Escalator: Field Method Manual
Escalator: Field Method Manual
Escalator: Field Method Manual
OTIS Maintenance
Sect.: 12.1
Escalator OTIS 506 NCE Page: Cover
Date: 05 /99
Escalator
Document History
Revision Description of changes
No Date Department
Cover sheet added.
1 09.02 SW - CSS Pegasus ID No. 506NCE_EN_FM2 on cover sheet added.
Copyright 1999, OTIS GmbH Berlin
company private
OTIS Field Method Manual
Maintenance
Part:
No:
4
G 9171M01
Sect.: 12.1
Page: 1/82
Escalator OTIS 506 NCE
Date: 05/99
Index
Maintenance Pages
12.1.3 Place 3-checking & maintenance of controller 35-39
12.1.3.1 Testing of controller NCE1B, NCE 2 35-36
12.1.3.2 Testing of µp-controller 37-39
12.1.4 Place 4-Examination & maintenance of machine 40-48
12.1.4.1 Machine EC H3 40-43
12.1.4.1.1 Examination of machine 40
12.1.4.1.2 Examination of safety equipment 41
12.1.4.1.3 Examination of oil quality 41-42
12.1.4.1.4 Change Oil 42-43
12.1.4.2 Machine 16VEC-RH 44-46
12.1.4.2.1 Examination of machine 44
12.1.4.2.2 Examination of safety equipment 45
12.1.4.2.3 Change Oil 45-46
12.1.4.3 Examination of overspeed switch EC H3 47
12.1.4.4 Examination of overspeed switch EC H3 48
12.1.5 Place 5-Lower landing outside 49-57
12.1.9.2 Examination of distance 24
12.1.9.3 Final works 24
12.1.10 Examination of safety equipment 25-39
12.1.10.1 Preparation 25
12.1.10.2 Examination of the comb plate safety device 25-26
12.1.10.3 Examination of the handrail entry device 27
12.1.10.4 Examination of the operation panel with 28
starting key switch
Copyright 1999, OTIS GmbH Berlin
Maintenance Pages
12.1.10.5 Examination of non reversal device 29-30
12.1.10.6 Examination of main drive chain control contact 31
12.1.10.7 Examination of emergency brake switch 32
12.1.10.8 Examination of broken step and chain wheel 33-34
control contact
12.1.10.9 Examin. of step chain roller monitoring switch 35
12.1.10.10 Examination of broken step chain device 36
12.1.10.11 Examination of circuit breaker 37
12.1.10.12 Examination of intermittend operation 38
12.1.10.13 Examination of barrier against climbing 39
12.1.10.14 Final works 39
12.1.11 Examination of light fixtures 40-42
12.1.11.1 Preparation 40
12.1.11.2 Examination of skirt panel lighting 40
12.1.11.3 Examination of under step lighting 40
12.1.11.4 Examination of traffic light 41
12.1.11.5 Examination of direction indicator 42
12.1.11.6 Final works 42
12.1.12 Examinations during run 43-44
12.1.12.1 Preparation 43
12.1.12.2 Examination during run 43
12.1.12.3 Examination of handrails 44
12.1.12.4 Examination of steps 44
Copyright 1999, OTIS GmbH Berlin
Maintenance Pages
12.1.13 Cleaning, examination and lubrication of drive
parts 45-51
12.1.13.1 Preparation 45
12.1.13.2 Examination of main drive 45
12.1.13.3 Examination of tension carriage 46
12.1.13.4 Examination of handrail drive system 47-50
12.1.13.5 Examination of distance between steps 50-51
12.1.13.6 Final works 51
12.1.14 Examination of snap pins and lubrication of
step bushings 52-53
12.1.14.1 Preparation 52
12.1.14.2 Examination of steps and lubrication of step
bushings 52-53
12.1.14.3 Final activities 53
12.1.15 Examin. of automatic lubrication equipment 54-55
12.1.15.1 Preparation 54
12.1.15.2 Examin. of interval lubrication 54
12.1.15.3 Examin. of time lubrication 55
12.1.15.4 Final works 55
12.1.16 Lubrication plan 56
12.1.17 Lubricants 57
12.1.18 Special tooling 58-60
Copyright 1999, OTIS GmbH Berlin
Field Method Manual Maintenance 506 NCE visits per year monthly 2 monthly 3 monthly
OTIS visit intervals 12x 4x 2x 1x 6x 2x 2x 1x 4x 2x 2x 1x
place description, component FMM contract L POG(P) OM(O) L L P P O O A B C D A B C D A B C D
interv maintain, check page check on (A=adjust; R=replacement) A R A R A R
basic intervals, symbols 5-7
safety measurements 8-10 X X X
1 upper landing outside
A floor plates, floor plate covering,comb plate,comb, condition,fastening screws on tight fitting X X X
C comb plate safety device function X X X X X
