MVLC-Hand-Tool-02: Tool and Product Nomenclature Safety Instructions Warning
MVLC-Hand-Tool-02: Tool and Product Nomenclature Safety Instructions Warning
MVLC-Hand-Tool-02: Tool and Product Nomenclature Safety Instructions Warning
Outfeed
side
Brass Receptacle
zipper infeed
Arrow
infeed
_16
1
PCN 476676-000
PII 55125, Rev AB Effective Date: July 7, 2004
Installation Instructions
_17
2. Wrap the MVLC around the conductor such that the arrow
and creepage extender are on the near side.
Outfeed
side
_6
2
PCN 476676-000
PII 55125, Rev AB Effective Date: July 7, 2004
4. Continue sliding the MVLC towards the hand tool, ensuring
that the creepage extender stays below the conductor, but
slides on top of the brass zipper. Slide the arrow and
receptacle into their respective compartments under the brass
zipper.
_5
5. Continue pushing the product to the left and the hand tool
to the right until the MVLC installation is complete.
MVLC product
Hand tool
_4
"X"
fig6
3
PCN 476676-000
PII 55125, Rev AB Effective Date: July 7, 2004
2. Place the hand tool in your left hand such that the rollers
and handle slide against the contour of the conductor and are
approximately halfway up the conductor.
Standing on _11
this side
of the _21
conductor.
Creepage extender
and arrow
Outfeed
side
_6
4
PCN 476676-000
PII 55125, Rev AB Effective Date: July 7, 2004
4. While holding the tool steady, continue pushing the MVLC
product toward the top lug.
Slide
product
fig9
5. When the MVLC reaches the top lug, grip the closed MVLC
with your left hand and use your right hand to pull the tool
towards the bottom lug.
Tool
fig9a
5
PCN 476676-000
PII 55125, Rev AB Effective Date: July 7, 2004
6. MVLC installation is complete.
fig11
_14 _15
6 PCN 476676-000
DCR C59570
PII 55125, Rev AB Effective Date: July 7, 2004