1 General Notes BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
A101
1 : 150 +251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
ABBREVIATIONS: ARCHITECTURAL SYMBOLS:
ACT - ACOUSTICAL TILE E.A. - EACH J.S.C. - JANITOR'S SINK CLOSET r. - RADIUS BUILDING / WALL SECTION AND OR EXTERIOR ELEVATION
ACM - ADVANCED CLINLCAL MMONITORING E.J./EXP. JT. - EXPANSION JOINT R. - RISER
EL./ELEV. - ELEVATION RAIL'G. - RAILING
A.D. - ACCESS DOOR K. CEM. - KEENE'S CEMENT RAD. - RADIATOR 88 SECTION IDENTIFICATION
ELEC. - ELECTRIC
A.DR. - AREA DRAIN ENCL. - ENCLOSURE KP. - KICK PLATE R.C.O. - RECESSED CONVECTOR OPENING DIRECTION VIEWED
A8.88
ADJ. - ADJUST (OR) ADJACENT ENT. - ENTRANCE R.D. - ROOF DRAIN SHEET WHERE SECTION IS DRAWN
EQ. - EQUAL REC. - RECESS
A.F.F. - ABOVE FINISHED FLOOR L. - LEADER REINF. - REINFORCING
EQUIP. - EQUIPMENT
A.F.G. - ABOVE FINISHED GRADE ETC. - ET CETERA LAM. - LAMINATED REQ'D - REQUIRED
AL or ALUM - ALUMINUM EXP. - EXPANSION LAV. - LAVATORY RET. - RETAINING
1
EXIST. - EXISTING LF - LINEAR FEET REV. - REVEAL DETAIL TARGET
APP'D. - APPROVED
RM. - ROOM A7.10
88
88
AUX. - AUXILIARY L.W.CMU - LIGHTWEIGHT CONCRETE S.A.E. - SAME AS EXISTING
F.D./FL.DR. - FLOOR DRAIN MASONRY UNIT(S)
& - AND SAD. - SADDLE DRAWING SHEET LOCATION
88
F.H. - FIRE HYDRANT SAN. - SANITARY
@ - AT SECT. - SECTION
FIN. - FINISH MAT'L. - MATERIAL
SH./SHELV'G. - SHELVING
FL./FLR. - FLOOR MAX. - MAXIMUM SHT. - SHEET
BET. - BETWEEN REVISION
FOUND. - FOUNDATION MET. - METAL SIM. - SIMILAR 1
B.C. - BRICK COURSE MAR. - MARBLE SL. - SLEEVE
- F.P. - FIREPROOFING
BD. BOARD SPEC. - SPECIFICATION
MECH. - MECHANICAL
B.L. - BUILDING LINE F.P.S.C. - FIRE PROOF SELF CLOSING SPEC'L - SPECIAL E1 CEILING TYPE
MISC. - MISCELLANEOUS SQ.FT. / S.F. - SQUARE FEET
BLD'G. - BUILDING FR. - FRAME
M.F. - METAL FURRING S.SK. - SLOP SINK or SERVICE SINK
BLK. - BLOCK F.S. - FLOOR SINK
M.F.L.P. - METAL FURRING LATH & PLASTER S.S. - STAINLESS STEEL
BM. - BEAM F.S.P. - FIRE STANDPIPE M.H. - MANHOLE
STD. - STANDARD A GRID LINE
STL. - STEEL
B.O. - BOTTOM OF FT'G. - FOOTING MIN. - MINIMUM ST.PL. - STEEL PLATE
