Commercial scale PV systems present enormous onsite efficiency, the required time for complete
opportunities to our industry. However the installation, the system costs and customer returns.
requirements to source and verify a range of site-
Why use a system design?
specific data over a large site is challenging. To then
ensure this data correctly forms part of all aspects A system design created by an engineering
of the system’s performance and installation consultant provides the installer with complete
requirements can be complicated and unfamiliar to information to deliver an installation efficiently and
some system designers and installers. smoothly. Using a specialist for this design work
provides benefits, including:
Possible scenarios: How to ensure the correct
cable distances and gauges have been calculated; • Increased margins – engineering design will
the site requires zero PV export or additional grid optimise cable, module and racking locations
protection – what products support this and how resulting in quicker installation and reduced
are they programmed; how to avoid confronting the material requirements.
need for unplanned additional work on site; is the • Access to projects beyond current skill level
Bill of Materials for this installation comprehensive – engineering design services can provide
- are there sufficient materials to complete the the the installation methodology for projects
installation? Clients often request financial data for that require advanced control and monitoring
the proposed installation: IRR, LCOE – as system systems using PLCs and zero export relays.
designers, these calculations must be able to be
justified by the system design and performance • Market access to larger project pools – larger
data. The prospect of engaging in quotations for projects often require detailed engineering
larger installations is daunting – do you have the designs that an installer does not have time
skill set to meet the market? to complete. An engineering consultancy
can complete these and complement them
Page | 1
Copyright © 2015 Global Sustainable Energy Solutions Pty Ltd. All Rights Reserved.
www.gses.com.au
0.7
0m
Preliminary and detailed system designs are a
0.7
0m
Array 3 (assumed) purlin
0.7
spacing 1200mm
0m
practices from competitors. These documents
provide the analytical platform underpinning Array 2 purlin
0.7
spacing 1200mm
0m
the optimisation of system installation and Array centered on middle of roof
0m
COUNCIL
A detailed design is the installation road map: it
Print: A3
Project & drawing name/number: SP-294-004 REVISIONS
drawings, elevations, inverter station drawings, PRIVATE & CONFIDENTIAL. Copyright © 2015 Global Sustainable Energy Solutions Pty Ltd . All Rights Reserved. Pg 1
electrical drawings, protection and zero export • System design calculations –The number of
schematics and a bill of materials. In addition the modules in series and parallel, cable, isolator,
accompanying detailed report explains the design circuit breaker sizes, MPPT configurations,
choices and installation methodology. An installer inverter inputs and system protection
can safely follow these drawings knowing the requirements.
system will meet the CEC, Australian Standards and
DUAL MPPT STRING CALCULATIONS
best practice guidelines. GSES’ design report also Arrays 1-7
Array Overview Calculations String Ca
complies with the DNSP document requirements MPPT1 MPPT2
and existing electrics. This assessment can be Inverter and AC Protection Calculations Array Cab
by the installer. When the latter is used the AC Breaker min Current (A)
36.20
Max AC current [per phase; line to neutral] (A)
36.20
DC Cable R
Min cable
Creating sustainable change through education, communication and leadership Max Modules Safety Factor
Min Modules Safety Factor
5.0%
10.0%
Absolute Min Number of Panels 9 9
Min Number of Panels 16 16
Max Number of Panels 23 23
Absolute Max Number of Panels 26 26
Copyright © 2015 Global Sustainable EnergyOptimal
Solutions
NumberPty Ltd. All
of Panels Rights Reserved. 20 20
www.gses.com.au
between the PV array, inverter, electrical CONDITIONS (STC). STC SPECIFIES THE MODULE TEST CONDITION A
TEMPERATURE OF 25 CELSIUS DEGREE AND AN IRRADIANCE OF 100
WITH AN AIR MASS 1.5 SPECTRUM.
MAIN SWITCHBOARD #1 protection equipment and MPPTs. 7. ALL EXPOSED CONDUCTIVE METAL COMPONENTS MUST BE
EQUIPOTENTIALLY BONDED AND CONNECTED TO MAIN EARTH
8. AC CABLES SIZE BASED ON INSTALLATION ON CABLE TRAY, SPACE
SURFACE CABLES TOUCHING ON TRAY 4C+E O/C V75
Key
9. MAIN AC SUPPLY CABLE TO PV DB BOARD SIZED TO 1% VOLTAGE
Main Switchboard To Meter To site loads ASSUMING MAXIMUM CABLE RUN OF 60m. EXACT CABLE LENGTH TO
L1
250/5A
Board Circuit breaker VERIFIED BY INSTALLER.
L2
L3
N Switch disconnector (on-load isolator)
E
2A HRC
Moulded case circuit breaker
Fuse
CT termination
Inverter 1 Power Control Module Inverter 2 Power Control Module Inverter 3 Power Control ModulePRIVATE
Inverter& CONFIDENTIAL.
4 Power Control Module Copyright © 2015 Global Sustainable Energy Solutions Pty Ltd . All Rights Reserved.
NOTES:
Scale:
REVISION HISTORY
PRIVATE & CONFIDENTIAL. Copyright © 2014 Global Sustainable Energy Solutions Pty Ltd. All Rights Reserved. Pg 1
• Bill of materials – The bill of materials (BOM) is Figure 6. String layout, designating
PLAN VIEW DIAGRAM - CLENERGY MOUNTING SYSTEM REMARKS ...
based on the design drawings and schematics. Project & drawing name/number:
modules to selected inverter and string.
GE-281-004
PRIVATE & CONFIDENTIAL. Copyright © 2014 Centsible Energy. All Rights Reserved.
PV System Design: How to compete effectively in the wider market place Page | 3
Copyright © 2015 Global Sustainable Energy Solutions Pty Ltd. All Rights Reserved.
www.gses.com.au
the competition.
GSES offers engineering consulting services,
including feasibility studies, system design, tender
preparation and evaluation, commissioning,
inspection and performance review services.
CABLE ENTRY POINT USING DEKTITE FLASHING
DRAWN REVIEWED
Print:
APPROVED
A3
100
80
Energy kWh
60
40
20
0
1
7
13
19
25
31
37
43
49
55
61
67
73
79
85
91
97
103
109
115
121
127
133
139
145
151
157
163
169
175
181
187
193
199
205
211
217
223
229
235
241
247
253
259
265
271
277
283
289
295
301
307
313
319
325
331
Conclusion
The system design process and the
documentation provided allows the installer to
visualise the installation, predict and mitigate
installation issues and provide accurate data on
performance and performance and financial returns
to the customer. At the same time, this information
provides a potential for installation cost savings by
reducing the material requirements and the time to
completion – this improves the installer’s margins.
System designs can be used as promotional material
to win contracts and differentiate your service from
PV System Design: How to compete effectively in the wider market place Page | 4
Copyright © 2015 Global Sustainable Energy Solutions Pty Ltd. All Rights Reserved.