Sheet No. Sch No.

1 of 6 BBS-
Date :
Calculated By:
2/19/2020

PROJECT:UPGRADING OF LOKICHAR - LOICHANGAMATAK(A1) ROAD

CONTRACTOR : CHINA STATE CONSTRUCTION ENGINEERING CORPORATION

TITLE:CONCRETE VOLUMES

CONCRETE SUMMARY

TOTAL VOLUME IN
CLASS OF CONCRETE BRIDGES
Class 35/20 2033.65592
Class 30/20 4829.66545
Class 15/40 77.7223
TOTAL CONCRETE
VOLUME (M^3) = 6941.04367
Revision
R0

Checked By:
PROJECT:UPGRADING OF LOKICHAR - LOICHANGAMATAK(A1) ROAD
Sheet No. Sch No.

CONTRACTOR : CHINA STATE CONSTRUCTION ENGINEERING 2 of 6 BBS-


CORPORATION Date :
Calculated By:
TITLE:CONCRETE VOLUMES 2/19/2020

Length
Width of Height of
Class of No.of of
Structure Type Member Description member member
Concrete Members member
(M) (M)
(M)

Class 35/20
2 7.6 0.225
OUTER DECKS 18.95
Class 35/20
5 7.6 0.225
INNER DECKS 18.35
Barrier on Class 35/20
deck 2 129.8

OUTER BEAMS
Class 35/20 10
0.75 1.6
OUTER BEAMS
Class 35/20 25
18.22 0.75 1.6
End Stiffeners Class 30/20
56 1.35 0.4 0.6

Mid Stiffeners Class 30/20


112 1.35 0.25 0.4

APPROACH Class 30/20


SLAB 2 2 7.6 0.2
ABUTMENT Class 30/20
FOUNDATION 2
PIER Class 30/20
FOUNDATION 6 13.6 7.2 1.4
BRIDGE KM
Bridge 4+459 Class 30/20
PIERS 6
One Pier = 50.3966
ABUTMENT WALL Class 30/20
1 1
11.45
ABUTMENT WALL Class 30/20
1 1
11.45

WINGWALL 1 Class 30/20 1

WINGWALL 2 Class 30/20 1

WINGWALL 3 Class 30/20 1


WINGWALL 4 Class 30/20 1

ABUTMENT &
PIER PILES Class 30/20 144 VOLUME OF 1 PILE = 3.7997

WINGWALL
PILES Class 30/20 48 VOLUME OF 1 PILE = 1.3683

Blinding Class 15/40


Concrete

Total for Bridge Km4+459

CLASS OF CON

Class 35/20

Class 30/20

Class 15/40
Sch No. Revision
BBS- R0

Calculated By: Checked By:

X-Section
Total Volume
area for
of member
Radius of Complex
(M^3)
member members
(M)

64.8090

156.8925

1.023 265.5708

12.0000

546.6000

18.1440

15.1200

6.0800

440.3400

822.5280

302.3796

7.8359 89.7211

8.0339 91.9882

42.1594

41.9358

42.7602
43.6603

0.375 547.1568

0.225 65.6784

46.0915
Total for Bridge Km4+459 = 3661.6155

CLASS OF CONCRETE

Class 35/20 CONCRETE = 1045.8723

Class 30/20 CONCRETE = 2569.6517

Class 15/40 CONCRETE = 46.0915


PROJECT:UPGRADING OF LOKICHAR - LOICHANGAMATAK(A1) ROAD
Sheet No. Sch No.

CONTRACTOR : CHINA STATE CONSTRUCTION ENGINEERING 3 of 6 BBS-


CORPORATION Date :
Calculated By:
TITLE:CONCRETE VOLUMES 2/19/2020

Length
Width of Height of
Class of No.of of
Structure Type Member Description member member
Concrete Members member
(M) (M)
(M)

Rectangular Class 35/20


slab 1 20.2 7.6 0.225

Barrier on Class 35/20


deck 2 20.2

Beams Class 35/20


5
19.55 0.6 1.9
Stiffeners Class 30/20
20 1.5 0.25 0.4

APPROACH Class 30/20


SLAB 2 2 7.6 0.2

BRIDGE KM ABUTMENT Class 30/20


Bridge FOUNDATION 2
10+892
ABUTMENT Class 30/20
WALLS 2
11.45
Class 30/20
WINGWALL 1&2 2

WINGWALL 3 Class 30/20


1

WINGWALL 4 Class 30/20


1

Blinding Class 15/40


Concrete

Total for Bridge Km10+89

CLASS OF CON
Class 35/20
Class 30/20
Class 15/40
Sch No. Revision
BBS- R0

Calculated By: Checked By:

X-Section
Total Volume
area for
of member
Complex
Radius of (M^3)
members
member
(M)

34.5420

1.1102 44.8521

111.4350

3.0000

6.0800

300.6678

7.4801 171.2943

71.0254

31.2259

38.7606

14.5297
Total for Bridge Km10+892 = 827.4128

CLASS OF CONCRETE
Class 35/20 CONCRETE = 190.8291
Class 30/20 CONCRETE = 622.0540
Class 15/40 CONCRETE = 14.5297
PROJECT:UPGRADING OF LOKICHAR - LOICHANGAMATAK(A1) ROAD
Sheet No. Sch No.

