QF-GMD-40

POWER GRID COMPANY OF BANGLADESH LTD


FACILITY RECORD OF GRID SUB-STATION
Division: GMD: Chittagong North Sub-station: Abul Khair 230kV grid S/S Sub-Station Identification No.:331
Date:- 27.09.2017 Reference File No.:

Transformer:

Rated
Capacity Date of
ID No. Bank Voltage OLTC Manufacturer Remarks
(MVA) Commissioning
(KV)
Rated Current : 300A Sn:12090-01
Not 230/11/11 63/80 ABB Sweden.
80MVA Type: UCGRN650/300/C 02/08/2015 Position: North East
parallel KV MVA Year :2013
No of Step: 21 1st

Rated Current: 600A Sn:13118-001


150MVA- 130/150 ABB Sweden.
Do 230/33 kV Type UCGRN/650/600/C 02/08/2015 Position: North East
T1 MVA Year :2013
No of Step: 21 2nd (near O2 plant)

Rated Current: 600A


Sn:13118-00
150MVA- 130/150 Type UCGRN/650/600/C ABB Sweden.
Do 230/33 kV 03/8/2015 Position: West -
T2 MVA No of Step: 21 Year :2013
North
QF-GMD-40
POWER GRID COMPANY OF BANGLADESH LTD
FACILITY RECORD OF GRID SUB-STATION
Division: GMD: Chittagong North Sub-station: Abul Khair 230kV grid S/S Sub-Station Identification No.:331
Date:- 27.09.2017 Reference File No.:

Circuit Breaker:
Rated
Rated fault Date of
ID No. Name Type Current Manufacturer Remarks
Current (kA) Commissioning
(A)
ABB,
Abul Khair – Serial number:
LTB245E1
Hathazari 230KV. R phase 17501598A1
HAT-QA1 With BKL222 2500 A 40 KA 12.7.2015 (Bay 24)
Line Breaker Y phase17501598B1
SF6 CB SPR B phase17501598C1
Yr.-2014
ABB,
Abul Khair– Serial number:
BSRM 230KV. LTB245E1
R phase 17501600A1
BSRM-QA1 Line Breaker With BKL222 2500 A 40 KA Y phase17501600B1
12.7.2015 (Bay 25)
SF6 CB SPR B phase17501600C1
Yr.-2014
ABB,
LTB245E1 Serial number:
BUS COUPLER R phase 17501602A1
BUS-QA1 With BKL222 2500 A 40 KA 12.7.2015 (Bay 22)
Breaker Y phase17501602B1
SF6 CB SPR B phase17501602C1
Yr.-2014
ABB,
LTB245E1 Serial number:
Outgoing 1- AKSML O/G R phase 17501599A1
With BKL222 2500 A 40 KA 12.7.2015 (Bay 28)
QA1 Feeder-1 Y phase17501599B1
SF6 CB SPR B phase17501599C1
Yr.-2014
ABB,
LTB245E1 Serial number:
Outgoing 2- AKSML O/G R phase 17501601A1
With BKL222 2500 A 40 KA 12.7.2015 (Bay 29)
QA1 Feeder-2 Y phase17501601B1
SF6 CB SPR B phase17501601C1
Yr.-2014
QF-GMD-40
POWER GRID COMPANY OF BANGLADESH LTD
FACILITY RECORD OF GRID SUB-STATION
Division: GMD: Chittagong North Sub-station: Abul Khair 230kV grid S/S Sub-Station Identification No.:331
Date:- 27.09.2017 Reference File No.:

CT:
Rated Date of
ID No. Name of Feeder Type Voltage (KV) Manufacturer Remarks
Commissioning
Abul Khair – ABB Ltd.
IMB – 245
Bay24-CT Hathazari 245kV India 02.6.2015 (Bay 24)
1600-800A/1A
230KV. Line 2014.
Abul Khair– ABB Ltd.
IMB – 245
Bay25-CT BSRM 230KV 245kV India 02.6.2015 (Bay 25)
1600-800A/1A
Line 2014.
ABB Ltd.
AKSML O/G IMB – 245
Bay28-CT 245kV India 02.6.2015 (Bay 28)
Feeder-1 1600-800A/1A
2014.
ABB Ltd.
AKSML O/G IMB – 245
Bay29-CT 245kV India 02.6.2015 (Bay 29)
Feeder-2 1600-800A/1A
2014.
ABB Ltd.
Bay-22- BUS COUPLER IMB – 245
245kV India 02.6.2015 (Bay22)
CT1 Feeder. 2000-1000A/1A
2014.

