05 Transmission
05 Transmission
05 Transmission
FOR
CONSTRUCTION OF
For
Prepared Checked & Recommended as per the contract Checked & Recommended as per the contract Checked & Certified as per the contract
…………………………..,……….. …………….……………………………………………… ………………………………………………………….. ………………...…………………………………………
Contractor Consultant QS/ Engineer Assistant QS (SPCU) Senior Engineer
Pura Neguma - Local Government Enhancement Sector Project
Excess Quantity BOQ Summary
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
EXCESS
ITEM DESCRIPTION AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
UNIT RATE QTY AMOUNT QTY AMOUNT QTY AMOUNT
CLASS E - EARTHWORKS
Rate shall include for compacting dewatering,
upholding sides of excavation where necessary
2.1 Depth not exceeding 1.0 m m3 1,066.00 0.76 810.16 0.76 810.16
Bituminous Painting
Apply two coats of Bituminous Paint on the four sides of
27 the base , Upper surface of base and for sides of column m2 2,100.00 6.89 14,469.00 6.89 14,469.00
up to floor level.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
Excess Quantity BOQ Summary
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
EXCESS
ITEM DESCRIPTION AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
UNIT RATE QTY AMOUNT QTY AMOUNT QTY AMOUNT
CLASS E - EARTHWORKS
Rate to include for removing surplus excavated earth and
deposited at the direction of Engineer with in the site
boundaries at suitable places not disturbing to surface
1.1 Depth not exceeding
drainage and cost of1.0 m
dewatering, Planking & Strutting, if m3 1,065.00 15.38 16,379.70 15.38 16,379.70
1.2 necessary.
Depth exceeding 1.0 m but not exceeding 2.0 m m3 1,145.00 17.38 19,900.10 17.38 19,900.10
CONCRETE WORK
Concrete in Grade 15
2.5 In 50 mm thick blinding concrete for foundations m2 737.00 0.56 412.72 0.56 412.72
Concrete in Grade 20
2.8 In 75 mm thick mass concrete base for 1,000 liters tank in
ground floor m2 1,385.00 0.97 1,343.45 0.97 1,343.45
- - - -
Reinforced Concrete in Grade 20 (Formwork measured
separately) - - - -
2.9 In 225x150 mm Plinth Beam m3 18,991.00 0.53 10,065.23 0.53 10,065.23
2.11 In Lintols m3 18,991.00 1.61 30,575.51 1.61 30,575.51
- - - -
FORMWORK - - - -
Rate to include for Splayed Edges, Battens, Strutting,
Bolting, Wedging, Easing, Striking and Removal . -
- - -
2.13 In Columns m2 1,295.00 0.47 608.65 0.47 608.65
2.14 In Lintols m2 1,295.00 13.89 17,987.55 13.89 17,987.55
TOTAL CARRIED FORWARD 76,272.27 36,279.80 112,552.07
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
Pura Neguma - Local Government Enhancement Sector Project
Excess Quantity BOQ Summary
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
EXCESS
ITEM DESCRIPTION AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
UNIT RATE QTY AMOUNT QTY AMOUNT QTY AMOUNT
REINFORCEMENTS
Rate to include for supply and delivery to the yard, storing,
cutting and bending, transport to the site, cleaning as
specified and to the approval of the Engineer, placing in
position and tied with GI binding wire, complete as
depicted in drawing
MASONARY WORKS
2.18 Random Rubble Masonry in 1:5 cement sand mortar in m3 13,182.00 0.97 12,786.54 0.97 12,786.54
foundation
SURFACE FINISHES
Concrete Grade 25
Reinforced Concrete
3.5 In 200 mm thick Base & walls of pond m3 17,416.00 0.30 5,224.80 0.30 5,224.80
Miscellaneous
Cement, Sand 1:3 plastering finished semi rough of
3.12 concrete work m3 705.00 2.62 1,847.10 2.62 1,847.10
TOTAL CARRIED FORWARD 128,014.38 36,279.80 164,294.18
Pura Neguma - Local Government Enhancement Sector Project
Excess Quantity BOQ Summary
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
EXCESS
ITEM DESCRIPTION AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
UNIT RATE QTY AMOUNT QTY AMOUNT QTY AMOUNT
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Earth Works
2.3 Depth exceeding 2.0 m but not exceeding 3.0 m m3 1,145.00 4.60 5,267.00 4.60 5,267.00
-
Supply & fixing of SWG 18 No. 04 GI wire mesh, Supplied,
cut to length, bent to shape, laid in position in vertical
Ferro cement tank walls and at places where it is
11 connecting the base slab and walls (Rate to include for lap m2 788.00 28.80 22,690.46 28.80 22,690.46
TOTAL CARRIED FORWARD
length) 184,576.23 109,866.45 294,442.68
Pura Neguma - Local Government Enhancement Sector Project
Excess Quantity BOQ Summary
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
EXCESS
ITEM DESCRIPTION AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
UNIT RATE QTY AMOUNT QTY AMOUNT QTY AMOUNT
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
2.4 Depth exceeding 3.0 m but not exceeding 4.0 m m3 1,260.00 14.12 17,791.20 14.12 17,791.20
Earth Filling
5 Back filling around the structure with selected excavated
material (other than top soil or rock) to 95% compaction
as directed by the Engineer (Compaction reports should be
provided)
m3 830.00 53.15 44,114.50 53.15 44,114.50
- - - -
In Upstanding Projections on cover slab & manhole
openings with thickness not exceeding 100 mm (Kerb
13 Wall) m3 23,993.00 0.69 16,555.17 0.69 16,555.17
Formwork
26 For sides of slab projections for manhole opening m2 1,295.00 16.38 21,212.10 16.38 21,212.10
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
EXCESS
ITEM DESCRIPTION AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
UNIT RATE QTY AMOUNT QTY AMOUNT QTY AMOUNT
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
EXCESS
ITEM DESCRIPTION AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
UNIT RATE QTY AMOUNT QTY AMOUNT QTY AMOUNT
- - - -
Tor steel bar reinforcement cut to length, bent to - - - -
17 shape,
12 mm placed
dia. in position and tied with GI wire kg 169.00 196.40 33,191.60 196.40 33,191.60
18 16 mm dia. kg 169.00 248.66 42,023.54 248.66 42,023.54
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Brick Work
19 225 mm thick vertical straight, common brick walls in 1:6
cement and sand mortar m2 3,922.00 37.65 147,663.30 37.65 147,663.30
- - - -
Rubble work - - - -
21 450 mm thick vertical straight, rubble masonry walls of
foundation, in cement and sand 1:5 mortar m2 5,932.00 19.57 116,089.24 19.57 116,089.24
- - - -
Wall Finishes - - - -
34 16 mm thick internal wall plastering in 1:1:5 cement, lime
and sand mortar finished smooth with lime putty on brick
walls and concrete columns. Rate to include for door and
window reveals
m2 752.00 55.48 41,720.96 55.48 41,720.96
35 20 mm thick external wall plastering in 1:1:5 cement, lime
and sand mortar finished semi-rough on brick walls and
concrete columns. Rate to include for door and window
reveals
m2 731.00 48.00 35,088.00 48.00 35,088.00
Pura Neguma - Local Government Enhancement Sector Project
Excess Quantity BOQ Summary
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
EXCESS
ITEM DESCRIPTION AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
UNIT RATE QTY AMOUNT QTY AMOUNT QTY AMOUNT
- -
-
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
EXCESS
ITEM DESCRIPTION AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
UNIT RATE QTY AMOUNT QTY AMOUNT QTY AMOUNT
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Excavation in Rock
Extra-over for above item no. 2 for excavation of soft rock,
3 (Provisional Quantity)(No blasting required) m3 4,725.00 101.67 480,390.75 101.67 480,390.75
Extra-over for above items no. 2 & 3 for excavation in hard
4 rock (Provisional Quantity)(Controlled blasting) m3 13,125.00 14.69 192,806.25 14.69 192,806.25
- - - -
Earth Filling - - - -
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
EXCESS
ITEM DESCRIPTION AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
UNIT RATE QTY AMOUNT QTY AMOUNT QTY AMOUNT
- - -
TOTAL CARRIED FORWARD 2,107,148.98 109,866.45 2,217,015.43
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Form work - - -
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
EXCESS
ITEM DESCRIPTION AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
UNIT RATE QTY AMOUNT QTY AMOUNT QTY AMOUNT
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Advance Recovery = Current Work Done(Excluding PS & Contingencies) x Advance Payment Received
90% of BOQ
= Err:509 x 53,545,263.29
90% 300,716,571.32
= Err:509
270,644,914.19
= Err:509
……………………………….. ……………………………………………..
