Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Self Assessment and Reflection SO (L) 2018

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

SELF-ASSESSMENT AND REFLECTION ON ATTAINMENT OF STUDENT OUTCOME (l)

Student Outcome l: knowledge and understanding of engineering and management principles as a member and
leader in a team, to manage projects and in multidisciplinary environments.

Name of Student: _______________________________ Program: _______________


Course: _______________ Section: ________ __1st__Term/SY 2020-2021_____

A. SELF-ASSESSMENT: Rate yourself on your attainment of SO (l) based on the performance indicators below:

Not attained Attaining Attained


Performance Indicators Score
1 2 3
1. Goal setting Cannot identify goals for Can identify goals but Identifies and articulates
the project some are not realistic goals which are SMART 3
and doable
2. Action Planning Does not know how to Writes plan of actions Translates goals to
write plan of actions with incomplete details actions with designation,
3
timeframe and resources
needed
3. Cost Estimation Does not consider Does cost estimation but Does cost estimation
3
proper cost estimation lacks details with complete details
4. Professional practice Unfamiliar with Knows some Applies professional
professional practice professional practice practice such as conflict
issues related to project issues related to project resolution, negotiation, 3
management management but lacks organization, etc.
application
5. Preparation and Does not have a Knows how to prepare Has full knowledge on
presentation of knowledge on project management how to prepare project
project management preparation of project documents but does not management documents 3
documents management documents know how to present and presents them in the
them properly most effective way
6. Project progress Does not monitor project Monitors project but Monitors project and
monitoring and does not assess assesses progress 3
assessment progress properly
7. Leadership and May not be a team Understands the Recognizes the role of
teamwork player and does not significance of project leadership and
understand significance leadership and value of teamwork to
3
of teamwork to project teamwork but unable to project success
success apply it to project
success
Total Score 21
Percentage Rating = (Total Score / 21) x 100% 100%

________________________
Signature of Student Date
SELF-ASSESSMENT AND REFLECTION ON ATTAINMENT OF STUDENT OUTCOME (l)

Student Outcome l: knowledge and understanding of engineering and management principles as a member and
leader in a team, to manage projects and in multidisciplinary environments.

Name of Student: _______________________________ Program: _______________


Course: _______________ Section: ________ __1st__Term/SY 2020-2021_____

B. REFLECTION:
1. Which among the performance indicators you are best at? State how the course helped you perform.

2. Which among the performance indicators you are weakest at? Suggest some ways on how you think the course
could have helped you perform better.

________________________
Signature of Student Date

You might also like