” about something
related to structural steel design or construction,
Modern Steel’s monthly Steel Interchange is for you!
steel
Send your questions or comments to solutions@aisc.org. interchange
Limiting the Number of Field Splices Ats can be calculated as: πnLeDmin [1/(2n)+ 0.577(Dmin-Emax)]
The erector on our project is insisting that conditions where
indicated as field-welded splices in the contract docu- Dmin = minimum major diameter of the bolt threads
ments should be shop welded for economy. Can we shop Le = length of thread engagement
weld these splices? Emax = maximum pitch diameter of the nut threads n is the
threads per inch
Section 6.7.4 of the AISC Code of Standard Practice states: As it turns out, fasteners are configured such that πnLeDmin
Unless otherwise specified in the contract documents, and [1/(2n)+ 0.577(Dmin-Emax)] > 1.0. So the strength relative to
subject to the approved shop and erection drawings, the stripping always increases faster than the increase in thread
fabricator shall limit the number of field splices to that engagement. So if we simply assume that the strength relative
consistent with minimum project cost. to stripping always increases at the same rate as the increase in
The key phrase here is: “Unless otherwise specified in the thread engagement, we will have a conservative estimate of the
contract documents…” The contract documents call for field strength.
splices, and those requirements govern the project and must Some caution must be exercised when applying these
be adhered to unless a change to the contract is agreed to by equations, since there are other factors—such as friction, the
the parties. relative nut-to-bolt strength, etc.—that can affect the stripping
Toward that end, you could submit a request to the strength of the bolt. Therefore, it is advisable to err on the
engineer of record (EOR) to modify the connection such that side of caution, as has been done in the guidance presented in
this would result in reduced field welding. Or, if you think the the design guide.
field weld symbol may have been a mistake, you could submit It should also be noted that though exceptions relative
an RFI to clarify this. to full thread engagement are sometimes made for anchor
Ultimately, however, you cannot change the condition shown rods, it is generally not considered appropriate to make such
in the contract documents without approval from the EOR. exceptions for bolted connections.
Carlo Lini Larry S. Muir, P.E.
DECEMBER 2014