B.O.C./B.C. - BOTTOM OF CURB M.O. - MASONRY OPENING STOR. - STORAGE DOOR IDENTIFICATION
GA. - GAUGE MOV. - MOVABLE STRUCT./STRL. - STRUCTURAL TY-000
CTR. JT. - CONTROL JOINT HORIZ. - HORIZONTAL V.C.T. - VINYL COMPOSITION TILE
CU.M. - CUBIC METER H.P. - HIGH POINT Q.T. VCT - VOLENTERY COUNSLING & TESTING
- QUARRY TILE
H.R. - HAND RAIL QTY. - QUANTITY VENT. - VENTILATOR
DBL. - DOUBLE HR. - HOUR VERM. - VERMICULITE
DEP. - DEPRESSED VERT. - VERTICAL 88
VEST. - VESTIBULE
DEP'T. - DEPARTMENT I.D. - INSIDE DIAMETER
V.I.F. - VERIFY IN FIELD A8.88
DET. - DETAIL INCL. - INCLUDING W/ WITH DETAIL SECTION
-
D.F. - DRINKING FOUNTAIN INV. - INVERT WAINS. - WAINSCOT
D.H. - DOUBLE HUNG W.R. - WATER RESISTANT
INSUL. - INSULATION
DIA. - DIAMETER W.C. - WATER CLOSET
INT. - INTERIOR
WD. - WOOD
DIM. - DIMENSION
INCI. - INCINERATOR W.F. - WIRE FENCE (OR) WIDE FLANGE 88
DISP. - DISPENSER
W.F.T. - WHITEHALL FERRY TERMINAL
DN. - DOWN A8.88
W.H. - WEEP HOLE
DO. - DITTO
W.I. - WROUGHT IRON
PROJECT NAME;
DR. - DOOR W.M. - WIRE MESH
DWG. - DRAWING Gelan Coffee Processing
W.M.G. - WIRE MESH GUARD
W.P. - WATERPROOFING PLAN/ ELEVATION DETAIL
WT. - WEIGHT CLIENT NAME;
W.W.F - WELDED WIRE FABRIC Owner
SLOPING SURFACES
ARCHITECTURAL MATERIAL LEGEND: PROJECT NO.;
Project Number
CONCRETE BLOCK WALL NEW METAL STUD WALL SCALE; DRAWN BY;
1:8 Author
ALUMINUM
DATE; CHECKED BY;
06/19/20 KIDUS T.
CONTINUOUS MEMBER
BLOCKING
1 Abrevation and Key Notes BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
A102
1:8 +251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
A B C D
2 2
2
Bed Room
20 m² A120
Polrcelain f.f.
4
1' 1'
3 A126 5
2
Dressing Board Room
7 m² 40 m²
Polrcelain f.f. Polrcelain f.f.
CEO
110 m²
Polrcelain f.f.
Vestibule Corridor
6 m² 36 m²
Polrcelain f.f. Polrcelain f.f.
Bath Room
6 m²
2 Polrcelain f.f.
A123
1 1
LEGEND;
1
Callout 1
A110
1 : 50
2 2
PROJECT NAME;
Gelan Coffee Processing
2
A120
Lounge & Plat Room CLIENT NAME;
61 m²
Polrcelain f.f. Owner
PROJECT NO.;
Project Number
1' Advisors Office Advisors Office Advisors Office 1'
41 m² 41 m² 41 m²
Polrcelain f.f. Polrcelain f.f. Polrcelain f.f.