CONTRACTOR : CHINA STATE CONSTRUCTION ENGINEERING 4 of 6 BBS-


CORPORATION Date :
Calculated By:
TITLE:CONCRETE VOLUMES 2/19/2020

Length
Width of Height of
Class of No.of of
Structure Type Member Description member member
Concrete Members member
(M) (M)
(M)

Rectangular Class 35/20


slab 1 46.2 7.6 0.225

Barrier on Class 35/20


deck 2 46.2

Outer Beams Class 35/20


10
15.3 0.6 1.4
Class 35/20
5
Inner Beams 15 0.6 1.4
Stiffeners Class 30/20
48 1.5 0.25 0.4
APPROACH SLAB Class 30/20
2 2 7.6 0.2
ABUTMENT 1 Class 30/20
FOUNDATION 1
ABUTMENT 2 Class 30/20
FOUNDATION 1

BRIDGE KM PIER Class 30/20


Bridge FOUNDATION 2
21+568 7 4 1.1
PIER Class 30/20
2
ABUTMENT WALL Class 30/20
1 1
11.45
ABUTMENT WALL Class 30/20
2 1
11.45
WINGWALL 1 Class 30/20
1

WINGWALL 2 Class 30/20


1

WINGWALL 3 Class 30/20


1

WINGWALL 4 Class 30/20


1
Blinding Class 15/40
Concrete

Total for Bridge Km21+568

CLASS OF CONC
Class 35/20
Class 30/20
Class 15/40
Sch No. Revision
BBS- R0

Calculated By: Checked By:

X-Section Total
area for Volume of
Radius of Complex member
member members (M^3)
(M)

79.0020

1.1102 102.5825

128.5200

63.0000

7.2000

6.0800

142.9124

122.5517

61.6000

92.4166

7.0781 81.0442

8.0077 91.6882

29.6904

30.3860

37.5924

32.8942
17.1011
Total for Bridge Km21+568 = 1126.2617

CLASS OF CONCRETE
Class 35/20 CONCRETE = 373.1045
Class 30/20 CONCRETE = 736.0561
Class 15/40 CONCRETE = 17.1011
PROJECT:UPGRADING OF LOKICHAR - LOICHANGAMATAK(A1) ROAD
Sheet No. Sch No.

CONTRACTOR : CHINA STATE CONSTRUCTION ENGINEERING 4 of 6 BBS-


CORPORATION Date :
Calculated By:
TITLE:CONCRETE VOLUMES 2/19/2020

Length
Width of Height of
Class of No.of of
Structure Type Member Description member member
Concrete Members member
(M) (M)
(M)

Rectangular Class 35/20


slab 1 12.2 7.6 0.225

Barrier on Class 35/20


deck 2 12.2

Beams Class 35/20


5 11.55 0.5 0.9

Stiffeners Class 30/20


12 1.5 0.25 0.4
APPROACH SLAB Class 30/20
2 2 7.6 0.2

BRIDGE KM ABUTMENT Class 30/20


Bridge FOUNDATION 2
24+975
Class 30/20
ABUTMENT 2 11.45
WALLs
WINGWALL 1 Class 30/20
1

WINGWALL 2 Class 30/20


1

WINGWALL 3 Class 30/20


1

WINGWALL 4 Class 30/20


1

Total for Bridge Km24+97

CLASS OF CONCR
Class 35/20
Class 30/20
Class 15/40
Sch No. Revision
BBS- R0

Calculated By: Checked By:

X-Section Total
area for Volume of
Radius of Complex member
member members (M^3)
(M)

20.8620

1.1102 27.0889

25.9875

1.8000

6.0800

119.1668

5.8132 133.1223

22.74

23.8706

23.8519

20.7550
Total for Bridge Km24+975 = 425.3291

CLASS OF CONCRETE
Class 35/20 CONCRETE = 73.9384
Class 30/20 CONCRETE = 351.3907
Class 15/40 CONCRETE = 0.0000
PROJECT:UPGRADING OF LOKICHAR - LOICHANGAMATAK(A1) ROAD
Sheet No. Sch No.

CONTRACTOR : CHINA STATE CONSTRUCTION ENGINEERING 6 of 6 BBS-


CORPORATION Date :
Calculated By:
TITLE:CONCRETE VOLUMES 2/19/2020

Length
Width of Height of
Class of No.of of
Structure Type Member Description member member
Concrete Members member
(M) (M)
(M)

Rectangular Class 35/20


2 19.6 7.6 0.225

Barrier Class 35/20


4 19.6

Beams Class 35/20


10 19.2 0.6 1.7

Stiffeners Class 30/20


40 1.5 0.25 0.4
APPROACH SLAB Class 30/20
2 2 7.6 0.2
ABUTMENT 1 Class 30/20
FOUNDATION 1 1
ABUTMENT 2 Class 30/20
FOUNDATION 1 1.1
BRIDGE KM
Bridge
26+806 PIER Class 30/20
FOUNDATION 1 4 7 1.1
ABUTMENT WALL Class 30/20
1 1 11.45
ABUTMENT WALL Class 30/20
2 1 11.45
PIER Class 30/20
1 6.1
WINGWALL 1 Class 30/20
&2 2 6.5
WINGWALL 3 Class 30/20
1
WINGWALL 4 Class 30/20
1

Total for Bridge Km26+80

CLASS OF CONC
Class 35/20
Class 30/20
Class 15/40
Sch No. Revision
BBS- R0

Calculated By: Checked By:

Total
X-Section area
Volume of
Radius of for Complex member
member members
(M^3)
(M)

67.03

1.1102 87.04

195.84

6.00

6.08

121.8629 121.86

133.0947 146.40

30.80

3.9691 45.45

6.0325 69.0721

2.4672 15.0499

3.56685 46.3691

24.3858

39.0428
Total for Bridge Km26+806 = 900.4246

CLASS OF CONCRETE
Class 35/20 CONCRETE = 349.9117
Class 30/20 CONCRETE = 550.5130
Class 15/40 CONCRETE = 0.0000