FRB02A010102
FRB02A010102
FRB02A010102
X
A A
48 48
191
0 0
142.5
27.5 B
27
O 6 X 57 DP.
B SECTION B-B
11
13 6.5 4 4
G 1/8 X 10 DP. G 1/8 X 10 DP.
G 1/8 X 10 DP. O8 DRILL X 58 DP. O6 DRILL THRU
28.28 G 1/8 X 10 DP. O8 DRILL X 140 DP. 8
A 7.5
O6 DRILL X 70 DP.
14.14 M3 X 20 DEEP O14 X 42 DP.
(04) HOLES G 1/8 X 10 DP.
O6 DRILL THRU 48 11
30.5
14.14 48 19 2.5
28.28 37.5 59.5
12.5
3.5 70 100
110 40.5
O 22 X 165 DP. VIEW FROM 'X'
60 This Drawing is property of Forbes & Company limited & must be returned on request
O 8 X 186.5 DP. It must be not used, copied or lent for any purpose without authorization.
DETAIL A 191 All Dimensions are in mm FORBES & COMPANY LIMITED I
- -
FOR DOWEL HOLE CD, TOLERANCE TO BE MAINTAINED WITHIN u0.02 Checked :-
Project No.:- -
Approved :- - -
UNSPEFIED TOLERANCES / DEVIATION ANGULAR TOL.
Finish :- 239 X 191 X 48 Description:- MANIFOLD
OVER - 6 30 120 400 1000 2000 - 10° 50° 100°
TO 6 30 120 400 1000 2000 3000 10° 50° 100°
Machining:- ( ) Rev No.:-
J -
Drawing / Part No.:- MANIFOLD
J
Material :- TRASPERENT PVC -
DEVIATION ±0.1 ±0.2 ±0.3 ±0.5 ±0.8 ±1.2 ±2 ±1° ±30' ±20' ±10' Weight :- 8.76 KG
REMOVE BURRS, SHARP EDGES & CORNERS Scale:- NTS - Page No.:-1 OF 1
DO NOT SCALE 0.5 X 45°, UNLESS OR OTHERWISE SPECIFIED ALL DIMENSIONS ARE IN mm Rev.No Drawn Checked Description Date Heat Treatment:- - Projection:- - Sheet:-
1 2 3 4 5 6 7 8 9 10