DRAWING TITLE;
DRG. NO.;
A110
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
- - -
- - -
D d' E e' 2 F f' BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
A112
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
15362
A123
11
10
12
13
14
15
16
17
18
3
1
9
500 350 600 349 501 350 600 1200 600 2100 600 6476
1'
900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900
5
A
A
172
446
180
800
800
800
a'
a'
1300
B
B
800
800
800
b'
b'
175
C
C
UP
211
455
3
A126
4061
800
800
800
c'
c'
2
4
713
5
D
D
800
800
800
d'
d'
E
E
800
800
800
ALDW
e'
e'
1
A139
2900
7160
8062
F
F
1
15
16
17
18
800
800
800
f'
f'
G
G
5
A127
LEGEND;
4
2
800
800
800
g'
g'
3
H
H
728
800
800
800
h'
h'
A104
211
1
I
I
161
Ground Floor
1 : 200
800
800
800
i'
i'
PROJECT NAME;
1300
J
CLIENT NAME;
800
800
828
Owner
j'
j'
446
PROJECT NO.;
190
Project Number
K
K
5
500 400 500 399 501 400 500 5800 500 400 500 231
12
13
14
1'
1
900 900 900 900 900 900 900 900 900 900 900 900 900 DRAWING TITLE;
11762
Ground Floor
11
10
DRG. NO.;
A104
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
- - -
- - -
BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
A123
2
15362
10
11
12
13
14
15
16
17
18
3
1
9
1'
900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900
5
A
A
172
446
800
800
800
a'
a'
1300
B
B
800
800
800
b'
b'
C
C
DN
3
A126
4061
800
800
800
c'
c'
2
4
5
D
D
800
800
800
d'
d'
Ping Pong
Tabel
Plat Area
E
E
ALDW
2 800
800
800
e'
e'
A139
2900
7160
8062
F
F
4
15
16
17
18
800
800
800
f'
f'
G
G
5
LEGEND;
A127
4
2
800
800
800
g'
g'
3
H
A105
1
800
800
800
h'
h'
Mezzanine Floor
1 : 200
I
I
800
800
800
i'
i'
PROJECT NAME;
Gelan Coffee Processing
1300
J
J
CLIENT NAME;
Owner
800
800
828
j'
j'
446
PROJECT NO.;
Project Number
189
K
K
5
12
13
14
1'
1
900 900 900 900 900 900 900 900 900 900 900 900 900
DRG. NO.;
11
10
A105
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
- - -
- - -
BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
1
A127
1
A a' B b' C c' A126 D d' E ALDW e' F f' G g' H h' I i' J j' K
800 800 800 800 1 800 800 800 800 800 828
1 1
5
2
755
4 123 m² 29 m²
320
3
Admin & General Services
156
59 m²
Lobby
48 m²
Epoxy f.f.
1 2 Admin & General Services
1 Staff Canteen
Epoxy f.f.
900
948
1' Epoxy f.f. 92 m² 59 m²
UP Epoxy f.f. A107 A107 A108
3 A126 5 Cupping Lab Manager Epoxy f.f. Epoxy f.f.
Manager Office 15 m²
15 m² Epoxy f.f.
Lobby
Cashier
376
15 771 3 Epoxy f.f. 2805 3 1597 3 8 m² 1595 8 822
21 m²
Rest Room 2 Epoxy f.f.
Epoxy f.f. Rest Room
32 m² 32 m²
180
3
Janitor Vestibule Vestibule Janitor
3 m² 5 m² Corridor 5 m² 3 m²
2 126 m²
180
Epoxy f.f. Epoxy f.f. Epoxy f.f. Epoxy f.f.
A123 Epoxy f.f.
7
172 1300 175 211 713 2900 728 211 161 1300 189
A a' B b' C c' D d' E e' F f' G g' H h' I i' J j' K
A106
1 : 100
Staff
Canteen
Manager
Store
LEGEND;
Janitor
PROJECT NAME;
CLIENT NAME;
Owner
Cupping Lab
Manager
PROJECT NO.;
Project Number
DRAWING TITLE;
DRG. NO.;
A106
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
- - -
- - -
2 Ground Floor
A106
BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
A
a' B b' C c' D
2 2
Manager Office
15 m²
Epoxy f.f.
2
A120
Manager Office
15 m² 2
Epoxy f.f.
7 81 127 76 47 81 14
Rest Room
32 m²
Epoxy f.f.
Janitor Vestibule
3 m² 5 m²
2 Epoxy f.f. Epoxy f.f.
A123
1 1
A
a' B b' C c' D
LEGEND;
2 2
PROJECT NAME;
Gelan Coffee Processing
Store
15 m²
Epoxy f.f.
CLIENT NAME;
Owner
2
A120
PROJECT NO.;
Project Number
Cupping Lab
123 m²
Epoxy f.f.
DRAWING TITLE;
A107
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
- - -
- - -
1 1
2 2
2
Admin & General Services
21 m²
5 A127 3 Epoxy f.f.
2
4 A120
Lobby
Cashier 8 m²
21 m² Epoxy f.f.
