Wison Project Closing Report
Wison Project Closing Report
Wison Project Closing Report
00
Project Name : SAFCO DUAL STRAINER AT SEA WATER LINES IN SF3 AND SF2 PROJECT
Project Contract/P O/Agreement Number: 18169DC180011MO
Project Value: 320,000 SAR Start Date 1-Jan-19 End Date: 20-Jan-19
Client: WISON ENGINEERING LTS
Scope of Work: FABRICATION OF CS PIPING WITH HYDROTEST & PAINTING
Location: FABRICATION SHOP
Detail Breakdown
Budget Amount Variance. Amount
Service / Acct. Codes Annex. Description Actual Amount(SAR) Variance(%) Remarks
(SAR) (SAR)
A Revenue 304,671.00 372,283.00 (67,612.00) (22.19)
B Other Income / Loss - - - #DIV/0!
C EXPENSES
Mobilization
Demobilization
Consumables
C.7 Total Hire/ Equipment Rental / Purchasing 4,500.00 1,000.00 3,500.00 77.78
C.8 Total Internal GSCC Manpower(Ref. IM tracking) 78,152.00 71,000.00 7,152.00 9.15
C.9 Total External Manpower (Supply) (Ref.EM tracking) 59,200.00 49,678.00 9,522.00 16.08
C.13 Management Cost (4% of project value) 9,695.50 7,336.35 2,359.15 24.33
Division Planner/Manager/
Division Manager Sr. Finance Manager Operation Executive General Manager CEO
Engineer
Date:
Doc.No: QSP07-01 Rev: 00
ASSUMPTIONS:
1).Considered external manpower for Welder, Pipe Fitter/Fabricator, Piping Foreman & Painter rate provided by Mr.Sony Dated:31-DEC-18
2).As Confirmed by GSF Design Team we will use Offcut plates as Blind flages for hydrotest to optimise the Cost.
Detail Breakdown
Budget Amount Variance. Amount
Service / Acct. Codes Annex. Description Actual Amount(SAR) Variance(%) Remarks
(SAR) (SAR)
Milestone Billing - - - #DIV/0!
Mechanical 304,671.00 372,283.00 (67,612.00) (22.19)
Electrical & Instrumentation - - - #DIV/0!
Civil - - - #DIV/0!
Services - - - #DIV/0!
Procurement - - - #DIV/0!
Engineering - - - #DIV/0!
Scaff Floding - - - #DIV/0!
Change Order / Additional Scope - - - #DIV/0!
Heavy Equipment - - - #DIV/0!
- - - #DIV/0!
- - - #DIV/0!
- - - #DIV/0!
- - - #DIV/0!
A Revenue 304,671.00 372,283.00 (67,612.00) (22.19)
Sales of Scrap /left over materials - - - #DIV/0!
Exchange Difference - - - #DIV/0!
Others - - - #DIV/0!
B Other Income / Loss - - - #DIV/0!
C EXPENSES
Mobilization
Site Office - - - #DIV/0!
Temporary Facilities - - - #DIV/0!
Temporary Facilities-Containers - - - #DIV/0!
ID Processing including cost of ID and gate passes - - - #DIV/0!
Transportation Cost related to set - up - - - #DIV/0!
Cranes - - - #DIV/0!
Perimeter Fence - - - #DIV/0!
Business Travel - - - #DIV/0!
Permit / Third Party Inspection & certification - - - #DIV/0!
Others - - - #DIV/0!
Demobilization
Dismantling cost of Site Office, Camps and temporary facilities - - - #DIV/0!
Transportation Cost related to dismantling - - - #DIV/0!
Cranes - - - #DIV/0!
Permit - - - #DIV/0!
Restoration Cost - - - #DIV/0!
Miscellaneous - - - #DIV/0!
Consumables
Welding Consumables (Electrodes/Filler Wires) 6,008.00 2,169.00 3,839.00 63.90
Gases, Grinding Disc, Cutting Disc etc. as per Quotation 2,900.00 2,855.00 45.00 1.55
Purging Gas & Accessories for SS Welding - - - #DIV/0!
Paint Material - - #DIV/0!
Garnet Material - - #DIV/0!
Plastic rolls, wooden planks etc 1,000.00 200.00 800.00 80.00
DPT/MT Consumables 1,350.00 600.00 750.00 55.56
Pressure Gauge for Hydrotesting 1,200.00 985.00 215.00 17.92
Others 1,000.00 300.00 700.00 70.00
Painting consumables - - #DIV/0!
Pickling & Passivation mtrl - - #DIV/0!
- - #DIV/0!
Tools
Welding Electrode Holder - - #DIV/0!
Power tools/Cutting Grinnding macine - - #DIV/0!
Welding cable connector - - #DIV/0!
Welding Inspection Tools - - #DIV/0!
Carbide Cutter - - #DIV/0!
Painting Inspection Tools - - #DIV/0!
DPT/MT Consumables - - #DIV/0!
Others - - #DIV/0!
- - - #DIV/0!
