Progress Payment Form
Progress Payment Form
Progress Payment Form
Project : Molten Sulphur Tank Project PCS Rev. / Date : Rev.00 / DDMMYY
Location : Purwakarta, Jawa Barat, Indonesia Progress Month : MMYY
Owner : PT. South Pacific Viscose Currency : Rupiah
TOTAL (2) = - - -
TOTAL (3) = - - -
4. RETENTION (5%)
5.1 Original Scope/Items [ Total (1) - (3.1) - (4.1) ] 778,979,337 500,772,431 278,206,906
5 4 0 0 STORAGE TANK
5 4 1 0 Atmospheric Tank LS 1.00 4,685,590,000 4,685,590,000 17.50% 11.25% 6.25% 819,978,250 527,128,875 292,849,375
CONTRACT PROGRESS BQ
BQ WEIGHT THIS REMARK
FWBS CUMULATIVE THIS MONTH CUMULATIVE LAST MONTH
DESCRIPTION MONTH
CODE % Percentage Weight (%) Percentage Weight (%) Percentage Weight (%)
[A] [B] [C] = [A*B] [D] [E] = [A*D] [F] = [C-D] [G] = [A*F] [H]
5 4 0 0 STORAGE TANK
5 4 1 0 Atmospheric Tank
5 4 1 0 A Inner Tank Shell - SS
5 4 1 0 A a Bottom/Annular Plate 10.00% DETAIL
100% KALKULASI
10.00% MENGGUNAKAN
75% 7.50% 25% 2.50% Example
5 4 1 0 A b Shell Course #1 5.00% 75% 3.75% 50% 2.50% 25% 1.25% Example
5 4 1 0 A c Shell Course #2 5.00%
PERHITUNGAN
50%
DARI
2.50%
HYDRORAYA
25% 1.25% 25% 1.25% Example
5 4 1 0 A d Shell Course #3 5.00% 25% 1.25% 0% 0.00% 25% 1.25%
5 4 1 0 A e Shell Course #4 0%
5 4 1 0 A f Shell Course #5 0%
5 4 1 0 A g Shell Course #6 0%
5 4 1 0 A h Shell Course #7 0%
5 4 1 0 A i Shell Course #8 0%
5 4 1 0 A j Heating Coil 0%
5 4 1 0 A k Top Angle 0%
5 4 1 0 A l Rafter 0%
5 4 1 0 A m Roof 0%
5 4 1 0 D Nozzle
5 4 1 0 E Manhole
5 4 1 0 F Insulation
5 4 1 0 F a Shell Insulation
5 4 1 0 F a Roof Insulation
5 4 1 0 G Painting
5 4 1 0 G a Cleaning and Pickling of Inner Tank
5 4 1 0 G b Painting of Inner Tank
5 4 1 0 G c Painting of Outer Tank
5 4 1 0 H Hydrotesting
[A] [B] [C] [D] [E] [F]=[D - E] [G]=[C x D] [H]=[C x E] [I]=[G - H] [J]=[G/B]
CHANGE ORDER
TOTAL - - - - #DIV/0!
PROGRESS BQ
CONTRACT
FWBS BQ CUMULATIVE THIS CUMULATIVE LAST THIS
DESCRIPTION BQ UNIT REMARK
CODE MONTH MONTH MONTH