Epoxy f.f.
2
A123
1 1
h'
f' G g' H I
LEGEND;
I i' J j' K
2 2
PROJECT NAME;
Gelan Coffee Processing
2 CLIENT NAME;
A120 Owner
Kitchen
29 m² PROJECT NO.;
Epoxy f.f.
Project Number
Staff Canteen
1' 59 m² 1'
Epoxy f.f. DRAWING TITLE;
A108
1 : 50 BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
1
d' e' f' g' h' i' j'
A B A110 C D E 2 F G 1 H I 2 J K
A116 A111 A111
800
a' 800
b' 800
c' 800 800 800 800 800 800 828
3
3
2 A139 2
Archive 2 Archive
16 m² 15 m²
Polrcelain f.f. Polrcelain f.f.
Bed Room Plug & Plat Office
20 m²
Polrcelain f.f. 5 A127 3 72 m²
Polrcelain f.f.
Lounge & Plat Room
61 m²
4
Polrcelain f.f. 4
1' DN 41 m² 41 m² 41 m² 60 m² 1'
3 A126 5 Polrcelain f.f. Polrcelain f.f. Polrcelain f.f. Polrcelain f.f.
Board Room
40 m² Manager Manager
Dressing CEO 15 m² 15 m²
Polrcelain f.f.
7 m² 110 m² 2 Polrcelain f.f. Polrcelain f.f. Rest Room
Polrcelain f.f. Polrcelain f.f. 32 m²
Vestibule Polrcelain f.f.
6 m²
Polrcelain f.f. Corridor
36 m² Corridor
3
Polrcelain f.f. 86 m²
Bath Room Vestibule Janitor
6 m² Polrcelain f.f. 4 m² 4 m²
2 Polrcelain f.f. Polrcelain f.f. Polrcelain f.f.
180
A123
1 1
8062 h'
Janitor
Advisors
LEGEND;
Finance Pool
Manager
Board
Room
PROJECT NAME;
Gelan Coffee Processing
CEO
CLIENT NAME;
Owner
PROJECT NO.;
Project Number
DRAWING TITLE;
A109
REV. DATE REV. # REV. DESCRIPTION
Lounge & - - -
Plat Room -
-
-
-
-
-
- - -
2 Mezzanine Floor
A109
Dressing Room BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
Bath Room KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
f' G g' H h' I
2 2
Archive
16 m²
Polrcelain f.f.
2
Manager
15 m²
Polrcelain f.f.
Corridor
86 m²
Polrcelain f.f.
2
A123
1 1
h'
f' G g' H I
LEGEND;
A111
1 : 50
2 2
Archive
15 m²
Polrcelain f.f. PROJECT NAME;
Gelan Coffee Processing
2 CLIENT NAME;
A120 Owner
PROJECT NO.;
Project Number
Rest Room
A111
32 m²
Polrcelain f.f.
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
- - -
- - -
Corridor
86 m²
Polrcelain f.f. SCALE; DRAWN BY;
Vestibule Janitor
4 m² 4 m²
1 : 50 Author
Polrcelain f.f. Polrcelain f.f.
2
DATE; CHECKED BY;
A123
06/19/20 KIDUS T.
1 1
1 1
5
2
755
4 123 m² 29 m²
320
3
Admin & General Services
156
59 m²
Lobby
48 m²
Epoxy f.f.
1 2 Admin & General Services
1 Staff Canteen
Epoxy f.f.
900
948
Epoxy f.f. 92 m² 59 m²
1' UP Epoxy f.f. A113 A113 A114
3 A126 5 Cupping Lab Manager Epoxy f.f. Epoxy f.f.
Manager Office 15 m²
15 m² Epoxy f.f. Cashier
376
15 771 3 Epoxy f.f. 2805 3 1597 3 21 m² 1595 8 822
Rest Room 2 Epoxy f.f.
32 m²
180
Epoxy f.f.
