Dike 18 - Raising 2019 works Ch. 6+900 to Ch. Weather Report No.

90
8+300 and Ch. 9+250 to Ch. 10+750 7 am - 11 am - 3 pm -
Employer : Arab Potash Company Time Date 16-Jun-2020 Monday
11 am 3 pm 7 pm
Consultant : Royal Haskoning DHV Temperature 38°C 41°C 38°C Shift Day ✓ Night x
Contractor : ZTC Weather
Condition Sunny Temperature min: 38°C max: 41°C
work work
Description No. Description No. Description No. ing Description No. ing
Project Manager 1 Cook 0 Generators 1
Construction Manager 1 Site Engineer (Aces) 1 Vibrators 0
QS/Planning Engineer 1 lab technician 1 Dozers 2
Admin & logistic Manager 1 Office engineer 1 Excavators 3
Doc. Controller 1 Loaders 4
A. Labor force

B. Equipment
H.S.E Manager 1 Screening Plants 1
Surveyor 1 Graders 1
Surveyor Assistance 1 Trucks 3
Site Forman 1 Mobile Cranes 0
Accountant 1 Compactor 2
QA/QC / Geo. Engineer 1 Lowbed 0
Supervisor 0
Drivers 3
Operators 12
Flagman 1
Workers 0
Total man Hour 270
Executed Works / Performance:
No. Description UoM Remarks

1 Processing and stockpiling of zone 3 ,Zone 1B and Zone 2 material at borrow area`s

2 Placing and compacting of wet zone 1B material layer No.2 from Ch 10+000 to Ch10+270

3 Placing and compacting of zone 1B material layer No.2 from Ch 09+250 to Ch 09+400

5 Salt crust break up, clean and scarify


C. Executed works

6 Maintance of the roads

SL. Job Description Daily Trips Total Trips Unit Daily Quantity Cumulative Quantity
1
2
3

Constraints /
Delays / Incidents

Unplanned Events /
Add. Works /
Instructions

Qty Description Remarks Name / Surname


Material

Visitors
E. Site
D.

H. Engineer Representative
Contractor Note

Note

Contractor: ZTC Consultant : Royal Haskoning DHV

Date / Signature Date / Signature

You might also like