- - - #DIV/0!
Sub Contractors
Design / Engineering Services - - #DIV/0!
NDT (RT, PMI) 7,340.00 6,000.00 1,340.00 18.26
Machining Charges, Tools for Lathe - - #DIV/0!
Insulation for Piping and Equipment - - #DIV/0!
Pipe Rolling Charges for Plaform - - #DIV/0!
Dish Forming (2 Nos.) - - #DIV/0!
WQT/PQR Preparation, WPS Depreciation 6,800.00 4,515.00 2,285.00 33.60
3rd Party Vendor /Civil Testings/ Suppliers / QC Inspectors - - #DIV/0!
Scaff folding - - #DIV/0!
Catering services (Food & Acc. Charges for Supply Manpower) - - #DIV/0!
Calibration - - #DIV/0!
Structural Steel Galvanizing - - #DIV/0!
Fire Proofing - - #DIV/0!
Painting/Coating Subcontractor for External, Internal and P/F & Ladde - - #DIV/0!
FBE - - #DIV/0!
Civil - - #DIV/0!
C.7 Total Hire/ Equipment Rental / Purchasing 4,500.00 1,000.00 3,500.00 77.78
C.8 Total Internal GSCC Manpower(Ref. IM tracking) 78,152.00 71,000.00 7,152.00 9.15
C.9 Total External Manpower (Supply) (Ref.EM tracking) 59,200.00 49,678.00 9,522.00 16.08
Project Overheads
Petrol / Diesel Expenses 1,000.00 1,000.00 - -
Procurment at site (Cash Purchase) - - #DIV/0!
Camp Maintenance/Rental - - #DIV/0!
Chamber of Commerce Expense - - #DIV/0!
Computer & Support Expenses - - #DIV/0!
Courier Expense - - #DIV/0!
Electricity 1,000.00 1,000.00 - -
Penalties - - - #DIV/0!
Project Insurance fees - - - #DIV/0!
Project Equipment Insurance - - - #DIV/0!
Project Vehicles Insurance - - - #DIV/0!
Internet Expense - - - #DIV/0!
Istemara & MVPI of Eqt /Vehicle - - - #DIV/0!
Mobile, Telephone, Fax Expenses 400.00 400.00 - -
Printing & Stationary 1,000.00 500.00 500.00 50.00
Waste & Sewage Services - - - #DIV/0!
Water Expense 200.00 200.00 - -
Public Relations / Entertainment Expenses - - - #DIV/0!
Repairs & Maint.-Office Furniture & Eqpt. - - - #DIV/0!
Travelling Exps - Business - - #DIV/0!
Bank Charges 360.00 - 360.00 100.00
Miscellaneous - - #DIV/0!
Documentation - - #DIV/0!
FAT for rental employees 13,500.00 - 13,500.00 100.00
- - #DIV/0!
C.13 Management Cost (5% of project value) 9,695.50 7,336.35 2,359.15 24.33
Division Planner/Manager/
Division Manager Sr. Finance Manager Operation Executive General Manager CEO
Engineer
Date:
Doc.No: QSP07-01 Rev: 00
Total In - Direct Cost 476.00 - 22,484.00 - 476.00 22,484.00 468.00 - 23,774.00 - 468.00 23,774.00 8.00 (1,290.00) 1.680672269 -5.737413272
Total Direct Cost 2,858.00 - 55,668.00 - 2,858.00 55,668.00 2,284.00 - 47,226.00 - 2,284.00 47,226.00 574.00 8,442.00 20.08397481 15.16490623
Grand Total 3,334.00 - 78,152.00 - 3,334.00 78,152.00 2,752.00 - 71,000.00 - 2,752.00 71,000.00 582.00 7,152.00 17.4565087 9.151397277
Gulf Sky Cranes & Contracting Co. Ltd
GSCC - External Manpower
WELDER 37.00 - 6.00 20.00 1,200.00 - 44,400.00 - 1,200.00 44,400.00 1,094.00 - 40,478.00 - 1,094.00 40,478.00 106.00 3,922.00 8.833333333 8.833333333
PIPE FITTER 23.00 - 2.00 20.00 400.00 - 9,200.00 - 400.00 9,200.00 400.00 - 9,200.00 - 400.00 9,200.00 - - 0 0
PIPING FOREMAN 28.00 - 1.00 20.00 200.00 - 5,600.00 - 200.00 5,600.00 - - - - - - 200.00 5,600.00 100 100
PAINTER 22.00 - - 7.00 - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - - - - #DIV/0! #DIV/0!
- - - - - - - - - - - - - - - - - - #DIV/0! #DIV/0!
Total Direct Cost 1,800.00 - 59,200.00 - 1,800.00 59,200.00 1,494.00 - 49,678.00 - 1,494.00 49,678.00 306.00 9,522.00 17 16.08445946
Grand Total 1,800.00 - 59,200.00 - 1,800.00 59,200.00 1,494.00 - 49,678.00 - 1,494.00 49,678.00 306.00 9,522.00 17 16.08445946