3
Janitor Vestibule
3 m² 5 m²
2
180
Epoxy f.f. Epoxy f.f.
A123
1
7
172 1300 175 211 713 2900 728 211 161 1300 189
A a' B b' C c' D d' E e' F f' G g' H h' I i' J j' K
1
A112
1 : 100
1 1' 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
6
A140
-12.14 -12.14
1105 1105
+7.64
764
Mezzanine Mezzanine
Floor Floor
382 382
LEGEND;
Ground
Floor Ground
0 Floor
-0.50 0
-50 -0.50
-50
-0.80
-0.80
-80
-80 -2.50 -2.50
-250 -250
Basement
-3.93 Floor -3.93
-393 -400 -393
-6.09 -6.09
-609 -609
Semi - Semi -
Basement Basement
Floor Floor
-926 -926
-6.40 -6.40
-1201 -1201
PROJECT NAME;
Gelan Coffee Processing
2 Section 1
CLIENT NAME;
A112
1 : 200 Owner
PROJECT NO.;
Project Number
DRAWING TITLE;
DRG. NO.;
A112
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
- - -
- - -
BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
A B C D
2 2
2
A120
4
1' 1'
3 A126 5
2
A123
1 1
2 2
PROJECT NAME;
Gelan Coffee Processing
2
A120
CLIENT NAME;
Owner
PROJECT NO.;
1' 1'
Project Number
DRAWING TITLE;
DRG. NO.;
A113
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
- - -
- - -
2
SCALE; DRAWN BY;
A123
1 : 50 Author
2 2
5 A127 3
2
4 A120
1' 1'
2
A123
1 1
h'
f' G g' H I
2 2
PROJECT NAME;
2
A120
Gelan Coffee Processing
CLIENT NAME;
Owner
DRAWING TITLE;
DRG. NO.;
A114
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
- - -
2 - - -
A123
SCALE; DRAWN BY;
1 : 50 Author
1 1
800
a' 800
b' 800
c' 800 800 800 800 800 800 828
2 2
5 A127 3
4 4
1 2 1
900
952
3
2
180
A123
1 1
8062 h'
2 K
A112
K j' J i' I h' H g' G f' F e' E d' D c' C b' B a' A
LEGEND;
-12.14 -12.14
1105 1105
+7.64
764
Mezzanine Mezzanine
Floor Floor
382 382
382
Ground Ground
Floor Floor
0 0
-0.50
-0.50
-0.80
-50
-50
-80 PROJECT NAME;
-0.80
-80
Gelan Coffee Processing
-2.50 -2.50
-250 -250
-3.93 -3.93
-393 -393 CLIENT NAME;
Owner
-6.09 -6.09
-609 -609
PROJECT NO.;
Project Number
DRAWING TITLE;
DRG. NO.;
A115
2 Section 2
REV. DATE REV. # REV. DESCRIPTION
A115
1 : 150 -
-
-
-
-
-
- - -
- - -
BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
A a' B b' C c' D
2 2
2
A120
4
1' 1'
3 A126 5
2
A123
1 1
2 2
2 PROJECT NAME;
A120 Gelan Coffee Processing
CLIENT NAME;
Owner
1' 1'
PROJECT NO.;
Project Number
DRAWING TITLE;
DRG. NO.;
A116
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
- - -
2 - - -
A123
SCALE; DRAWN BY;
1 1 1 : 50 Author
BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
f' G g' H h' I
2 2
5 A127 3
2
4 A120
1' 1'
2
A123
1 1
h'
f' G g' H I
2 2
PROJECT NAME;
Gelan Coffee Processing
2
A120
CLIENT NAME;
Owner
PROJECT NO.;
1' 1' Project Number
DRAWING TITLE;
DRG. NO.;
A117
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
- - -
- - -
2
SCALE; DRAWN BY;
A123
1 : 50 Author
10
11
12
13
14
15
16
17
18
3
1
9
1'
A
A
a'
a'
B
B
b'
b'
C
C
3
A126
c'
c'
2
4
5
D
D
d'
d'
E
E
e'
e'
A139
F
F
1
4
15
16
17
18
f'
f'
LEGEND;
G
G
5
A118
A127
1
4
2
g'
g'
3
Ground Floor
1 : 200
H
H
h'
h'
I
I
PROJECT NAME;
i'
i'