Assistant QS(SPCU) Senior Engineer/Compliance Officer SPCU
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 01 : PRELIMINARIES
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Specified Requirements:
Provide original (01 set) "As Built Drawings" in
A1 papers and 03 sets of copies in A3 size paper
2 including 4 sets of electronic files (editable) in Item Lump Sum 20,000.00
CDs as specified in General Requirements
Engineer's Facilities - - - -
Provision for establishment, maintenance and
3 removal at completion of Engineers office as Months 15 53,793.33 806,900.00 15th Months 806,900.00 - - 806,900.00
specified in the Specifications 6.2a Para 8.
Provide for the sole use of the Engineer and his
4 staff, safety shoes, protective clothing, helmet Item Lump Sum 30,000.00 15th Months 25,846.20 15th Months 25,846.20
and equipment, etc.
Supply and erection
Temporary Works :of Project Name Boards (Size
not less than 2.4 m x 3.0 m) to be displayed at
sites and offices as directed by the Engineer.
5 Script shall be approved by the Engineer. Rate to nr 2 25,000.00 50,000.00 2.00 50,000.00 2.00 50,000.00
include for fixing of 2 posts (GI Pipes) at a height
of 2 m above ground level and both posts
TOTAL CARRIED
supported FORWARD
with concrete foundations. 1,906,900.00 1,652,444.40 50,000.00 1,702,444.40
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
Description Unit Nos Qty up to Qty for This
No Length Breath Depth Previous Bill Quantity
Bill
Contractual Requirements
Engineer's Facilities
Prepared Checked as per the Contract Checked & Recommanded as per Checked & Certified as per the Contract
the Contract
Pura Neguma - Local Government Enhancement Sector Project
PRELIMINARIES
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
Description Unit Nos Qty up to Qty for This
No Length Breath Depth Previous Bill Quantity
Bill
Prepared Checked & Certified as per the Contract Checked & Certified as
Checked & Certified as per the Contract
per the Contract
Pura Neguma - Local Government Enhancement Sector Project
PRELIMINARIES
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
Description Unit Nos Qty up to Qty for This
No Length Breath Depth Previous Bill Quantity
Bill
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Penstocks
Supplying & Installation of 300 mm dia. Penstock to
existing Brick wall. Rate to include for the cost of
1 preparing the wall for fixing the Penstock housing. nr 4 5,250.00 21,000.00 - -
According to the Section 06-Employer’s
Requirements -Specifications 6.2s
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
External Plaster - - -
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
External Painting -
Internal Painting -
Prepare the surfaces and apply one coat of wall
9 primer and two coats of emulsion paint in Pump m2 40.00 542.00 21,680.00 31.06 16,834.52 - 31.06 16,834.52
House Internal wall surfaces & soffit of roof slab.
TOTAL CARRIED FORWARD 379,895.00 66,262.30 - 66,262.30
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 02 : RENOVATION WORK OF INTAKE
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
2 Headstock
Supply Cost 198,200.00
According to CIF Value 172,880.00
NWSDB Circular
Custom Duty 12,966.00
Add 13.80% 185,846.00 25,646.75
New Supply Cost 223,846.75
Add CIF Value 172,880.00
20% 172,880.00 34,576.00
Total Supply Cost including O & P 258,422.75
Laying 5,100.00
Other cost (Masonry works) 5,000.00
10,100.00
Add Overhead & Profits 10,100.00
27% 10,100.00 2,727.00
Total Laying Cost including O & P 12,827.00
Rate Per 1nr 271,250.00
12 Chequered Plate
Plate 118,000.00
Hand Rail 21,000.00
for frame work 5,000.00
144,000.00
Add Overhead & Profits
27% 38,880.00
Total Cost 182,880.00
Rate Per m2 182,880.00
Pura Neguma - Local Government Enhancement Sector Project
RENOVATION WORK OF INTAKE
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Work Done Work Done
Item Description Unit Nos Qty up to Qty for This Total
No Quantity
Length Breath Depth Previous Bill Bill
Internal Plaster
16 mm thick plastering to wall in cement and
3 sand mortar 1:5 finished smooth with Wall m2
Putty.
Window Reveals m2 1.00 4.70 0.10 0.47
0.47 - 0.47
6.80 - 6.80
External Painting
34.69 - 34.69
Prepared Checked as per the Contract Checked & Recommanded as per Checked & Certified as per the Contract
the Contract
Pura Neguma - Local Government Enhancement Sector Project
RENOVATION WORK OF INTAKE
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Work Done Work Done
Item Description Unit Nos Qty up to Qty for This Total
No Quantity
Length Breath Depth Previous Bill Bill
Internal Painting
Prepare the surfaces and apply one coat of wall
9 primer and two coats of emulsion paint in
Pump House Internal wall surfaces & soffit of
roof slab.
