Orbit Facility Profile
Orbit Facility Profile
Orbit Facility Profile
Schlumberger - Private
Schlumberger-Private
Little Rock HSE Event Reporting & Highlights
2019 TRIF
1.93
Schlumberger - Private
Schlumberger-Private
Agenda
VPS – Little Rock Plant & Product Overview
Delivery Improvements
Cost Improvements
Plant Transformations
Schlumberger - Private
Schlumberger-Private
Little Rock Product History
1912 Oilwell Improvements Company of Tulsa, Oklahoma was founded
1937 The first Orbit Rising Stem Ball valve was manufactured
Schlumberger - Private
Schlumberger-Private
Little Rock Facility Overview
PLANT CAPACITY CURRENT HEADCOUNT
30000
Direct/Indirect 240
25000
20000
Support Staff 129
15000 TOTAL 369
10000
Product Engineering 23
5000
Mfg. Engineering 9
0
2016 2017 2018 2019 2020 Plnd
Quality Engineering 7
Units Produced Max Demonstrated Capacity
Theoretical Capacity
Schlumberger - Private
Schlumberger-Private
Little Rock Product Offering
Product Line Graphic Size Range Pressure Units Units Units Units
Styles Classes Produced Produced Produced Scheduled
2017 2018 2019 2020
Orbit
150 -
Rising Stem 1”-24” 6,490 9,747 9,127 5,323
2500
Ball Valve
Total
Units 12,538 15,951 13,532 6,795
Produced
Schlumberger - Private
Schlumberger-Private
Little Rock Manufacturing Technology
Turning Max Diameter: 70.5”
Max Height: 59”
Milling X axis travel: 110”
Y axis travel: 61”
W axis travel: 71”
Machine Table: 55” x 55”
Weld PTA Hardface Overlay, SMAW, GMAW,
GTAW, PTA, Stellite 6, Nickel, Hastelloy
Assembly, Test, Paint 25 Ton lift capacity
Valve Automation
10,000 psi Hydro
Fugitive Emissions Testing
Gas and Cold Box Testing
Quality CMM Dimensional
Calibration Lab
Mag Particle Inspection
Dye Penetrant
Positive Material Identification
Schlumberger - Private
Schlumberger-Private
Little Rock Plant Staff
V&M
V&M
EMS
Inside Sales
Engineering
Amelia Bardwell
Plant Manager
Joe Keaton Todd Case Christian Douglas Anglin John Nelson Richard
V&M Proposals Product Engr Kardas Supply Chain Manufacturing Warehime
Mgr Mgr Materials Mgr Mgr Mgr Mfg Engr Mgr
Darcy Krupitsky Tommy Schichtl Thane Krile Frank Devere Jennifer Mitchell Ann Mantooth Peggy Mills
Sales Ops Mgr Quality Mgr HSE Mgr Controller HR Mgr HR Mgr Sr. Admin Asst.
Schlumberger - Private
Schlumberger-Private
Little Rock Sales Operations Organization
Darcy Krupitsky
Manager of Sales Ops
Cornelius Simmons
Andre Akins Brian Rogers
Customer Service Team Documentation
Project Manager Project Costing Lead
Specialist
Susan Copenhaver
Sandra Johnson
Project Manager Sadira Fergusson Order Management Improvements
• Increased focus on customer service and
Martha Highsmith communication
Jaranimo Marks • Implementation of risk tool, CRITER
Project Manager Liz Miller
• Evaluation and improvement of all policies
and procedures for project management.
