Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
49 views4 pages

Burj Dudai Development The Dubai Mall: Date: Date: Action Codes Legend

Download as xls, pdf, or txt
Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1/ 4

BURJ DUDAI DEVELOPMENT

THE DUBAI MALL


Employer: EMAAR PROPERTIES Architect: DP ARCHITECTS PTE LTD
Project Manager: TURNER CONSTRUCTION-International LLC Structural Engineer: MEINHARDT (Singapore) PTE LTD Package: DM02-NS
E/M Consultant: MEINHARDT (Singapore) PTE LTD Contractor: DBB/AGCCC JV

MATERIAL / PLANT INSPECTION REQUEST (MIR) Date:


From: Contractor "DBB/AGCCC" Ref: MIR - NS- / SMY/ Rev.: 0

To: Consultant Date / Time of Inspection:

Description of Item Manufacturer / Response / Action


Submittal No. Quantity Received
Item No. Attached Documents Arrival Date on Site By Supervision Consultant (SC)
(Name, Type, Size, Capacity, Specific Use, etc.) Ref. Supplier per Unit
Inspected By Action Code

(JV) AGCC & DBB QCD :

GRID LINE & MATERIAL Nos

This is to certify that all items submitted herewith have been checked by the Contractor, are in conformance with the requirements of the Contract Documents and are approved by the Contractor for the Works, Except as noted below:

Authorized Representative of the Sub Contractor Subcont. QC Engineer: DBB/AGCCC QC Engineer: Inspection Comments :
Title and Signature:

Date: Date: Date:


To: Contractor "DBBB/AGCCC"
From: Consultant Date:

Action Codes Legend:


A- No Exceptions Taken
B- Make Corrections Noted
C- Resubmit after Correction Signature
(Authorized Representative)
BURJ DUDAI DEVELOPMENT
THE DUBAI MALL
Employer: EMAAR PROPERTIES Architect: DP ARCHITECTS PTE LTD
Project Manager: TURNER CONSTRUCTION-International LLC Structural Engineer: MEINHARDT (Singapore) PTE LTD Package: DM02-NS06
E/M Consultant: MEINHARDT (Singapore) PTE LTD Contractor: DBB/AGCCC JV

MATERIAL / PLANT INSPECTION REQUEST (MIR) Date:


From: Contractor "DBB/AGCCC" Ref: MIR - NS-06 / SMY / Rev.: 0

To: Consultant Date / Time of Inspection:

Description of Item Manufacturer / Response / Action


Submittal No. Quantity Received
Item No. Attached Documents Arrival Date on Site By Supervision Consultant (SC)
(Name, Type, Size, Capacity, Specific Use, etc.) Ref. Supplier per Unit
Inspected By Action Code

(JV) AGCC & DBB QCD : 10 Nos.

GRID LINE & MATERIAL Nos

This is to certify that all items submitted herewith have been checked by the Contractor, are in conformance with the requirements of the Contract Documents and are approved by the Contractor for the Works, Except as noted below:

Authorized Representative of the Sub Contractor Subcont. QC Engineer: DBB/AGCCC QC Engineer: Inspection Comments :
Title and Signature:

Mr.EHAB FADEL

Date: Date: Date: 04.04.08


To: Contractor "DBBB/AGCCC"
From: Consultant Date:

Action Codes Legend:


A- No Exceptions Taken
B- Make Corrections Noted
C- Resubmit after Correction Signature
(Authorized Representative)

You might also like