Floor Plan Front Elevation Right Side Elevation: A-1 G:/Fci-Hermosa Water Permit/Vwssi Logo - JPG

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

4.50 1.

50

1.20
0.15
4.50
W-2

0.80 0.80 0.80 0.80

2.70

2.55
GENSET ROOM PUMP ROOM
2.50

W-2 W-2

0.90
0.30
D-2 D-1
4.50 1.50 2.50
4.20
6.30 2.80

1 FLOOR PLAN 1 FRONT ELEVATION 1 RIGHT SIDE ELEVATION


A1 SCALE NTS A1 SCALE NTS A1 SCALE NTS

1.20
0.15

0.80 0.80
2.70

0.90

0.90
0.80

0.30

4.50 1.50 2.50


6.30 2.80

1 REFLECTED CEILING PLAN 1 REAR SIDE ELEVATION 1 LEFT SIDE ELEVATION


A1 SCALE NTS A1 SCALE NTS A1 SCALE NTS

4.20
0.80
1.20
1.20

D-1
2.50
2.10

PANEL DOOR

W-1
0.90

STEEL CASING WINDOW


F.F.L. F.F.L.

OWNER/DEVELOPER: CERTIFIED BY: PROJECT TITLE : SHEET CONTENTS : OWNER / S : SHEET No :

ENGR. ROBERTO V. SUAREZ PROPOSED: VILLAGES WATER SUPPLY SYSTEM INC. AS SHOWN A-1
PUMPROOM W/ GENSET ROOM VILLAGES WATER SUPPLY SYSTEM INC
REGISTERED CIVIL ENGINEER
SHEET TOTAL :
G:\FCI-HERMOSA WATER PERMIT\VWSSI LOGO.jpg PRC No : 0049354 DATE ISSUED : 01/2019
PROJECT LOCATION :

PTR No : 7450622 PLACE : QUEZON CITY BRG. BALSIC, HERMOSA, BATAAN ADDRESS : HLDC CORPORATE CENTRE, BLK 43 LOT 35,
TIN No : DON BONIFACIO AVE, PULUNG MARAGUL, ANGELES CITY