal parts from body (items 45, 46 and 47).

6. Thoroughly clean body, sub and parts. CAUTION: If grit


blast is used, protect threads and seal surfaces from erosion.

7. Inspect all parts for wear or damage. Replace with new parts
as needed.

___________________________________________________________________________________
OTECO, Inc. – P.O. Box 1849 – Houston, Texas USA 77251 – Phone 713-695-3693 Fax 713-695-3520
Web Address: www.oteco.com
Page 7 of 9
Oteco Inc. Houston, Texas Manual: OS-130350 Rev.B
3” Reset Relief Valve Maintenance Revision Date: 5/27/15
Issued: B.H. Date: 8/25/08 Approved: WU Date: 8/25/08

3.0 REPLACEMENT OF SEALS: (continued)

ASSEMBLY

1. Apply a light coat of grease to items 43, 44, 45, 46 and 47.

2. Install piston inner seal (item 44) onto sub (item 48).
Secure seal with inner retainer (item 43), tighten inner
retainer to 55 ft-lbs torque.

3. Install outer retainer (item 45), outer seal (item 47) and
“O” ring (item 46) into body (item 37).

4. Install body sub (item 48) into body (item 37). Tighten
body sub to 600 ft-lbs torque.

5. Apply a light coat of grease to small diameter of piston


(item 42) extending from bonnet assembly. Install cushion
ring (item 41) onto piston (item 42). Beveled end of
cushion should be facing toward large diameter of piston.

6. Install bonnet assembly onto body assembly. Use screw


driver to start entry of cushion ring into body.

7. Install (4) socket head screws (item 7). Tighten to


50 ft-lbs torque.

8. Pressure test valve for correct operation before installing into


system. Precautions should be taken to protect personnel
while testing.

___________________________________________________________________________________
OTECO, Inc. – P.O. Box 1849 – Houston, Texas USA 77251 – Phone 713-695-3693 Fax 713-695-3520
Web Address: www.oteco.com
Page 8 of 9
Oteco Inc. Houston, Texas Manual: OS-130350 Rev.B
3” Reset Relief Valve Maintenance Revision Date: 5/27/15
Issued: B.H. Date: 8/25/08 Approved: WU Date: 8/25/08

4.0 REPAIR OF BONNET ASSEMBLY: Ref. Drawings 15442 and 19699

DISASSEMBLY

1. Remove pressure from relief valve.

2. Remove valve from piping system and grip in vise.

3. Remove adjusting nut (item 1) and upper spring retainer (item 4).

4. Remove load springs (item 31).

5. Remove (4) socket head cap screws (item 7) from bonnet (item 34).

6. Remove bonnet cover assembly (item 9).

7. Remove (4) socket head cap screws (item 7) from body (item 37)
and lift bonnet assembly from body.

8. Remove old grease from bonnet assembly and bonnet cover


assembly. Clean with solvent.

9. Inspect and replace worn parts as needed.

___________________________________________________________________________________
OTECO, Inc. – P.O. Box 1849 – Houston, Texas USA 77251 – Phone 713-695-3693 Fax 713-695-3520
Web Address: www.oteco.com
Page 9 of 9
Oteco Inc. Houston, Texas Manual: OS-130350 Rev.B
3” Reset Relief Valve Maintenance Revision Date: 5/27/15
Issued: B.H. Date: 8/25/08 Approved: WU Date: 8/25/08

4.0 REPAIR OF BONNET ASSEMBLY (Continued)

ASSEMBLY:

1. Apply a light coat of grease to small diameter of piston (item 42)


extending from bonnet assembly. Install cushion ring (item 41) onto
piston (item 42). Beveled end of cushion should be facing toward
large diameter of piston.

2. Install bonnet assembly onto body assembly. Use screwdriver to


start entry of cushion ring into body.

3. Install (4) socket head screws (item 7). Tighten to 50 ft-lbs torque.

4. Repack upper part of bonnet assembly (item 34) with Lubriplate


Lo – Temp grease, or equivalent. Approximately 16 oz. is required.

5. Install bonnet cover assembly (item 9) onto bonnet assembly


(item 34) using (4) socket head cap screws. Tighten to 50 ft-lbs.
torque.

6. Install (2) load springs (item 31).

7. Install upper spring retainer (item 4).

8. Install adjusting nut (item 1). Tighten nut to obtain desired relief
pressure as indicated by pressure relief scale.

9. Pressure test valve for correct operation before installing into


system. Precautions should be taken to protect personnel while
testing.

___________________________________________________________________________________
OTECO, Inc. – P.O. Box 1849 – Houston, Texas USA 77251 – Phone 713-695-3693 Fax 713-695-3520
Web Address: www.oteco.com

You might also like