D-1 D-2 D-3 D-4: Door Schedule
D-1 D-2 D-3 D-4: Door Schedule
D-1 D-2 D-3 D-4: Door Schedule
90
1.00 1.00 1.50
0.70
0.60
F F
0.20
0.90
2.80
2.80
2.10
2.10
2.10
2.10
1.00
FIN. FLOOR LINE FIN. FLOOR LINE FIN. FLOOR LINE FIN. FLOOR LINE
LOCATION: 1 unit - GROUND FLOOR @ Entrance door. 2 units - GROUND FLOOR (1 unit @ Storage room for equipment and 1 unit - GROUND FLOOR (1 units @ CDRRMO chief office) 3 units - GROUND FLOOR (1 unit @ Training center &
1 unit @ Storage room for food) 1 unit - SECOND FLOOR (1 units @ IT office & Viewing area) 2 units @ Alley/corridor exit door ).
3 units - SECOND FLOOR (1 unit @ Korona 911 center, 1 unit Emergency operation
room and 1 unit @ Alley/corridor exit door ).
0.90 0.80
0.90 0.70
0.20
0.20
0.90
2.10
2.10
2.10
2.10
1.00
FIN. FLOOR LINE FIN. FLOOR LINE FIN. FLOOR LINE FIN. FLOOR LINE
LOCATION: 1 unit - GROUND FLOOR (1 unit @ Training center) 1 unit - GROUND FLOOR (1 unit @ Mess hall/Kitchen) 3 units - GROUND FLOOR (2 units @ Common toilet of alley, 1 unit @ Toilet of 2 units - GROUND FLOOR (1 unit @ Mess hall/Kitchen, 1 unit @ Electrical Pipe chase)
2 units - SECOND FLOOR (2 units @ Conference room) 5 units - SECOND FLOOR (1 unit @ Storage room, 1 unit @ IT office, 1 unit @ Training center).
Radio room, 1 unit @ Review & 1 unit @ Operator's quarter) 4 units - SECOND FLOOR (2 units @ Public toilet, 1 unit @ Electrical room
1 unit @ Control room)
DOOR SCHEDULE
SCALE: 1:60 MTS
PREPARED BY: CHECKED BY: CHECKED/REVIEWED BY: PROJECT TITLE: RECOMMENDING APPROVAL: RECOMMENDING APPROVAL: APPROVED BY: SHEET No.