B intermittend contact function X X X X X X X
B under step lighting condition,function X X X X X
B handrail entry device function X X X
OTIS
U:/Anders/Binder/Treppe/MHBNCE/Ort1_maintNCE_neu/FOD-FIE/03.5.99
D main drive cleanliness,lubrication X X X
3 controller
D controller (relay coils; auxiliary switch; contacts; fuses ... cleanliness, condition, function X X X X X
D ETA+ function X X X
4 machine
A machine cleaning,oil level, sealing, unusual noise X X X
A brake fastening, mobility, wear down X X X X X
A overspeed switch condition, function X X X X
A safety equipments fast seat, adjustment X X X X X
A oil quality X X X
5 lower landing outside
A floor plates, floor plate covering,comb plate,comb, condition,fastening screws on tight fitting X X X
C comb plate safety device function X X X
B intermittend contact function X X X X X X X
B under step lighting condition,function X X X X X
General
company private
G 9171M01
ON sample test
switch ON test by removal of
OFF and OFF pulling oil
vision test by
test pressing, lubricating
moving
noise
test measuring loosen/tighten
measure test by
time run pressing on refill oil
Continuation
inspection
wrench key
switch test
key plug by foot
pressure
Copyright 1999, OTIS GmbH Berlin
Remark to 5.:
A lifting device from Otis factory Stadthagen under the tooling no. 26201 M1
can be obtained.
Controller not lay
2. Final work
1. Remove revision control and plug in blind plug.
2. Lift controller in the landing (for intermittend operation, operate in addition
the maintenance switch "S30").
3. Switch on main switch. (remove lock)
4. Close landing.
5. Take off blocking on landing.
6. Set escalator via key switch in operation.
upper landing
lower landing
stop button
Continuation
1.2 2.5
1.3 2.4
floor plate
lifting device
WZ GAA 27 BW1
controller
inspection plug adapter
terminal block IBL/X6
tool GAA 27 EA 1
assistance
for main swich
Continuation
Achtung :
Achtung !
Hauptschalter ausschalten
Landestelle nicht betreten
spring
Copyright 1999, OTIS GmbH Berlin
In emergency cases the step band can be moved by hand with a supplied handwheel.
1. Release screws on the ventilator cover and take off the cover (1).
2. Set the handwheel (2) on the motor shaft.
3. Release brake through operating lever (3).
4. Run pallet band by turning the handwheel (2) in the requested direction.
5. Release brake lever (3).
6. Take off handwheel (2) and erect ventilator cover (1).
On
main switch
(1) ventilator Off
cover
screws
handwheel
ventilator
Copyright 1999, OTIS GmbH Berlin
brake magnet
frame
fastening screws
Copyright 1999, OTIS GmbH Berlin
3. Start escalator via key switch (upper landing in up- and lower
landing in down-direction)
Continuation
3 LCSU=S1
RCSU=S2
3
Copyright 1999, OTIS GmbH Berlin
Continuation
intermittend operation
Copyright 1999, OTIS GmbH Berlin
RHSL=S21
LHSL=S22
RHSU=S23
LHSU=S24
Copyright 1999, OTIS GmbH Berlin
Key switch
LED
stop button
Copyright 1999, OTIS GmbH Berlin
8. Visual traffic light / direction indicator on condition and function (test interval B)
1. Test the direction display on function
direction indicator
partition web
Copyright 1999, OTIS GmbH Berlin
LED´s
arrangement in centre in inclined
range of escalator on one of the two
exterior balustrade covering profiles
tool 5365
Copyright 1999, OTIS GmbH Berlin
10
Copyright 1999, OTIS GmbH Berlin
11
Constant maintenance:
Apply cleaner and sealing - diluted with water - with a humid cloth.
Copyright 1999, OTIS GmbH Berlin
1. Preparation
See page 08, points 1.1 to 1.2.
- Remove dust and clean with a soft, possibly lightly humid cloth.
- Apply varnish cleaner with a soft cloth.
- After cleaner is dry, do further polishing with a soft clean cloth,
for removing the slight fog coming from this cleaner.
Attention
Use no means which possibly remove material. The applied
cloth must be clean and free of other chemical products.
Avoid scratches through dust or dirt.
Varnish sealed surfaces may not be cleaned with solvent.