Internal Area m2 2.00 3.08 2.36 14.54
1.00 1.93 0.84 (1.62)
1.00 1.03 1.32 (1.36)
2.00 2.50 2.36 11.80
Internal Top Of the Ceiling m2 1.00 3.08 2.50 7.70
31.06 - 31.06
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per
the Contract
Pura Neguma - Local Government Enhancement Sector Project
RENOVATION WORK OF INTAKE
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Work Done Work Done
Item Description Unit Nos Qty up to Qty for This Total
No Quantity
Length Breath Depth Previous Bill Bill
Checked & Certified as per the Contract
Checked & Recommanded as per
the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
CLASS E - EARTHWORKS - - - - -
2.2 Depth exceeding 1.0 m but not exceeding 2.0 m m3 4.00 1,146.00 4,584.00 2.03 2,326.38 - 2.03 2,326.38
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
13 To sides of Screed of Aerator Base. (75 mm thick) m 10.50 131.00 1,375.50 10.40 1,362.40 - 10.40 1,362.40
14 To sides of Base of Aerator. m2 2.60 1,295.00 3,367.00 2.34 3,030.30 - 2.34 3,030.30
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 03 : CONSTRUCTION OF AERATOR
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 03 : CONSTRUCTION OF AERATOR
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
28 150 mm dia. DI Flanged and Plain ended nr 1 56,112.00 56,112.00 1.00 56,112.00 - 1.00 56,112.00
approximately 3,787 mm long pipe piece.
29 150 mm dia. DI D/F 900 Long Radius Bend. nr 1 25,517.00 25,517.00 1.00 25,517.00 - 1.00 25,517.00
30 150 mm dia. DI D/F 2,250 mm long pipe nr 1 42,601.00 42,601.00 - - 1.00 42,601.00 1.00 42,601.00
Outlet Pipes. - - - - - -
250 mm dia. DI Flanged and Plain ended pipe,
31 (300 mm long) with Puddle. nr 1 44,142.00 44,142.00 1.00 44,142.00 - 1.00 44,142.00
33 250 mm dia. DI Flange and Plain Ended nr 1 54,690.00 54,690.00 1.00 54,690.00 1.00 54,690.00
approximately 1,000 mm long pipe with Puddle.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 03 : CONSTRUCTION OF AERATOR
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
CLASS E - EARTHWORKS
CLASS E - EARTHWORKS
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
AERATOR
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Concrete Grade 25
Reinforced Concrete
7 In 225 mm thick base slab of Aerator. m3 1 0.23 2.60 2.60 1.52
1.52 - 1.52
9 In 150 mm thick tray no. 4 with conical edge m3 1.00 0.10 3.14 0.33 0.10
0.10 - 0.10
10 In 150 mm thick tray no. 3 with conical edge m3 1.00 0.46 3.14 0.33 0.48
0.48 - 0.48
11 In 150 mm thick tray no. 2 with conical edge m3 1.00 0.88 3.14 0.33 0.91
0.91 - 0.91
12 In 150 mm thick tray no. 1 with conical edge m3 1.00 1.46 3.14 0.33 1.51
1.51 - 1.51
FORMWORK
Rough Finished Formwork
(Plane Vertical.)
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
AERATOR
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
(Plain Sloping)
19 To Sloping sides of tray no.04 m2 1.00 0.25 3.14 0.79
m2 1.00 0.09 3.14 0.27
1.06 - 1.06
REINFORCEMENTS
24 6 mm dia. kg 2.27
5.68
7.95 - 7.95
25 10 mm dia. kg 55.98
176.27
232.25 - 232.25
26 16 mm dia. kg 185.22
185.22 - 185.22
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
AERATOR
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Bituminous Painting
Apply two coats of Bituminous Paint on the
27 four sides of the base , Upper surface of base m2
and for sides of column up to floor level. 4.00 0.23 2.60 2.34
1.00 3.36 0.76 2.55
1.00 2.60 2.60 6.76
1.00 0.80 0.88 0.70
1.00 0.80 0.88 (0.70)
1.00 0.075 3.14 0.24
CUMULATIVE QTY 11.89 11.89
BOQ QTY 5.00 - 5.00
EXCESS QTY 6.89 6.89
Inlet Pipe
150 mm dia. DI Flanged and Plain ended
28 nr 1 1.00
approximately 3,787 mm long pipe piece.
1.00 - 1.00
Outlet Pipes
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
1.1 Depth not exceeding 1.0 m m3 2.75 1,065.00 2,928.75 2.75 2,928.75 2.75 2,928.75
1.2 Depth exceeding 1.0 m but not exceeding 2.0 m m3 0.75 1,145.00 858.75 0.75 858.75 0.75 858.75
Excavation in Rock -
1.3 Extra-over excavation for above item no. 2 .1 &
2.2 for soft rock, (Provisional Quantity)(Not
requiring blasting)
m3 1.00 4,725.00 4,725.00
1.4 Extra-over excavation for above item no. 2.1, 2.2
& 3 for hard rock, (Provisional Quantity)
(Controlled blasting)
m3 1.00 13,125.00 13,125.00
1.5 Back filling around the structure with selected
excavated materials (other than top soil or rock)
to 95% of compaction as directed by the
Engineer. (Compaction reports should be
provided)
m3 2.00 830.00 1,660.00
TOTAL CARRIED FORWARD 23,297.50 - 3,787.50 3,787.50
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
2.10 In Columns including column footing m3 0.40 18,991.00 7,596.40 0.40 7,596.40 - 0.40 7,596.40
2.11 In Lintols m3 0.25 18,991.00 4,747.75 0.25 4,747.75 - 0.25 4,747.75
FORMWORK - - -
Rate to include for Splayed Edges, Battens,
Strutting, Bolting, Wedging, Easing, Striking and
Removal . - - -
2.12 In 225x150 mm Plinth Beam m2 10.25 1,295.00 13,273.75 9.13 11,823.35 - 9.13 11,823.35
2.13 In Columns m2 4.20 1,295.00 5,439.00 4.20 5,439.00 - 4.20 5,439.00
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 04: CONSTRUCTION OF CHEMICAL ADDING CHAMBER, CHEMICAL HOUSE & CHLORINE BATH
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 04: CONSTRUCTION OF CHEMICAL ADDING CHAMBER, CHEMICAL HOUSE & CHLORINE BATH
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Roller Door
2.30 Supplying, Fabricating and fixing of a Zn/Al Roller
door size 3,000 x 2,550 mm, having a maximum
clear width of 3.0 m and consisting of 0.6 mm
thick Zn/Al covering sheet, center bar pulleys,
side plates with necessary racers, fabricating
mechanical winding box with m.s square tube and
covering the box with metallic sheets, fixing on
site with bottom bars and G.I u-channels for