ABB Ltd.
Bay-22- BUS COUPLER IMB – 245
245kV India 02.6.2015 (Bay 22)
CT2 Feeder. 2000-1000A/1A
2014.

ABB Ltd.
Bay28- AKSML O/G IMB – 245
245kV India 02.6.2015 (Bay 28)
MCT Feeder-1 1600-1200A/5A
2014.

ABB Ltd.
Bay29- AKSML O/G IMB – 245
245kV India 02.6.2015 (Bay 29)
MCT Feeder-2 1600-1200A/5A
2014.
QF-GMD-40
POWER GRID COMPANY OF BANGLADESH LTD
FACILITY RECORD OF GRID SUB-STATION
Division: GMD: Chittagong North Sub-station: Abul Khair 230kV grid S/S Sub-Station Identification No.:331
Date:- 27.09.2017 Reference File No.:

Rated
Date of
ID No. Name of Feeder Type Voltage Manufacturer Remarks
Commissioning
(kV)
Abul Khair – WP-245N2 ABB-Ltd.
Bay-24PT Hathazari /
230KV/√3 110V/√3 245kV India
Year: 2014
26.01.2015 Bay-24
230kV. Line
Abul Khair– WP-245N2 ABB-Ltd. 26.01.2015
BSRM 230kV India
Bay-25PT
Line.
/
230KV/√3 110V/√3
245kV
Year: 2014
Bay-25

BUS WP-245N2 ABB-Ltd. 26.01.2015


COUPLER India
BUSPT-1
FEEDER
/
230KV/√3 110V/√3
245kV
Year: 2014
BUS1

BUS WP-245N2 ABB-Ltd. 26.01.2015


COUPLER India
BUS PT-2
FEEDER
/
230KV/√3 110V/√3
245kV
Year: 2014
BUS2

AKSML O/G WP-245N2 ABB-Ltd. 26.01.2015 Bay-28


Feeder-1 India Sl. R,Y,B
Bay28MPT /
230KV/√3 110V/√3 245kV Year: 2014 phase:
2212144
8,47,37
AKSML O/G WP-245N2 ABB-Ltd. 26.01.2015
Feeder-2 India
Bay29MPT /
230KV/√3 110V/√3 245kV
Year: 2014
Bay-29

CVT:
QF-GMD-40
POWER GRID COMPANY OF BANGLADESH LTD
FACILITY RECORD OF GRID SUB-STATION
Division: GMD: Chittagong North Sub-station: Abul Khair 230kV grid S/S Sub-Station Identification No.:331
Date:- 27.09.2017 Reference File No.:

Battery:

ID
Number Date of
No Name Manufacturer TYPE Remarks
of Cell Commissioning
.
KBH 410P
HBL Power system ltd. India
Set # 1 Nickel Cadmium,
Year: NOV,2014 92 nos. 2015 410AH/1.2V
12910,B01 Alkaline
Electrolyte only.

KBH 410P
HBL Power system ltd. India
Set # 2 Nickel Cadmium,
Year: NOV,2014 92 nos. 2015 410AH/1.2V
12909,BO2 Alkaline
Electrolyte only.
40KBL 200P
Set # 3 HBL Power system ltd. India Nickel Cadmium,
40 nos. 2015 200AH/1.2V
13265,B01 Year: Apr,2015 Alkaline
Electrolyte only.
40KBL 200P
Set # 4 HBL Power system ltd. India Nickel Cadmium,
40 nos. 2015 200AH/1.2V
13266,B02 Year: Apr,2015 Alkaline
Electrolyte only.

Battery Charger:
ID Date of
Name Manufacturer Remarks
No. Commissioning
Charger # 1 HBL Power system ltd. India 415V/110V
Year: Oct,2014 2015
12910 25.13A/80A
Charger # 2 HBL Power system ltd. India 415V/110V
Year: Oct,2014 2015
12909 25.13A/80A
HBL Power system ltd. India
Charger # 3 415V/48V
Year: March,2015 2015
13265 6.75A/50A
Charger # 4 HBL Power system ltd. India 415V/48V
2015
13266 Year: March,2015 6.75A/50A
QF-GMD-40
POWER GRID COMPANY OF BANGLADESH LTD
FACILITY RECORD OF GRID SUB-STATION
Division: GMD: Chittagong North Sub-station: Abul Khair 230kV grid S/S Sub-Station Identification No.:331
Date:- 27.09.2017 Reference File No.:

Protective Relay:

Date of
ID Manu-
Name Objective Type Commissi Remarks
No. facturer
oning
Type-REL-670,Ordering no-IMRK004812-CC,Serial no-
ABB 2015
T1421182
Abul Khair – Protection Type-REL-650,Ordering no-IMRKOO8512-CD,Serial no-
ABB 2015
Hathazari Panel T1421183
230kV. Line
Type-REB-500,ABB-05 Line-1 to BSRM Node-1,Device Id-
ABB 2015
08
2015
Control Type-REC-670 Ordering no-IMRK004814-AC,Serial no-
ABB
Panel T1421185

Type-REL-670,Serial no-T1421181,Ordering no- 2015


ABB
IMRKOO4812-CC
Type-REL-650,Serial no-T1421184 Ordering no- 2015
Protection ABB
Abul Khair– Panel IIMRK008512-CD
BSRM 2015
230kV Line Type-REB-500,ABB-06 Line-1 to Hathazari Node-1,Device
ABB
Id-09
2015
Control Type-REC-670 Ordering no-IMRK004814-AC,Serial no-
ABB
Panel T1421186

2015
Protection
Abul Khair Panel Type-REL-670,Serial no-T1421180,Ordering no- ABB
O/G-1 IMRK004812-CC

2015
ABB
Type-REL-670,Serial no-T1421177,Ordering no-
IMRK004812-CC

2015
ABB
Type-REB-500,ABB-09 OG-01 to AKSML,Node-1,Device
Id-12

2015
ABB

Control Type-REC-670 Ordering no-IMRK004814-AC,Serial no-


Panel T1421188
QF-GMD-40
POWER GRID COMPANY OF BANGLADESH LTD
FACILITY RECORD OF GRID SUB-STATION
Division: GMD: Chittagong North Sub-station: Abul Khair 230kV grid S/S Sub-Station Identification No.:331
Date:- 27.09.2017 Reference File No.:

Date of
ID Manu-
Name Objective Type Commissi Remarks
No. facturer
oning
2015
Abul Khair Type-REL-670,ORDERING NO-IMRKOO4812-CC,Serial ABB
O/G-2 no-T1421179
ABB 2015
Protection Type-REL-670,Ordering no-IMRKOO4812-CC,Serial no-
Panel T1421178

Type-REB-500,ABB-10 OG-02 to AKSML, Node-1,Device ABB 2015


Id-13
ABB 2015

Control Type-REC-670 Ordering no-IMRK004814-AC,Serial no-


Panel T1421187

2015
230 kV Bus Control Type-REC-670 Ordering no-IMRK004814-AC,Serial no- ABB
Coupler panel T1421189
Type-REB-500,ABB-03 CT-02,Buscoupler VT FOR 25, ABB 2015
Node-1,Device Id-06
230kV BBP Protection ABB 2015
& BFP panel Type-REB-500,ABB-00 CU 1, Node-1,Device Id-1

Type-REB-500,ABB-02 CT-01,Buscoupler Node-1,Device Id- ABB 2015


5
ABB 2015
Alarming Type-REC-650 Ordering no-IMRK008514-AD,Serial no-
SAS Panel-2
panel T1421190
QF-GMD-40
POWER GRID COMPANY OF BANGLADESH LTD
FACILITY RECORD OF GRID SUB-STATION
Division: GMD: Chittagong North Sub-station: Abul Khair 230kV grid S/S Sub-Station Identification No.:331
Date:- 27.09.2017 Reference File No.:

Isolator/ Disconnecting Switch:

Rated
Date of
ID No. Name Current Hand /Motor Operated Manufacturer Remarks
Commissioning
(A)
Bay24QB1 Bus Isolator ABB
Bay24QB2 Bus Isolator 2500 A Motor Operated Year: 2014 12.7.2015 Bay24
Bay24QB9 LineIsolator
Bay25QB1 Bus Isolator ABB
Bay25QB2 Bus Isolator 2500 A Motor Operated Year: 2014 12.7.2015 Bay25
Bay25QB9 LineIsolator
Bay28QB1 Bus Isolator ABB
Bay28QB2 Bus Isolator Year: 2014
Motor Operated 12.7.2015 Bay28
Bay28QB9 LineIsolator 2500 A
Bay29QB1 Bus Isolator ABB
Bay29QB2 Bus Isolator 2500 A Year: 2014
Motor Operated 12.7.2015 Bay29
Bay29QB9 LineIsolator
Bus Isolator ABB
Bus1-QB51 Motor Operated Year: 2014 12.7.2015 Bay22
2500 A
Bus1-QB51 Bus Isolator
Bus Isolator ABB
Bus1-QB51 Motor Operated 12.7.2015 Bay22
2500 A
Bus1-QB51 Bus Isolator Year: 2014
QF-GMD-40
POWER GRID COMPANY OF BANGLADESH LTD
FACILITY RECORD OF GRID SUB-STATION
Division: GMD: Chittagong North Sub-station: Abul Khair 230kV grid S/S Sub-Station Identification No.:331
Date:- 27.09.2017 Reference File No.:

Bus Bar:
Rated Rated
Conductor No. of Date of
ID No. Voltage Current Bus Scheme Remarks
Type Sections Commissioning
(KV) (A)
ACSR,Twin Mose
Bus Coupler 2000 A
230 KV Conductor Bus-1 Nil 12.7.2015
Bus-1
Bus Coupler ACSR,Twin Mose
Bus-2 230 KV Conductor 2000 A Bus-2 Nil 12.7.2015

Lightning Arrestor:
Rated
Date of
ID No. Name of Feeder Type Voltage (Kv) Manufacturer Remarks
Commissioning

Abul Khair – ABB


Bay24-LA Hathazari 230KV. 186kV Year: 2014 12.7.2015
Line
Abul Khair– 186kV ABB 12.7.2015
Bay25-LA BSRM 230KV Year: 2014
Line
AKSML O/G 186kV ABB 12.7.2015
Bay-28-
Feeder-1 Year: 2014
LA1
AKSML O/G 186kV ABB 12.7.2015
Bay-28-
Feeder-2 Year: 2014
LA2

BUS COUPLER 186kV ABB 12.7.2015


Bay-29-
Feeder. Bus-1 Year: 2014
LA1

BUS COUPLER 186kV ABB 12.7.2015


Bay-29- Year: 2014
LA2 Feeder. Bus-2
QF-GMD-40
POWER GRID COMPANY OF BANGLADESH LTD
FACILITY RECORD OF GRID SUB-STATION
Division: GMD: Chittagong North Sub-station: Abul Khair 230kV grid S/S Sub-Station Identification No.:331
Date:- 27.09.2017 Reference File No.:

Auxiliary Equipment:

Date of
ID No. Name Type of facility Capacity Manufacturer Commissionin Remarks
g
Air Cooling GREE, China 2015
01 Air Cooler 48000Btu/hr /4.Ton 220-240V
Model GS-48W/1 Year:2013
Air Cooling GREE, China 2015
02 Air Cooler 48000Btu/hr /4.Ton
Model GS-48W/1 Year:2013
Air Cooling GREE, China 2015
03 Air Cooler 48000Btu/hr /4.Ton
Model GS-48W/1 Year:2013
Air Cooling GREE, China 2015
04 Air Cooler 48000Btu/hr /4.Ton
Model GS-48W/1 Year:2013
Air Cooling GREE, China 2015
05 Air Cooler 48000Btu/hr /4.Ton
Model GS-48W/1 Year:2013
06
07
08
09

Abul Khair 230kV Grid Sub-Station Information


1. Sub-Station Capacity…….350 MVA
2. Maximum Load………..230 MW (T1 + T2+T3)
3. Sub-Station Bus Capacity 2000A
4. Sub-Station Bus Conductor Type, AAAC 805 mm2
5. 230 kV Bay NO:-02 No’s
6. HAT- BSRM 230 KV line length 53.12 ckt km.
7. BSRM- Comilla (N) 230 KV line length 97.88 ckt km.
8. HAT- AKSPL 230 KV line length 18.7ckt km.
9. BSRM - AKSPL 230 KV line length 48.42 ckt km.
10. (AKS to Tower 401) of HAT-BSRM 230 KV line length 7 ckt km.
11. (HAT to Tower 401) of HAT-BSRM 230 KV line length 11.7 ckt km.
12. (BSRM to Tower 401) Of HAT-BSRM 230 KV line length 36.72 ckt km.
13. Total quantity of Tower from 401 to AKSML=35 nos.