TANGEDCO / UDANGUDI STPP-I (2x660MW)

BILL ABSTRACT - CAPTIVE COAL JETTY - MECHANICAL RAB:25


Name of the Project: 2x660MW, Udangudi Supercritical Thermal Power Project, Stage-I, Kallamozhi, Thiruchendur
Name of the Work: Establishment of Captive Coal Jetty with Unloading facilities and Pipe Conveyor System for 2x660 MW Udangudi Super Critical Thermal Power Project under single EPC contract.
Name of the EPC contractor: M/s.ITD Cementation India Limited, Mumbai
WORK ORDER: CE/PROJ/SE/C/UP/EE/M/OT No.03/2014-15/WO.No.02/D.217/2018, Dt.21.06.2018
LOI: Lr.No.CE/PROJ/SE/C/UP/EE/M/OT No.03/2014-15/LOI/D.53/2018 Dt.13.02.2018
MDCC: Lr.No.CE/Proj-II/SE/C/UP/EE/M/AEE/M/Coal Jetty-MDCC/D.108/2020, Dt.09.09.2020
BBU: Lr.No.CE/PROJ/SE/C/UP/EE/M/AEE/M/W.O.No.02/2018-19/D.81/2020 Dt.31.07.2020 (BBU:7)

BBU Bill value as per invoice (Rs.) Payment Details Including Taxes
Rate Per
Sl. Drawing Appl. Erection Total Taxable
Category Item Item Unit. Basic Price Gross Transportation
No. Unit Quantity Currency CGST (9%) SGST (9%) 70% MDCC MRC 65% Deduction Amount
No Category Description Without in INR Total 90%
Incl.Taxes Incl.Taxes
Tax
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
On submission and
Design & approval of GA Drawing
1 1.18.1 LS 1 USD 2,366.10 1,49,111.73 13,420.06 13,420.06 1,75,951.84 1,23,166.29 0.00 0.00 0.00 0.00 52,785.55 1,23,166.29
Engineering of PSK Assembly for Pipe
Conveyor PC-1 & PC-2
On submission and
Design & approval of GA Drawing
2 1.18.4 LS 1 USD 2,550.00 1,60,701.00 14,463.09 14,463.09 1,89,627.18 1,32,739.03 0.00 0.00 0.00 0.00 56,888.15 1,32,739.03
Engineering of Carrying Idler for Belt
Conveyor BC-1 & BC-2
On submission and
Design & approval of GA Drawing
3 1.18.5 LS 1 USD 2,550.00 1,60,701.00 14,463.09 14,463.09 1,89,627.18 1,32,739.03 0.00 0.00 0.00 0.00 56,888.15 132739.026
Engineering of Return Idler for Belt
Conveyor BC-1 & BC-2
Total Taxable Value [INR] : 4,70,513.73
Total (Including GST) : 5,55,206.20
Deductions
Amount CGST (9%) SGST (9%) Net Amount
3 RAB:25 1 RA:10% After completion of Design and Engineering works for all the systems after approval 47,051.37 4,234.62 4,234.62
3 RAB:25 1 RA:10% After submission and approval of O&M manual and final As-Built drawings 47,051.37 4,234.62 4,234.62
Design & Engineering =>
RA:10% After written acceptance of Performance Guarantee Test & fulfilment of all contractual obligation after
3 RAB:25 1 47,051.37 4,234.62 4,234.62
adjusting all dues including LD and Penalty
TRUE 1,41,154.12 12,703.87 12,703.87
TRUE Gross Payable : 3,88,644.34
TRUE RAB:25 TRUE Design, Supply, Transportation and Storage TDS @ 1.5% : 7,057.71
TRUE RAB:25 TRUE Design, Supply, Transportation and Storage TDS GST (CGST) @ 1% : 4,705.14
TRUE RAB:25 TRUE Design, Supply, Transportation and Storage TDS GST (SGST) @ 1% : 4,705.14
TRUE Net Payable : ₹ 3,72,176