vertical guides at two vertical edges, which are
painted with two coats of anticorrosive paint and
two coats of enamel paint to match the colour of
door sheeting, and sound reduction rubber
beading embedded in the guide bars. Pulling rod
and chain to be provided for manual rolling
operation (Additional length of 225 mm to two
sides horizontally and 450 mm to upper end
inside the mechanical box as initial winding
vertically to be added to the clear opening area)
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
3.1 Depth not exceeding 1.0 m m3 4.50 1,065.00 4,792.50 2.71 2,886.15 - 2.71 2,886.15
TOTAL CARRIED FORWARD 3,096,892.10 2,013,281.02 227,073.53 2,240,354.55
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 04: CONSTRUCTION OF CHEMICAL ADDING CHAMBER, CHEMICAL HOUSE & CHLORINE BATH
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
No Description Unit Nos Qty up to Qty for This Quantity
Length Constant Depth Previous Bill Bill
1.1 Depth not exceeding 1.0 m m3 1.00 3.70 4.90 1.00 18.13
CUMULATIVE QTY - 18.13 18.13
BOQ QTY - 2.75 2.75
EXCESS QTY - 15.38 15.38
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 04: CONSTRUCTION OF CHEMICAL ADDING CHAMBER, CHEMICAL HOUSE & CHLORINE BATH
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
No Description Unit Nos Qty up to Qty for This Quantity
Length Constant Depth Previous Bill Bill
FORMWORK
Rough Finished Formwork
1.11 To sides of Base m2 2.00 0.20 1.40 0.56
2.00 0.20 1.80 0.72
- 1.28 1.28
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 04: CONSTRUCTION OF CHEMICAL ADDING CHAMBER, CHEMICAL HOUSE & CHLORINE BATH
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
No Description Unit Nos Qty up to Qty for This Quantity
Length Constant Depth Previous Bill Bill
CONCRETE WORK
Concrete in Grade 15
2.5 In 50 mm thick blinding concrete for
foundations m2 1.00 34.504 0.36 12.56
CUMULATIVE QTY 12.56 12.56
BOQ QTY 12.00 - 12.00
EXCESS QTY 0.56 0.56
Concrete in Grade 20
2.7 In 75 mm thick mass concrete in ground
floor m2 1.00 2.350 3.80 8.93
m2 1.00 2.300 1.70 3.91
m2 1.00 4.200 5.77 24.23
37.07 - 37.07
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 04: CONSTRUCTION OF CHEMICAL ADDING CHAMBER, CHEMICAL HOUSE & CHLORINE BATH
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
No Description Unit Nos Qty up to Qty for This Quantity
Length Constant Depth Previous Bill Bill
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
2.10 In Columns including column footing m3 1.000 0.900 0.900 0.240 0.19
m3 1.000 0.225 0.225 1.000 0.05
m3 1.000 3.000 0.225 0.225 0.15
0.40 - 0.40
FORMWORK
2.12 In 225x150 mm Plinth Beam m2 2.00 32.440 0.150 9.73
m2 2.00 4.000 0.500 0.150 (0.60)
9.13 - 9.13
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
No Description Unit Nos Qty up to Qty for This Quantity
Length Constant Depth Previous Bill Bill
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
REINFORCEMENTS
2.15 Tor Steel kg 57.71
159.80
CUMULATIVE QTY 217.51 217.51
BOQ QTY 100.00 - 100.00
EXCESS QTY 117.51 117.51
BRICK WORK
2.17 225 mm thick brick work in 1:5 cement sand
mortar m2 3.00 6.33 3.01 57.16
m2 3.00 0.50 6.33 0.95 9.02
m2 2.00 0.75 1.65 (2.48)
m2 1.00 1.75 2.67 (4.67)
m2 2.00 6.68 3.01 40.21
m2 1.00 3.00 2.55 (7.65)
m2 1.00 2.40 2.67 (6.41)
m2 1.00 2.40 3.62 8.69
m2 1.00 0.90 2.10 (1.89)
m2 1.00 34.76 0.15 (5.21)
86.77 - 86.77
MASONARY WORKS
Random Rubble Masonry in 1:5 cement sand
2.18 mortar in foundation m3 1.00 28.910 0.350 0.900 9.11
m3 4.00 0.500 0.350 0.900 (0.63)
m3 0.50 0.870 0.645 1.75 0.49
CUMULATIVE QTY 8.97 8.97
BOQ QTY 8.00 - 8.00
EXCESS QTY 0.97 0.97
ROOF WORK & CEILING
2.19 Supply, Fabricate & fixing of Zinc
Aluminium coated colour bonded profile
sheet roof on Category "A " timber frame
including 50 X 175 mm Ridge plate , 50
X100 mm Rafters, 50 X 50 mm reepers,
75 X 100 mm Wall plate etc. All timber
works to be treated with two coats of good
quality wood preservative approved by the
Engineer. Rate to be include for Ridging
with Zink Alumn Colour bonded ridge caps.
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
No Description Unit Nos Qty up to Qty for This Quantity
Length Constant Depth Previous Bill Bill
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
SURFACE FINISHES
2.22 Supplying and laying 1000 gauge polythene
sheet under side of floor
m2 1.00 2.350 3.80 8.93
m2 1.00 2.300 1.70 3.91
1.00 4.200 5.77 24.23
37.07 - 37.07
SURFACE FINISHES
2.23 External Plastering 16 mm thick in 1:1:5
cement lime sand to external walls, columns,
beams finished semi rough. Rate to include
for door and window reveals
m2 2.00 6.330 3.01 38.10
2.00 6.330 0.50 0.95 6.01
1.00 0.750 1.65 (1.23)
1.00 1.750 2.67 (4.67)
2.00 7.130 3.01 42.92
1.00 3.000 2.55 (7.65)
1.00 2.400 2.64 (6.33)
1.00 0.750 1.65 (1.23)
2.00 0.225 4.80 2.16
1.00 0.225 8.55 1.92
1.00 5.100 0.23 1.15
71.15 - 71.15
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 04: CONSTRUCTION OF CHEMICAL ADDING CHAMBER, CHEMICAL HOUSE & CHLORINE BATH
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
No Description Unit Nos Qty up to Qty for This Quantity
Length Constant Depth Previous Bill Bill
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
No Description Unit Nos Qty up to Qty for This Quantity
Length Constant Depth Previous Bill Bill
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
1.00 - 1.00
CONSTRUCTION OF CHEMICAL HOUSE
DOORS & WINDOWS
2.31 Supply, fabricate & fix Powder coated
Aluminium framed composite panel single
sash, Swing Door size 900x2,100 mm,
including 1 pair of 25 mm dia. 450 mm long
stainless steel handle, best quality door lock,
4 nrs Stainless steel hinges and other
accessories to manufacturer's details and to
the Engineer's approval