Continuation
3. Maintenance instruction for stainless steel:
- After removing the protection foils, clean the surface with a bit alcohol,
wipe it with a foam cleaner and after that with clean water.
- Remove remainder of lime with vinegar or acetic acid cleaner (for
example aluminium powder) and soap water.
Attention:
Avoid steel wool, hard brushes and chloric products with
scouring powder.
6. Final works
See page 08, points 2.5 to 2.6.
Copyright 1999, OTIS GmbH Berlin
1
Copyright 1999, OTIS GmbH Berlin
main switch
controller MS/Q01
Copyright 1999, OTIS GmbH Berlin
R
3 3
old version
knurl screws
knurl screws
inspection glass
Copyright 1999, OTIS GmbH Berlin
3
A
B
B
Pipe
new version
Copyright 1999, OTIS GmbH Berlin
1 pump
tank inlet
Copyright 1999, OTIS GmbH Berlin
tank
Continuation
2. Examination of automatic lubrication equipment
"time lubrication"
2
main drive chain
nozzle
nozzle
tank
pump
step chain
Copyright 1999, OTIS GmbH Berlin
- Set back main drive chain control contact and start again.
BDC=S28
5
sliding shoe
U:/Anders/Binder/Treppe/MHBNCE/Ort2_maintNCE_neu/FOD-FIE/03.5.99
supersedes 05/95 company private
OTIS Field Method Manual
Maintenance
Part:
No:
4
G 9171M01
Sect.: 12.1
Page: 33/82
Escalator OTIS 506 NCE
Date: 05/99
place 2 - Machine room
7
Copyright 1999, OTIS GmbH Berlin
supersedes 05/95
1. Clean bearing of main drive shaft and lubricate on both sides via
lubrication nipple with grease press.
2. Wipe off old oil and consider afterwards the environmental regulations.
lubrication nipple
Copyright 1999, OTIS GmbH Berlin
1. Open door
2. Components (relays, LED etc.)Vision test on damages, burn and cable
in the basic plate on tight fitting.
3. Clean components with dust brush.
4. Testing module ETA + on function
- turn on main switch
- start escalator in down-direction
1 NCE 1b controller
width = 380 mm controller door
blind plug
(IBP)
Copyright 1999, OTIS GmbH Berlin
off-hand sample
Continuation
1
NCE 2 Controller
off-hand samples
Copyright 1999, OTIS GmbH Berlin
new since 06 / 99
2. Testing of µp-controller on general condition and cleaning
1. Open door
2. Components (relays, LED, trafo etc.)
Vision test on damages, burn and cable on tight fitting.
- pull off plugs P1 - P5 and P 10 - P 15 on the printed circuit board
- open quick locking device and remove printed circuit board
3. Clean components with dust brush
4. Insert printed circuit board, close quick locking device and put on plug
5. Close door and clean housing with cloth
wide
Tooling: Standard maintenance tooling, SV-tool
µP 1 = 380 mm wide
µP 2 = 600 mm wide
Copyright 1999, OTIS GmbH Berlin
2 off-hand sample
section C-C
bushing
(first insert bushing, then head)
section B-B
Copyright 1999, OTIS GmbH Berlin
Continuation
2 off-hand sample
section A-A
Copyright 1999, OTIS GmbH Berlin
1. Examination of machine
brake arm
split
Continuation
2. Examination of safety equipments
1. Test tight fitting and distance.
Continuation
4. Oil change
1. Turn on main switch and set escalator into function
(oil should be warm)
2. Functional test of oil pump
- release control screw during gear run
Copyright 1999, OTIS GmbH Berlin
Continuation
old oil
measuring rod
Öl drip pan oil inlet Dn:18,6 mm
filling hole
Remedies: Oil drip pan, oil pressure tubing 1/2" transparent, oil pump (suction height
max. 3 m, pressure max. 3 bar, dry run max. 30 sec.), tank for old oil
new since 06 / 99
4.2 16VEC-RH
1. Examination of machine
refill oil
brake arm
Continuation
2. Examination of safety equipments
1. Test tight fitting and distance.
2
brake function control dimension control device for
between magnet lifting rod brake operation and brake lining wear
and brake arm
1,5 mm
Continuation
old oil
measuring rod
Öl drip pan
Remedies: Oil drip pan, oil pressure tubing 1/2" transparent, oil pump (suction height
max. 3 m, pressure max. 3 bar, dry run max. 30 sec.), tank for old oil
1
ventilation cover
resetting button
releasing lever
switch
ventilator OS=S27
opening
governor
Copyright 1999, OTIS GmbH Berlin
new since 06 / 99
4.4 Examination of overspeed switch 16VEC-RH
(test interval B)
1. Testing of overspeed switch on tight fitting and function without load
1. Release screws of ventilation cover on motor and take off ventilation cover.
2. Release the overspeed switch by pressure against the releasing
lever (switch will be arrested).