Fredy Para
Steve Goldberg
• Face-to-face customer meetings and
Project Manager
Kasey Steed
attendance at Kick-off Meetings
Schlumberger - Private
Schlumberger-Private
Little Rock Materials Planning Organization
Christian Kardas
Materials Manager
Diana Howard Greg Iosbaker Cynthia Daughtery Brenda Jackson Darla Brooks
Planner Planner Master Scheduler Master Scheduler Planner
Tommy Henthorne Pamela Kolton
Planner Planner
Materials Planning Highlights
Melanie Strozyk Joshua Kukielka • Addition of Global Services value stream team
Planner Planner
• Dedicated teams for Short Term and Long Term Planning
Carla Rix Major White • Planning Managers own demand analysis for S&OP Cycle and
Planner Planner Forecasting of respective product lines/value streams
Charlene Steele Jake Shed • Dedicated planners for respective product lines/value streams
Planner GRDP - Planner
Schlumberger - Private
Schlumberger-Private
Little Rock Engineering Organization
Todd Case
Process & Refining
Engineering Manager
Shannon McLaughlin
Matthew Ragland Kevin Peel
Sustain Engineering
Product Lead Supervisor Application Lead
Supervisor
Holly Johnson
Katharine Eckman Dominic Rose Andrew Tilley Bulmaro Campanur Application Lead - GV
Engineering Highlights
• Dedicated teams for New Product Development, Order Engineering, and Applications Engineering
• Recent Patent awards for General Valve stem set, General Valve trunnion connection, Orbit valve roller guide pin
Schlumberger - Private
Schlumberger-Private
Orbit Lead Time Reductions
Orbit Lead Times Orbit Lead Time Reductions (50 to 36 Weeks)
60
• Core output throughout 2018 increased 70%
Weeks EXW, Little Rock
50
• Capped distribution capacity at 50%
40
• Loading forecast from demand plan/S&OP
30
• Valve Kits
20
10
• Trim Kits
0
• Actuator Kits
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 • Turnkey components
2018 2019
35
30
25
• Capping distribution capacity at 60%
20
15
• Loading forecast from demand plan/S&OP
10
5
0
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
2018 2019
GV GV Goal
Schlumberger - Private
Schlumberger-Private
Little Rock Past Due and OTD
35,000 Clean Fuels 90%
80%
30,000
70%
25,000
60%
$3.3M
$2.8M
Q3 Q4 Q1 Q2 Q3
• Orbit Stems 6A718 • Orbit Stems 8620 • Turnkey Orbit Stems • Bonnet design • BCC Source H8 & H
Inconel & 660 material, new end- standardization type seat
Material, new end- mill • Orbit core welding components (Inner
mill equipment • Enhanced Packing & Outer Rings)
• Orbit body, fixturing modernization on Bonnets
• Orbit bodies & improvements • Review features on
bonnets (Turnkey • Re-sourcing of XL • Standardization on the 1-pieces stem
continuation) • Single Layer overlay Bodies & Bonnets 6A 718 Material for cycle time
design, cycle time from Peekay (elimination of heat savings, and cost
• Orbit assembly savings treat operations) (plating/coating)
kitting labor cost • Ni Alloy alternative
reduction BCC source
Schlumberger - Private
Schlumberger-Private
General Valve Cost Reduction Ambition
Target of 30% Reduction by 2021
• 2019 – 8%
• 2020 – 6.5%
$3.1M (14.0%)
• 2021 – 4% $2.8M (12.6%)
$0.3M
$2.4M (10.8%) $0.4M
Q4 Q1 Q2 Q3
Schlumberger - Private
Schlumberger-Private
Machining Cycle Time Improvements
Manufacturing Engineering and Production teams evaluated our tool usage for
difficult material of Orbit Stems:
This improvement approach is being applied to other components with standard labor and tooling savings
Schlumberger - Private
Schlumberger-Private
Orbit Core Welding- Welding Cycle Time Improvements
16”-24” Weld engineering project – throughput
improvement
Schlumberger - Private
Schlumberger-Private
Assembly Kitting- Assembly Cycle Time Improvements
Current Status:
• Implemented for Orbit Small Bore, Orbit Large Bore, and
General Valve
• Delivering full valve kits to assembly rather than
individual components
• Already seeing 30% CT reduction in assembly build
times
Benefits:
• Supports future growth and Assembly Layout
improvement
• Reduces WIP and other Non Value Added activities in
assembly
• Improved lean flow – one piece flow
• Better schedule attainment
Schlumberger - Private
Schlumberger-Private
Plant Transformation- Visual Factory
Lighting
Machine Painting
Machine skirting
Schlumberger - Private
Schlumberger-Private
Plant Transformation- Warehouse Improvements
Kitting
New Warehouse
Additional racks
Optimized storage
Schlumberger - Private
Schlumberger-Private
Plant Transformation- Improvements Everywhere
Digital SFDM Boards Customer Inspection Office Upgraded Test Camera System
Expanded Tool Crib Digital Kitting/WH Pick List Ergonomic Point of Use Racks
Schlumberger - Private
Schlumberger-Private
Plant Transformation- Improvements Everywhere
Digital SFDM Boards Customer Inspection Office Upgraded Test Camera System
Expanded Tool Crib Digital Kitting/WH Pick List Ergonomic Point of Use Racks
Schlumberger - Private
Schlumberger-Private