m2 1.00 0.900 2.13 1.92
1.92 - 1.92
MISCELLANEOUS
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 04: CONSTRUCTION OF CHEMICAL ADDING CHAMBER, CHEMICAL HOUSE & CHLORINE BATH
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
No Description Unit Nos Qty up to Qty for This Quantity
Length Constant Depth Previous Bill Bill
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
3.1 Depth not exceeding 1.0 m m3 1.00 0.700 1.80 2.15 2.71
2.71 - 2.71
Concrete Grade 15
Mass Concrete
3.4 75 mm thick screed m2 1.00 2.110 2.15 4.54
4.54 - 4.54
Concrete Grade 25
Reinforced Concrete
3.5 In 200 mm thick Base & walls of pond m3 1.00 1.100 0.20 2.15 0.47
1.00 0.630 0.20 2.15 0.27
1.00 1.150 0.20 2.15 0.49
1.00 1.650 0.20 2.15 0.71
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 04: CONSTRUCTION OF CHEMICAL ADDING CHAMBER, CHEMICAL HOUSE & CHLORINE BATH
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
No Description Unit Nos Qty up to Qty for This Quantity
Length Constant Depth Previous Bill Bill
REINFORCEMENTS
3.9 10 mm dia. kg 81.61
CUMULATIVE QTY 81.61 81.61
BOQ QTY 50.00 - 50.00
EXCESS QTY 31.61 31.61
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
No Description Unit Nos Qty up to Qty for This Quantity
Length Constant Depth Previous Bill Bill
Prepared Checked as per the Contract Checked & Recommanded as Checked & Certified as per the Contract
per the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
No.Of Length of
Item Bar Type & Size Space No.Of bars in Total Length of each mm each Total length Weight per Weight (kg)
Mark mem: each No. m
A B C mm m
Slab & Wall 5 T 12 1.0 16.0 16.0 2400.0 2400.0 38.40 0.889 34.14
6 T 12 1.0 8.0 8.0 600.0 600.0 4.80 0.889 4.27
Prepared Checked & Certified as per the Contract Checked & Certified as per the Contract Checked & Certified as per the Contract Certified & Recommanded as per
the Contractor
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
No.Of Length of
Item Bar Type & Size Space No.Of bars in Total Length of each mm each Total length Weight per Weight (kg)
Mark mem: each No. m
A B C mm m
Contractor Technical officer of Consultant/RDC Asst . QS RDC Asst . QS SPCU Senior Engineer
Pura Neguma - Local Government Enhancement Sector Project
BILL NO.05: CONSTRUCTION OF FLOCCULATOR & SEDIMENTATION TANK
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
Description Unit Nos Qty up to Qty for This
No Previous Bill Bill Quantity
Length Constant Depth
Site Preparation
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
Description Unit Nos Qty up to Qty for This
No Previous Bill Bill Quantity
Length Constant Depth
13 in Column Supports for Decanting Trough m3 4.00 0.225 0.225 5.100 1.03
1.03 - 1.03
Reinforcement
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
Description Unit Nos Qty up to Qty for This
No Previous Bill Bill Quantity
Length Constant Depth
Formwork
Rate to include for supplying & fixing to
shape
20 To sides of screed (75mm thick) m 7.60 3.14 23.86
6.40 3.14 20.09
5.20 3.14 16.32
4.00 3.14 12.56
72.83 - 72.83
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
FLOCCULATOR & SEDIMENTATION TANK
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
Description Unit Nos Qty up to Qty for This
No Previous Bill Bill Quantity
Length Constant Depth
25 Random Rubble masonry in 1:5 cement, m3 1.00 4.41 3.14 0.75 10.39
sand mortar in Sedimentation Tank Wall
1.00 4.41 3.14 0.28 3.88
1.00 7.29 3.14 0.63 14.42
1.00 10.89 3.14 0.63 21.54
1.00 15.21 3.14 0.63 30.09
1.00 20.25 3.14 0.63 40.06
1.00 17.22 3.14 1.00 54.07
1.00 0.56 3.14 0.75 (1.32)
0.33 15.43 3.14 2.75 (43.97)
1.00 12.25 3.14 1.00 (38.47)
90.69 - 90.69
Plastering
26 In Flocculator m2 4.00 3.140 3.625 1.30 59.19
4.00 3.140 4.70 1.30 76.74
- 135.93 135.93
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Pura Neguma - Local Government Enhancement Sector Project
FLOCCULATOR & SEDIMENTATION TANK
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
Description Unit Nos Qty up to Qty for This
No Previous Bill Bill Quantity
Length Constant Depth
Pipe Work - -
Inlet
29 280 mm dia. T-600 PVC Pipes m 1.00 2.25 2.25
2.25 - 2.25
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Pura Neguma - Local Government Enhancement Sector Project
FLOCCULATOR & SEDIMENTATION TANK
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
Description Unit Nos Qty up to Qty for This
No Previous Bill Bill Quantity
Length Constant Depth
FERROCEMENT
WALL 31 T 10 1.0 2.0 2.0 6000.0 6000.0 6000.0 6000.0 6000.0 1850.0 31850.00 63.70 0.617 39.30
32 T 10 1.0 2.0 2.0 6000.0 6000.0 6000.0 6000.0 460.0 24460.00 48.92 0.617 30.18
4mm
Dia GI
Inner Wall 34 Wire 1.0 31.0 31.0 22760.0 22760.00 705.56 0.104 73.38
4mm
Dia GI
Wire
Outer Wall 34 1.0 31.0 31.0 29510.0 29510.00 914.81 0.104 95.14
35 R 6 1.0 35.0 35.0 300.0 300.0 516.0 300.0 1416.00 49.56 0.222 11.00
Prepared Checked & Certified as per the Contract Checked & Certified as per the Contract Checked & Certified as per the Contract Certified & Recommanded as per
the Contractor
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Site Clearance
1 Clearing site, including removal of bushes, scrub, shrubs
and under growth Hedges. Rate to include for removing
debris from site
m2 100.00 73.00 7,300.00 100.00 7,300.00 - 100.00 7,300.00
Earth Works -
2 Excavation for Basement, Trenches and the like
commencing from existing ground level, in any material
other than rock including compacting bottom of
excavation
-
Rate to include for removing surplus excavated earth and
deposited at the direction of Engineer within the site
boundaries at suitable places not disturbing the surface
drainage; Rate to include cost of dewatering, Planking &
Strutting, if necessary.