3. Turn on main switch and start escalator in both directions.
4 mm
Copyright 1999, OTIS GmbH Berlin
frame
fastening screws
Copyright 1999, OTIS GmbH Berlin
3. Start escalator via key switch (upper landing in up- and lower
landing in down-direction)
Continuation
3
LCSL=S16
RCSL=S17
Continuation
intermittend operation
Copyright 1999, OTIS GmbH Berlin
RHSL=S21
LHSL=S22
RHSU=S23
LHSU=S24
Copyright 1999, OTIS GmbH Berlin
new since 06 / 99
Key switch
stop button
Copyright 1999, OTIS GmbH Berlin
8. Visual traffic light / direction indicator on condition and function (test interval B)
1. Test the direction display on function
direction indicator
partition web
Copyright 1999, OTIS GmbH Berlin
LED´s
arrangement in centre in inclined
range of escalator on one of the two
exterior balustrade covering profiles
tool 5365
Copyright 1999, OTIS GmbH Berlin
socket
junction box
Copyright 1999, OTIS GmbH Berlin
1. Test thread bar for the pressure springs as well as the sliding
surfaces of tension carriage on condition on both sides.
2. Test pressure springs on condition, adjustment and tight
fitting of nuts.
6.2
sliding block
grease
sliding surface
thread bar
pressure spring
Copyright 1999, OTIS GmbH Berlin
6.3
Copyright 1999, OTIS GmbH Berlin
reset button
1. Preparation
- turn off circuit breaker in the lower landing
- plug in revision control on terminal
snap pins
safety rings
Copyright 1999, OTIS GmbH Berlin
tooling 5384
step bushing
main drive
rail system and
step band
NEWEL
LOWER LANDING
new since 06 / 99
Copyright 1999, OTIS GmbH Berlin
PASSENGER LINE
RETURN LINE
Continuation
2. Examination of handrails
1. On dirt, damages and handrail entry in the hoppers (front cover).
2. Set escalator out of function.
3. Test handrailplay (F) on the newel bow
= 5mm
= in test
3. Examination of steps
1. Mark a step with chalk
2. Set escalator into operation and let rotate step band 1,5 times.
3. Test centre entry of step grooves in the combs.
4. Test on damages.
5. Set escalator out of operation.
step
Copyright 1999, OTIS GmbH Berlin
6
diffuser
LED
step
skirt panel
12. Turn back the switch shaft in original position and start again.
Continuation
7
Copyright 1999, OTIS GmbH Berlin
1. Turn on main switch and run with open step band to the switch position
with the revision control.
2. Turn off main switch.
3. Test tight fitting and adjusting dimension.
4. Test on function
- release switch
- turn on main switch and start escalator via the revision control
supersedes 05/95
Continuation
9. Examination of linear belt handrail drive system on both sides in the area of
the upper landing (test intervall D)
1. Turn on main switch and turn off circuit breaker (lower landing).
2. Remove blind plug on the junction box and connect revision control.
3. Remove of 5 steps.
- Remove step guard
- Lift safety bolt by means of step lifting device on the first step
- Shift sliding bushes to the centre of axle (each left and right step side)
- Marc steps and stepaxle and take out steps
- Turn on control switch
- Run step band by one step
- Turn off circuit breaker
- Remove 2nd to 5th step as described
4. Turn on circuit breaker and run step band to the area of handrail drive.
5. Remove revision control in the lower landing and plug in control on the
controller in the upper landing. Replace blind plug in the lower landing.
