Sample 2 Visual Resume
Sample 2 Visual Resume
Sample 2 Visual Resume
Seeking senior level assignments Project Management / Site Administration / Reports & Documentation
with a leading organization of repute in Oil & Gas industry preferably in GCC Countries
Profile Summary
A seasoned professional with nearly 24 years of commendable success in:
maximizing efficiency
Organizational Experience
Since Jul’ with Dar/xxxxxxxx International, KSA as Project Engineer Sr. (Mechanical & Piping)
maintenance slots
o Final documentation in As Built status as Project Record Books submitted to Proponent
o EPC contractor’s loading , transportation, rigging & installation procedures/ permits for all Vessels/ Columns &
heavy equipment as well as EPC contractor claims and invoices as per contractual SOW
Proven track record of ensuring that all the EPC Contractor Project deliverables according to contract schedules and
contractor’s works are conforming to required specifications, standards and best industrial practices
Carrying out the clash checks using 3D model and detail review of Model before and during construction phase
Keeping the track of the project on day to day basis & plot deviation trends to take corrective action if required
Administering the actual progress with base line schedule for variance; rendering services as a part of Safety
Committee to ensure HSE at worksite
Single-handedly managing overall:
o Vessel final inspections and close out
o Pumps installation and alignment checks
o Nitrogen Helium Gross leak test witness
o Pre-commissioning and commissioning support till final
MCC o SPDP (Spare Parts Data Package), compilation and
validation of Spare parts requirement for Mechanical/
Electrical/Instrumentation, in co-ordination with Purchase
department
o Support operations/ maintenance during T & A
maintenance activities/ Plant restart
o Start –up and commissioning of the plant till Performance
Acceptance Test completion
o Master punch data base by system wise in order to close
and facilitate for handover of facilities with exception items
to Proponent
Handling review meetings with company Technical Support
Division (TSD), Operations Division (OND), etc., for plant
improvement and enhancement scope
Looking after the piping fit-ups and welding of CS/SS/DSS/Cu
Ni Piping at workshop & Field
Ascertaining the:
o Strength test of various piping systems, including pre-test
and post-test checks, flushing, chemical cleaning and lay-up
of piping systems, etc.
o FAT /PAT inspections as company representative at Vendor’s/Supplier’s factory
Deftly ensuring that all project objectives are met before issuing final MCC to contractor
Managing the job safety analysis reviews, method statements review and approval, critical lifting activities review
and submit for ISD approval
Major Projects:
PMS Contract, for Khafji Joint Operations (KJO), a Joint Venture of Saudi Aramco Gulf Operations (AGOC) and Kuwait
Gulf Oil Company (KGOC) to provide Project Management Services during improvements and enhancements of the
existing KJO facilities worth approx., $2.2bn
New Offshore Jackets and Top side facilities and a new sub-sea pipe line Ø Gas line and two Ø 0 crude oil lines
Onshore facilities includes Crude Oil & Gas reception and separation in 3 phase separators, Crude oil
approx.,300KBOPD, Gas Compression and processing up to 127MMSCFD, NGL production, Lift gas to Offshore up to
50MMSCFD
Utilities includes Instrument & Plant air, fresh water, nitrogen distribution, etc., HP, LP, Dry & Wet Ground flare system
Underground RTR fire network and open drain network; propane refrigeration cooling system, hot oil system, etc.
Jan’ -Oct’ with xxxxxxxxx Offshore Marine, Singapore as Senior Piping Engineer
any deviations
o Resolving site issues by mutual discussions in daily progress meetings with client
o Controlling over 200 multi-national work force (Contractor and Yard labor) every day, including supervisory staff
o Complete Integration of Vessel piping to Turret & Topsides
o Hook up piping between Pipe rack & Modules.
o Taking over unfinished Carry over job scope from modules yards contractors
o High pressure process piping Installation and Testing, Liaise on Nitrogen and Helium Strength test
o Defining test limits in the preparation of Test packs
o Evaluation of Subcontractors invoices by verifying the
variations Ensured proper coordination with:
o Clients and Class Surveyors in order to complete the project within stipulated time
o Clients’ project team to resolve various technical issues for raising and approving variation order quantities
basing on initial project specification, for final close out of project
Carried out the study of complete piping job scope (Conversion and Refurbishment), basing on project specification
and available P&IDs for man hours and material estimation
Maintained track for Engineering IFC drawings and preliminary MTO deliverables
Assigned the targets by establishing the mini schedules (WBS basing on Project EPC schedule) for the timely
completion of project
Managed the team of yard Foremen/Engineers in the actual measurement of contractor’s work scope
Proactively organized Monthly Section Review presentations with KPI’s, Cost control budget summery, Management
expectations, etc.
Imparted training to new recruits
Highlights:
Received Safety Excellency Awards for successful and timely project completion
Meticulously contributed in Two to Five Million Accident free Man hours and Productivity bonus & safety bonus on
most of the vessels
Holds the credit of achieving weeks ahead schedule delivery of some of the projects with strong team
work Rewarded with the letter of commendation for Excellent Performance for the year:
o 2004 from Management with 1 month Extra Bonus (Company declared 4.2 months + 1month)
o 2005 from Management with 2 months Extra Bonus (Total 7.2 Months)
o 2006 from Management with 2 months (EVA) Extra Bonus (Total 9.2 Months)
o 2007 from Management with 6 months (EVA) Extra Bonus (Total 14.2 Months)
Major Projects (FPSO Conversion):
FPSO Brazil a fully converted FPSO project with internal
Turret comprising of process and utility modules for
SBM (Owner Petrobrass)
FPSO Serpentina a fully converted FPSO project with
external Turret including process and utility modules
for SBM (Owner Exxon Mobil)
FPSO Marlimsul a fully converted FPSO project with
external Turret including process and utility modules
for SBM (Owner Exxon Mobil)
FPSO Berge Helene a fully converted FPSO project with
external Turret including process and utility modules
for Bergesene –Norway (Owner Woodsite Energy)
FSO Nordic Rio and Nordic Brasilia FSO projects
FPSO Polvo a fully converted Project with internal Turret
including process and utility modules for Prosafe FPSO
Vincent for Maersk (Owner Wood Site Energy) a fully
converted Project with external Turret complete
with Process Modules
Mar’ -Mar’ 4 with xxxxxxxxx Saudi Heavy Industries, K.S.A as Design Engineer
Major Projects:
SAFANIA GOSP-4 Fixed Offshore Complex, Consisting of Production, Accommodation, Tie-in and Flare Platforms
including Connecting Bridges for Saudi Aramco
Alkhobar Desalination and Power Plant Phase-2 Pipe Rack Structures
Mar’ -Mar’ / Mar’ 4-Jul’ with xxxxxxxxx Shipyard Ltd., Visakhapatnam, India as Engineer
Academic Details
B.Tech. (Mechanical Engineering) in 1988
Knowledge Purview
In-depth understanding of following Codes & Standards:
o ASTM/API/DIN/BS/JIS Standards for Materials
o
o Saudi Aramco Desk Top Standards –
o NACE/ANSI/NORSAK Standards o SAES/SAER/SAEP/SAIP/SAMSS
o ASME B31.3, B31.4, B31.8. Piping Design Codes o AWS Welding Specification
ASME B16.5. Material Specifications ABS/DNV/LRS/BV/SOLAS Classification Rules
for Vessels
IT Skills
Well versed withMS Office (Word, Excel and PowerPoint), MS Projects &
Primavera AutoCAD2000, 3D Model-Navis Work Software & PDS, PDMS
Membership
Board Member (Finance) for Indian International School Khafji (IISK)
Personal Details