-
2.1 Depth not exceeding 1.0 m m3 22.00 1,065.00 23,430.00 19.63 20,905.95 - 19.63 20,905.95
2.2 Depth exceeding 1.0 m but not exceeding 2.0 m m3 20.00 1,145.00 22,900.00 13.19 15,102.55 - 13.19 15,102.55
2.3 Depth exceeding 2.0 m but not exceeding 3.0 m m3 2.00 1,145.00 2,290.00 6.60 7,557.00 - 6.60 7,557.00
TOTAL CARRIED FORWARD 55,920.00 50,865.50 - 50,865.50
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 06: CONSTRUCTION OF RAPID SAND FILTER
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 06: CONSTRUCTION OF RAPID SAND FILTER
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
17 893.00
Allow 500.00
-
1,393.00
Add 27%. 376.11
Total Cost 1,769.11
6.00% 106.15
New Rate 1,875.00
FILTTER MEDIA
53 Filter sand up to thickness
of 600 mm
( Uniformity Coefficient of
Filter media 1.5 -1.75
Effective size -0.60mm)
11,150.00 27% 3,010.50
53.1 Filter Gravel Size of 2.5
mm -5.0 mm 12,100.00 27% 3,267.00
53.2 Filter Gravel Size of 5.0
mm -10.0 mm 12,125.00 27% 3,273.75
53.3 Filter Gravel Size of 10.0
mm -20.0 mm 13,900.00 27% 3,753.00
53.4 Filter Gravel Size of 20.0
mm -40.0 mm 15,450.00 27% 4,171.50
53.5 Filter Gravel Size of 40.0
mm -60.0 mm 15,450.00 27% 4,171.50
Item 01 - PNT11
( Consider 1m ) 225mm 110mm
Supply Cost 4,304.35 1,052.17
15% 645.65 157.83
Total Supply Cost 4,950.00 1,210.00
Rubber Rings 56.17 15.67
General Clearance
Excavation - 242.00
Disposal Excavated Material -
Laying 347.00 269.00
Flushing & Disinfection 27.00 17.00
Pressure Testing. 39.00 24.00
Backfilling (Selected Excavated Material) -
Dewatering - 140.00
Earth Work Support - 500.00
Trial Holes
Total Cost 413.00 1,192.00
Add 27% Overheads & Profits 111.51 321.84
524.51 1,513.84
Add 6% for 2019
Supplying & Laying Cost5,475.00 2,724.00
1,000.00
800.00
216.00
8,766.00
-
41,229.00
41,230.00
14,160.50 14,160.50
15,367.00 15,367.00
15,398.75 15,398.75
17,653.00 17,653.00
19,621.50 19,621.50
19,621.50 19,621.50
63mm
471.39
70.71
542.10
8.50
-
206.00
-
165.00
12.00
16.00
6.00
92.85
-
506.35
136.71
643.06
1,185.00
46
20,000.00
2,378.40
1,300.00
351.00
24,029.40
-
250x250 mm All Flanged Tee
Supply Cost 33,934.00
CIF Value 26,615.00
Custom Duty 5,988.00
32,603.00
13.80% 4,499.21
New Supply Cost 38,433.21
CIF Value 26,615.00
20% 26,615.00 5,323.00
Total Supply Cost including O & P 43,756.21
Laying 2,264.00 2,875.28
others 514.45 1,543.36
5,419.44 16,258.33
2,500.00 7,500.00
71,933.19
Laying 2,850.00
2,850.00 2,850.00
27% 769.50
Total Laying Cost including O & P 3,619.50
Rate Per 1nr 60,647.00
3000 mm long 60,647.00
90,767.00
32,897.04
Laying 1,937.00
Trust Blocks 2,609.00
Polythene Sleeving 173.00
Lubricants -
Total Cost 4,719.00
Add 27% Overheads & Profits 1,274.13
5,993.13
861.88
Supplying & Laying Cost 33,759.00
Laying 2,000.00
2,000.00 2,000.00
27% 540.00
Total Laying Cost including O & P 2,540.00
Rate Per 1nr 24,348.00
80 mm Dia. F/ plain ended Pipe 1350 mm long with puddle
Supply Cost 6,000.00
CIF Value 4,500.00
Custom Duty 1,000.00
5,500.00
13.80% 759.00
New Supply Cost 6,759.00
CIF Value 4,500.00
20% 4,500.00 900.00
Total Supply Cost including O & P 7,659.00
Laying 2,000.00
Allow for puddle 3,000.00
5,000.00 5,000.00
27% 1,350.00
Total Laying Cost including O & P 6,350.00
Rate Per 1nr 14,009.00
250 x 150 mm DI All Flanged Tee. 39 280mm dia. PVC 450 Socketed Bend.
PVC 450
From NWSDB Boo250x150 Supply 14,332.41
Supply 29,157.29 20% 2,866.48
20% 4,038.20 Total Supply Cost 17,198.89
Total Supply Cost 33,195.49 Laying 627.00
Laying 1,900.00 Rubber rings 521.00
Rubber rings 963.88 thrust block 2,609.00
thrust block 2,050.00 lubricants -
lubricants 50.00 Total 3,757.00
Total 4,963.88 27% 1,014.39
27% 1,340.25 4,771.39
6,304.13 4,771.39
21,970.00
39,500.00
PVC Pipe Laying
PNT11 PNT7
( Consider 1m ) 160mm 280mm 280mm
Table B- PVC/1 Supply Cost 1,315.00 3,872.00 2,506.00
Add 9% of supply cost
According to 9% 118.35 348.48 225.54
NWSDB Circular New Supply Cost 1,433.35 4,220.48 2,731.54
Add 20% of new supply cost as handling, O&P
20% 286.67 844.10 546.31
Total Supply Cost including O. & P. 1,720.02 5,064.58 3,277.85
24 DI Tees
( Consider 1nr ) 280x160
Table B- PVC/2 250X150 Soakted T 21,413.93 21,413.93 2,045.97
250mm Flange Adaptor 2nrs 18,020.13 36,040.25 1,554.48
150mm Flange Adaptor 1nrs 9,679.99 9,679.99 523.24
1 PNT11
( Consider 1m ) 225mm
Table B- PVC/1 Supply Cost 2,587.00
Add 9% of supply cost
According to 9% 232.83
NWSDB Circular New Supply Cost 2,819.83
Add 20% of new supply cost as handling, O&P
20% 563.97
Total Supply Cost including O. & P. 3,383.80
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Work Done Work Done
Item Description Unit Nos Qty up to Qty for This Total
No Length Constant Depth Previous Bill Bill Quantity
Site Clearance
Clearing site, including removal of bushes,
1 scrub, shrubs and under growth Hedges.
Rate to include for removing debris from
site m2 1.00 10.00 10.00 100.00
100.00 - 100.00
Earth Works
2 Excavation for Basement, Trenches and the
like commencing from existing ground level,
in any material other than rock including
compacting bottom of excavation
2.1 Depth not exceeding 1.0 m m3 1.00 3.140 6.250 1.000 19.63
19.63 - 19.63
Formwork
7
Rough finished Formwork in filter base,
channel base, manifold and ring beam m2 1.00 12.87 0.25 3.22
m2 1.00 16.13 0.30 4.85
1.00 10.99 0.30 3.30
11.36 - 11.36
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 06: CONSTRUCTION OF RAPID SAND FILTER
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Work Done Work Done
Item Description Unit Nos Qty up to Qty for This Total
No Length Constant Depth Previous Bill Bill Quantity
Reinforcement
8 Tor Steel bars, supplied, cut to length, bent
to shape, laid in position and tied with GI
wire
Kg 187.32
256.70
55.68
499.70 - 499.70
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 06: CONSTRUCTION OF RAPID SAND FILTER
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Work Done Work Done
Item Description Unit Nos Qty up to Qty for This Total
No Length Constant Depth Previous Bill Bill Quantity
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Work Done Work Done
Item Description Unit Nos Qty up to Qty for This Total
No Length Constant Depth Previous Bill Bill Quantity
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
FILTER WALL
(BRICK)
17 T 10 1.0 38.0 38.0 2375.0 2375.0 90.25 0.617 55.68
FERRO CEMENT
WALL
29 R 6 1.0 81.0 81.0 2550.0 2550.0 206.55 0.222 45.85
31 4mm Dia
GI Wire
1.0 50.0 50.0 16328.0 16328.0 816.40 0.104 85.00
Prepared Checked & Certified as per the Contract Checked & Certified as per the Contract Checked & Certified as per the Contract Certified & Recommanded as per
the Contractor
Pura Neguma - Local Government Enhancement Sector Project
CONSTRUCTION OF RAPID SAND FILTER
BAR SCHEDULE
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 10
Period Up to :- 31st July 2021
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 10th August 2021
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Site Clearance
1 Clearing site, including removal of bushes,
scrub, shrubs and under growth hedges. Rate to
include removal of debris from site and
deposited at the direction of Engineer with in
the site boundaries at suitable places not
disturbing to surface drainage.