CLIENT NAME;
J
J
Owner
PROJECT NO.;
Project Number
j'
j'
DRAWING TITLE;
K
K
Ground Floor (Reflected Ceiling Plan)
12
13
14
1'
1
DRG. NO.;
A118
REV. DATE REV. # REV. DESCRIPTION
11
10
- - -
- - -
- - -
- - -
BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
A123
2
11
10
12
13
14
15
16
17
18
3
1
9
1'
A
A
a'
a'
B
B
b'
b'
C
C
c'
c'
D
D
d'
d'
E
E
e'
e'
A139
F
F
4
277
15
16
17
18
f'
f'
G
G
LEGEND;
g'
g'
H
A119
h'
h'
1
55
Mezzanine Floor
1 : 200
I
I
57
i'
i'
PROJECT NAME;
Gelan Coffee Processing
J
J
CLIENT NAME;
Owner
j'
j'
PROJECT NO.;
Project Number
K
K
11
10
12
13
14
1'
1
DRAWING TITLE;
DRG. NO.;
A119
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
- - -
- - -
BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
A B C 1 D d' E e' F f' G g' H h' I i' J j' K
A121 2 1
A121 A122
2
a' b' c' A122
5 A127 3
4 4
1'
3 A126 5
2
A123
1
h'
2
A112
K j' J i' I h' H g' G f' F e' E d' D c' C b' B a' A
LEGEND;
PROJECT NAME;
Gelan Coffee Processing
CLIENT NAME;
Owner
PROJECT NO.;
Project Number
DRAWING TITLE;
DRG. NO.;
A120
2 Section 3 REV. DATE REV. # REV. DESCRIPTION
- - -
A120
1 : 125 - - -
- - -
- - -
BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
A a' B b' C c' D
2 2
2
A120
4
1' 1'
3 A126 5
2
A123
1 1
LEGEND;
2 2
2
PROJECT NAME;
A120
Gelan Coffee Processing
CLIENT NAME;
Owner
1' 1'
PROJECT NO.;
Project Number
DRAWING TITLE;
DRG. NO.;
A121
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
2 - - -
A123 - - -
2 2
5 A127 3
2
4 A120
1' 1'
2
A123
1 1
h'
f' G g' H I
2 2
2 PROJECT NAME;
A120
Gelan Coffee Processing
CLIENT NAME;
Owner
1' 1'
PROJECT NO.;
Project Number
DRAWING TITLE;
DRG. NO.;
A122
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
2 - - -
- - -
A123
5 A127 3
4 4
1' 1'
3 A126 5
2
A123
1
h'
2 K
A112
LEGEND;
A a' B b' C c' D d' E e' F f' G g' H h' I i' J j' K
-12.14 -12.14
1105 1105
Mezzanine Mezzanine
Floor Floor
382 382
PROJECT NAME;
Ground Ground
0
Floor
-0.50
-0.80
Floor
0
-0.50
-0.80
Gelan Coffee Processing
-50 -50
-80 -80
-2.50
-250
-2.50
-250
CLIENT NAME;
Owner
-3.93 -3.93
-393 -393
PROJECT NO.;
-6.09 -6.09
Project Number
-609 -609
DRAWING TITLE;
Semi - Semi -
Basement Basement
DRG. NO.;
A123
REV. DATE REV. # REV. DESCRIPTION
2 Section 4 -
-
-
-
-
-
- - -
A123
1 : 150 - - -
BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
A B C D
2 2
2
A120
4
1' 1'
3 A126 5
2
A123
1 1
2 2
2
A120
PROJECT NAME;
Gelan Coffee Processing
PROJECT NO.;
Project Number
DRAWING TITLE;
DRG. NO.;
A124
2
REV. DATE REV. # REV. DESCRIPTION
A123 - - -
- - -
- - -
1 1
- - -
2 2
5 A127 3
2
4 A120
1' 1'
2
A123
1 1
h'
f' G g' H I
I i' J j' K
2 2
2
A120
PROJECT NAME;
Gelan Coffee Processing
CLIENT NAME;
1' 1'
Owner
PROJECT NO.;
Project Number
DRAWING TITLE;
DRG. NO.;
A125
2
REV. DATE REV. # REV. DESCRIPTION
- - -
A123 - - -
- - -
1 1 - - -
I i' J j' K
2 2
2
A120
Lobby
2 (Reception) Elevation 1 - a 3 (Reception) Elevation 1 - b
48 m²
Epoxy f.f.
