Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Prelim Exam ALM

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6

Application Lifecycle Management

Prelim Exam

50/50

Enables you to schedule PPT calculations for your entire site.

Scheduling Area

Refreshes the scorecard table, so that it displays the most up-to-date information.

Generate

The HP’s strategy and software approach for modern application delivery starts with a
what? 

Unified platform

It is a translating business goals/objectives into a realized software-enabled business


process.

Creating requirements

Displays KPI calculations that enable you to determine the status of your release.

Scorecard tab

Allows you to capture a group of requirements, tests, or test assets at strategic points
in the project lifecycle to mark specific milestones.

Baselining

Milestones are used to measure progress in project planning and tracking.

True

The Release Scope tab enables you to define and update release scope items.

True

This section enables you to open the ALM documentation library and other online
resources.

Help section
After the _____, the release goes through further testing cycles to test aspects, such as
functionality and performance of the application.

first cycle

A session/user authentication process that permits a user to enter one name and
password to access multiple applications.

Single Sign-on

A dynamic hierarchical structure based on virtual folders allows for flexibility in


manipulating the Requirements view.

Category views

Cycle 2 can start before the end of cycle 1.

True

You can add ______ to a cycle.

Attachments

This cycle tests the new features with existing features that might have been impacted
by the changes.

Cycle 2-Integrated System Testing

Enables subject matter experts (SMEs) to work with Business Process Testing (BPT),
the HP test automation solution.

Business Components module

You create a _____ to define the hierarchical framework of releases.

Release tree

Indicates whether the scheduled calculation is currently running.

Active/Inactive

Module addresses the need for a stronger connection between business process
modeling, quality assurance management, and requirements definition.

ALM Business Models


In the definition phase, the QA/project manager defines the scope, milestones, and
KPIs for the project in ALM.

False

Changes the speed that it takes for ALM to calculate the KPI data.

Engines Throttle

Contains the Analysis tree in which you organize all of your analysis items. 

Analysis View module

If an application flaw is detected while running a test set, you can submit a defect. 

True

Displays the progress of a release in a Gantt chart.

Master Plan tab

ALM support you through ____.

All phases of Application Lifecycle Management

This cycle ensures that the new features meet the expectations of the business.

Cycle 4-User Acceptance Testing

Enables you to purge calculations after a specific time period.

Purge Area

Enables you to increase the number of parallel calculations performed on an entire site

Advanced Area

You can not customize each KPI to reflect your needs.

False

_______are checkpoints on a release timeline used to verify that the release and its
interim deliverables are progressing as planned.

Milestones
Enables you to manage resources used by your tests. You can organize your resources
by defining a hierarchical Test Resource tree containing resource folders and resources.

Test Resources

The Detailed tab enables you to select content to include in the release scope item

False

This is the two modules that have been completely redesigned as part of this release of
ALM 12.0.

Requirements Management and Defects Management

A test set folder in the Test Lab module contains tests that are covered by your
requirements.

True

Tests the performance of the application for criteria such as number of concurrent users
that the application supports and the response time of the application.

Cycle 3-Performance Testing

A physical devices used to identify users in secure systems.

Smart Card Authentication

This tab enables you to manage the analysis items

Analysis Menus tab

Tests the new features of the application implemented in the release.

Cycle 1-New Features

Using the _____, you can report flaws in your application and track their repair during
all stages of the application management process.

ALM Web client

A _______ is an independent business unit within an organization, with its own set of
rules, standards, resources, objectives, and applications.

Line of business (LOB)


It supports you through all the phases of application lifecycle management. By
integrating the tasks involved in application management.

Application Lifecycle Management

Enable you to create and display a dynamic graphic representation of data related to
test plans and test sets.

Live Analysis graphs

Contains the Dashboard tree in which you organize dashboard pages.

Dashboard View module

Enables quality assurance managers to track application readiness by defining goals for
activities of an application release.

ALM project planning and tracking (PPT)

The testing process begins with defining defect in the Management module.

False

The foundation of the Management module is the ______.

Release tree

When you assign a requirement to a cycle, the requirement is not automatically


assigned to the release.

False

Enabled for requirements, tests, and test assets to allow distributed teams to
collaborate and manage multiple versions of assets in parallel while maintaining data
integrity and providing an audit history of changes throughout the project lifecycle.

Version control

______ are the means for setting objectives on Project Planning and Tracking releases
and for planning and tracking release progress towards these objectives throughout its
duration.

Thresholds
After adding a cycle to a release, you specify the details for the cycle using the _____.

Details tab

You might also like