m2 400.00 73.00 29,200.00 400.00 29,200.00 - 400.00 29,200.00
Excavation & Earth Work - - - -
2 Excavation for Base, Trenches and the like,
commencing from existing ground level, in any
material other than rock including compacting
bottom of excavation
- - - -
2.1 Depth not exceeding 1.0 m m3 230.00 1,065.00 244,950.00 221.94 236,366.10 - 221.94 236,366.10
2.2 Depth exceeding 1.0 m but not exceeding 2.0 m m3 230.00 1,145.00 263,350.00 221.94 254,121.30 - 221.94 254,121.30
2.3 Depth exceeding 2.0 m but not exceeding 3.0 m m3 230.00 1,260.00 289,800.00 221.94 279,644.40 - 221.94 279,644.40
2.4 Depth exceeding 3.0 m but not exceeding 4.0 m m3 50.00 1,260.00 63,000.00 50.00 63,000.00 - 50.00 63,000.00
- -
Excavation in Rock -
3 Extra-over excavation for above item no. 2 for
soft rock (Provisional Quantity)(No blasting
required) m3 15.00 4,725.00 70,875.00
4 Extra-over excavation for above items no. 2 & 3
for hard rock, (Provisional Quantity)
(Controlled blasting) m3 5.00 18,900.00 94,500.00
TOTAL CARRIED FORWARD 1,055,675.00 862,331.80 - 862,331.80
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
BROUGHT FORWARD 1,055,675.00 862,331.80 862,331.80
Earth Filling - - - -
5 Back filling around the structure with selected
excavated material (other than top soil or rock)
to 95% compaction as directed by the Engineer
(Compaction reports should be provided)
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Contractor Consultant TO/QS Consultant ARE/Engineer Asst . QS (SPCU) Engineer (SPCU)
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 07: CONSTRUCTION OF 450m3 CAPACITY GROUND RESERVOIR AT WATER TRATMENT PLANT AT KARUWALAGASWEWA
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
the Contract the Contract
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 07: CONSTRUCTION OF 450m3 CAPACITY GROUND RESERVOIR AT WATER TRATMENT PLANT AT KARUWALAGASWEWA
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
45 150 mm dia. DI Double Flanged approximately
1,500 mm long pipe with Puddle Flange at
center nr 4 40,782.00 163,128.00
TOTAL CARRIED FORWARD 13,849,798.50 - 11,285,163.95
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
BROUGHT FORWARD 13,849,798.50 - 11,285,163.95
46 150 mm dia. Foot Valve nr 4 75,759.00 303,036.00
47 100 mm dia. DI Double Flanged approximately
500 mm long pipe with Puddle Flange at center nr 2 23,497.00 46,994.00
48 100 mm dia. DI Double Flanged long Radius
Bend nr 2 28,762.00 57,524.00
49 150 mm dia. DI Double Flanged approximately
1,500 mm long pipe with Puddle Flange at
center nr 2 40,311.00 80,622.00
50 100 mm dia. Foot Valve nr 2 109,162.00 218,324.00
Inlet -
51 200 mm dia. DI Double Flanged pipe
approximately 600 mm long with Puddle Flange
nr 1 42,868.00 42,868.00 1.00 42,868.00 - 1.00 42,868.00
52 200 mm dia. DI Double Flanged 900 Long Radius
Bend
nr 2 74,267.00 148,534.00
53 200 mm dia. DI Double Flanged approximately
500 mm long pipe nr 1 34,208.00 34,208.00
54 200 mm dia. VJFA nr 1 22,907.00 22,907.00
55 200 mm dia. DI Flange & Plain Ended pipe 1,750
mm long nr 1 39,690.00 39,690.00
56 200 mm dia. DI Flange & Plain Ended pipe 1,000
mm long nr 1 29,435.00 29,435.00
TOTAL CARRIED FORWARD 14,873,940.50 42,868.00 - 11,328,031.95
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Site Clearance
2.2 Depth exceeding 1.0 m but not exceeding 2.0 m m3 16.20 13.70 1.00 221.94
221.94 - 221.94
2.3 Depth exceeding 2.0 m but not exceeding 3.0 m m3 16.20 13.70 1.00 221.94
221.94 - 221.94
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
450m3 CAPACITY GROUND RESERVOIR
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Concrete Work
Provision and Placing of Concrete Grade 35
A (Ready-mix Concrete)
12 In Roof Slab of Main Structure Opening with
thickness not exceeding 150 mm m3 1.00 15.60 13.10 0.15 30.65
m3 1.00 1.00 1.20 0.15 (0.18)
m3 8.00 0.40 0.40 0.15 (0.19)
30.28 - 30.28
Reinforcement
Tor steel Reinforcement cut to length, bent
to shape, placed in position and tied with GI
15 wire.