9.3
Copyright 1999, OTIS GmbH Berlin
Continuation
tooling 5385
screw M4
clip
skirt panel
tooling 5382
Copyright 1999, OTIS GmbH Berlin
Continuation
9.8
return pulleys for multi-V-belt
multi-V-belt
length compensation
roller bow
length compensation
Copyright 1999, OTIS GmbH Berlin
10
mm
Continuation
adjusting dimension multi-V-belt
release spring
tighten spring
9. Install skirt panel and inner decking in reverse order - see points 4.6 and 4.7
10. Turn on main switch
11. Run open step band with revision control to lower landing
12. Plug in revision control in the lower landing and turn off circuit breaker
13. Install step according to marking in reverse order
14. Install step guard
15. Disconnect revision control
16. Turn on circuit breaker
17. Close landing
Copyright 1999, OTIS GmbH Berlin
new since 06 / 99
Continuation
1. Turn on main switch and turn off circuit breaker (lower landing).
2. Remove blind plug on the junction box and connect revision control.
3. Remove of 5 steps.
- Remove step guard
- Lift safety bolt by means of step lifting device on the first step
- Shift sliding bushes to the centre of axle (each left and right step side)
- Marc steps and stepaxle and take out steps
- Turn on control switch
- Run step band by one step
- Turn off circuit breaker
- Remove 2nd to 5th step as described
4. Turn on circuit breaker and run step band to the area of handrail drive.
5. Remove revision control in the lower landing and plug in control on the
controller in the upper landing. Replace blind plug in the lower landing.
10.3
Copyright 1999, OTIS GmbH Berlin
tooling 5385
screw M4
clip
skirt panel
Copyright 1999, OTIS GmbH Berlin
tooling 5382
Continuation
NEWEL
LOWER LANDING
PASSENGER LINE
RETURN LINE
Copyright 1999, OTIS GmbH Berlin
10.8
1
7±
12
HANDRAIL PRESSURE
ROLLER CHAIN
1,3 ± 0,2
Copyright 1999, OTIS GmbH Berlin
9. Install skirt panel and inner decking in reverse order - see points 4.6 and 4.7
10. Turn on main switch
11. Run open step band with revision control to lower landing
12. Plug in revision control in the lower landing and turn off circuit breaker
13. Install step according to marking in reverse order
14. Install step guard
15. Disconnect revision control
16. Turn on circuit breaker
17. Close landing
U:/Anders/Binder/Treppe/MHBNCE/Ort7_maintNCE_neu/FOD-FIE/07.5.99 company private
OTIS Field Method Manual
Maintenance
Part:
No:
4
G 9171M01
Sect.: 12.1
Page: 77/82
Escalator OTIS 506 NCE
Date: 05/99
place 7- incline section
12
max 6
max 6
O il n o . 3 9
K d ro p o ile r D ro p o il o u tle t: a d ju s t 4 d ro p s /1 0 s e c .
a n d re fill o il ta n k a t e a c h m a in te n a n c e
J s te p c h a in O p e n lo w e r flo o r p la te , a p p ly o il to th e 1 . b e fo re
lin k s o f s te p c h a in d u rin g o p e ra tio n in u p - o p e ra tio n -
d ire c tio n . s ta rt
A v o id d rip p in g o ff. U s e s u ffic ie n t o il. 2 . e v e ry 3
m o n th s
H b ra k e le v e r A p p ly o il o n a ll lin k s w ith a b ru s h 1 . b e fo re
b o lt o p e ra tio n -
s ta rt
2 . e v e ry 3
m o n th s
G b ra k e s h o e o il n o . 3 9 A p p ly o il o n a ll s lid in g s u rfa c e s a n d h in g e E v e ry 6
g u id e p o in ts b y m e a n s o f b ru s h m o n th s
F m a in d riv e g re a s e n o . 1 2
b e a rin g
E te n s io n g re a s e n o . 1 2 A p p ly g re a s e o n s lid in g s u rfa c e s O nce a year
c a rria g e
g u id e
Copyright 1999, OTIS GmbH Berlin
Remark:
1. This lubrication plan only applies to inside-installed escalators. For weatherproofed escalators the maintenance
interval must be cut in two (except pos. M).
2. If the escalator will not be set in operation immediately after erection, oil no. 39 is to be applied to the chains
every 3 months (15 min., during escalator run).
continuation
Lubrication means
OTIS TYPE FIRM DESIGNATION
GRAFLOSCON C - SG 460
GREASE LO 10 CORBULA FETT A
MOBILPLEX 44
BEACON EP 2
FETT HLP 2
GREASE No. 12 LS-EP 2
ALVANIA EP 2
FETT FEP 2
OIL No. 39 FEBIS K 46
SYNTHESO D 220 EP
OIL LO 33 A*) S 220 (EZL 502)
GLYGOYLE 30
GREASE No.16 FETT MICROLUBE GL 262
Ident.Nr. : 198697**
SYNTHESO T 150
OIL SYNTHESO T 220
Tooling 5366 Hook for handrail assembly, return line (long hook, part 1)
and 5367 Hook for handrail assembly, return line (long hook, part 2)
Part 1
Part 2
GAA 27 BW 1
Tooling
GO 6815 Y1 Step pin lifter
Tooling
GAA 26201 M1 Controller lifting device
Copyright 1999, OTIS GmbH Berlin