A126
1 : 50 A126
1 : 50
4
1' 1'
3 A126 5
2
A123
1 1
5 (Reception) Elevation 1 - d
4 (Reception) Elevation 1 - c A126
1 : 50
A126
1 : 50
C c'
PROJECT NAME;
Gelan Coffee Processing
CLIENT NAME;
Owner
PROJECT NO.;
Project Number
DRAWING TITLE;
Reception
DRG. NO.;
A126
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
- - -
- - -
BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
f' G g' H h'
2 2
5 A127 3
2
4 A120
1' 1'
1
Services) - Callout 5
A127
1 : 50
LEGEND;
PROJECT NAME;
(Admin & General Services) Elevation 1 - (Admin & General Services) Elevation 1 - Gelan Coffee Processing
2
a 3
b
A127
1 : 50 A127
1 : 50 CLIENT NAME;
Owner
PROJECT NO.;
Project Number
DRAWING TITLE;
DRG. NO.;
A127
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
- - -
- - -
(Admin & General Services) Elevation 1 - (Admin & General Services) Elevation 1 -
4
c 5
d
A127
1 : 50 A127
1 : 50
BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
LEGEND;
PROJECT NAME;
Gelan Coffee Processing
CLIENT NAME;
Owner
PROJECT NO.;
Project Number
DRAWING TITLE;
ALDW Schedule
DRG. NO.;
A137a
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
- - -
- - -
BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
5
A139
103 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 103
108 112 112 112 112 112 112 112 112 112 112 224 112 112 112 112 112 112 224 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 112 108
310
1 ALDW 1
A139
1 : 100
7
103 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 107 103
A139
103
103
103
6
A139
103
103
103
4 ALDW 2
LEGEND;
A139
1 : 100
7 Aldw 2 - Callout 6
A139
1 : 25
PROJECT NAME;
Gelan Coffee Processing
CLIENT NAME;
Owner
5 107 5 107 5 107 5 107 5 107 5 107 5 107 5 107 5 107 5 103
PROJECT NO.;
1 6 1
Project Number
9
107
DRAWING TITLE;
ALDW Details
103
DRG. NO.;
6 ALDW 2 - Callout 6
A139
1 : 25 BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA
2
A120 2
397
8
302
10 mm glass 10 mm glass
AGVP-15
Moulding
AVUF
moulding PVG AVUF
LEGEND;
10mm glass 10mm glass
72
AGVPT-15
AGVPA-15
PROJECT NAME;
Gelan Coffee Processing
AGVPA-15
DRAWING TITLE;
DRG. NO.;
10 mm glass A140
PVG 10 mm glas
REV. DATE REV. # REV. DESCRIPTION
- - -
- - -
Moulding
5 5 Joint -
-
-
-
-
-
A140
1:1 SCALE; DRAWN BY;
As indicated Author
26
DATE; CHECKED BY;
06/14/20 KIDUS T.
4 4 Wall Connection
A140
1:1 Section 1 - Callout 1
6
A140
1 : 35
BOLE MEDHANIALEM, GULF AZIZ BLDG. 3RD FLOOR OFFICE NO. 305,
KITHOMEINTERIOR@GMAIL.COM,
+251929907349,+251911473642
ADDIS ABABA, ETHIOPIA