10 mm dia, 12 mm dia, 16 mm dia. (including in
Valve Chambers) mt 15.020
mt 4.220
mt 2.400
mt 0.140
21.780 - 21.78
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
450m3 CAPACITY GROUND RESERVOIR
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Formwork
Screed concrete for Valve Chamber & Reservoir 2 16.42 0.08 2.63
16 m2
with height not exceeding 100 mm 2 13.70 0.08 2.19
4.82 - 4.82
For sides of Main Structure Base & Valve 2 16.42 0.30 9.85
17 Chamber with height not exceeding 300 mm m2
2 13.70 0.30 8.22
18.07 - 18.07
Wrought
21 For sides of main structure walls (both sides)
up to soffit of Roof slab, including Baffle walls
m2 8.00 11.00 0.10 8.80
m2 8.00 11.00 0.40 35.20
m2 4.00 0.40 0.22 0.36
m2 4.00 0.20 0.50 0.40
m2 4.00 0.30 0.40 4.00 0.48
m2 0.90 13.10 11.79
m2 2.00 0.40 13.20 10.56
m2 0.40 13.10 5.24
m2 4.00 0.20 0.10 (0.08)
m2 4.00 0.95 0.30 0.50 (0.57)
m2 2.00 12.60 0.50 12.60
m2 0.50 12.50 6.25
m2 1.10 13.10 14.41
m2 12.50 0.80 10.00
m2 2.00 0.50 1.10 0.30 0.66
m2 2.00 2.08 1.10 4.56
m2 2.00 0.50 1.10 0.30 0.66
m2 2.00 1.78 0.80 2.85
m2 2.40 0.40 0.96
m2 24.40 0.40 0.50 4.88
m2 1.00 57.40 2.20 126.28
m2 1.00 55.00 2.20 121.00
m2 8.00 11.00 2.20 193.60
m2 1.00 57.40 0.33 18.66
m2 1.00 55.00 0.33 17.88
m2 8.00 11.00 0.33 28.60
m2 4.00 0.20 0.33 0.26
636.26 - 636.26
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Pura Neguma - Local Government Enhancement Sector Project
450m3 CAPACITY GROUND RESERVOIR
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Formwork
23 For soffit of 150 mm thick roof slab; maximum
height of 3.1 m from the base slab level
m2 1.00 15.60 13.10 204.36
m2 2.00 1.00 1.20 (2.40)
m2 8.00 0.40 0.40 (1.28)
m2 4.00 0.20 11.00 (8.80)
m2 8.00 1.60 0.15 1.92
m2 2.00 4.40 0.15 1.32
195.12 - 195.12
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Pipe Work
Inlet
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
No.Of Length of
Item Bar Type & Size Space No.Of bars in Total Length of each mm each Total length Weight per Weight (kg) Shape & Demension
Mark mem: each No. m
A B C mm m
Kurb Wall
1A T 10 1.0 527.0 527.0 200.0 200.0 105.40 0.617 65.03
Prepared Checked & Certified as per the Contract Checked & Certified as per the Contract Checked & Certified as per the Contract Certified & Recommanded as per
the Contractor
No.Of Length of
Item Bar Type & Size Space No.Of bars in Total Length of each mm each Total length Weight per Weight (kg) Shape & Demension
Mark mem: each No. m
A B C mm m
Contractor Technical officer of Consultant/RDC Asst . QS RDC Asst . QS SPCU Senior Engineer/Compliance Officer SPCU
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 08: CONSTRUCTION OF HIGH LIFT PUMP HOUSE
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
CLASS D - DEMOLITION AND SITE CLEARANCE
Site Preparation
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
BROUGHT FORWARD 56,893.50 48,738.51 - 48,738.51
5 Excavation for cable & Pipe duct in dry earth filling
with maximum depth not exceeding 1.5 m
commencing from finished ground level
m3 10.0 1,145.00 11,450.00
Excavation in Soft Rock / Rock -
6 Soft disintegrated rock/boulders (not requiring
blasting) m3 10.00 4,725.00 47,250.00
7 Hard Rock (Controlled Blasting) m3 5.00 13,125.00 65,625.00
Earth Filling -
8 Filling to structures, to make up levels with imported
natural material other than Top soil or Rock, watered
and well compacted to 98% compaction, as directed
by the Engineer (Compaction reports should be
provided)
m3 35.00 2,474.00 86,590.00
CLASS F - IN SITU CONCRETE -
Provision and placing of Concrete Grade 25
(Reinforced concrete) (Rate to include for cube
and slump tests as directed)
-
9 Grade 25 Mass Concrete m3 2.6 18,390.00 47,814.00 0.84 15,447.60 - 0.84 15,447.60
10 Grade 25 Reinforced Concrete m 3
5.6 19,440.00 108,864.00 5.60 108,864.00 - 5.60 108,864.00
- -
TOTAL CARRIED FORWARD 424,486.50 173,050.11 - - 173,050.11
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 08: CONSTRUCTION OF HIGH LIFT PUMP HOUSE
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
BROUGHT FORWARD 593,258.10 279,040.11 - - 279,040.11
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
BROUGHT FORWARD 1,478,908.00 902,874.51 - 902,874.51
Doors and Windows. -
28 Roller Shutter door (Type RD3). All complete to
smooth working order, as directed by the Engineer.
Overall Size 4,000x3,500 mm
nr 1.0 382,200.00 382,200.00
29 Timber panelled door with 75x10 mm rebated frame
and 28 mm thick sash and 300 mm high slats on top
(Type D1), Overall size 1,200x2,700 mm
nr 2.0 124,459.00 248,918.00
30 Glazed window with 75x100 mm rebated timber
frame and 28 mm thick sash including 300 mm high
slats at top; Overall size 1,200x1,650 mm
nr 2.0 76,059.00 152,118.00
31 Glazed window with 75x100 mm rebated timber
frame and 280 mm thick sash; Overall size
2,400x1,650 mm
nr 1.0 14,138.00 14,138.00
Floor Finishes
32 16 mm thick cement rendering on concrete floor slab
in 1:3 cement sand mortar, finished smooth with neat
red cement float
m2 43.0 905.00 38,915.00
33 100 mm high 20 mm thick skirting in 1:3 cement and
sand mortar finished smooth with neat red cement
float.
m 32.0 181.00 5,792.00
TOTAL CARRIED FORWARD 2,320,989.00 902,874.51 - 902,874.51
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
BROUGHT FORWARD 2,320,989.00 902,874.51 - 902,874.51
Wall Finishes -
34 16 mm thick internal wall plastering in 1:1:5 cement,
lime and sand mortar finished smooth with lime putty
on brick walls and concrete columns. Rate to include
for door and window reveals
m2 115.0 752.00 86,480.00 115.00 86,480.00 115.00 86,480.00
- -
35 20 mm thick external wall plastering in 1:1:5 cement,
lime and sand mortar finished semi-rough on brick
walls and concrete columns. Rate to include for door
and window reveals
m2 115.0 731.00 84,065.00 115.00 84,065.00 115.00 84,065.00
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
BROUGHT
Supplying FORWARD
& Fixing of 305 mm gith 0.47 mm thick 3,248,059.00 1,829,944.51 - 1,829,944.51
37 Zinc Aluminium colour bond valance board and barge
board fixed with MS 32x5mm brackets at 900 mm
C/c. Rates shall include for application of one coat of
anti corrosive paint and finishing coat of enamel paint
for MS brackets as per instruction given by the m 50.0 2,100.00 105,000.00 49.08 103,068.00 - 49.08 103,068.00
Engineer.
Electrical Installation -
38 10 mm2 4C PVC/PVC/Cu main incoming cable from
main control panel to distribution board
m 10.0 3,675.00 36,750.00
39 Three phase distribution board with 63A, 4 pole main
switch, 2 nr of 32A 2 pole current operated trip switch,
1 nr of 63A 4 pole current operated trip switch and 6
way MCB incorporated in one plastic box having
transparent front lid nr 1.0 84,000.00 84,000.00
40 4'-0", 40w single fluorescent fitting prismatic diffuser
type; Including point wiring nr 2.0 7,875.00 15,750.00
41 Wall brackets outdoor type lamp 20W; Including point
wiring nr 6.0 5,250.00 31,500.00
42 Exhaust fan of approved type and quality; All complete
with prior approval of the Engineer nr 1.0 15,750.00 15,750.00
43 13 Amp. switched socket outlet, flush type. nr 3.0 7,875.00 23,625.00
44 16 Amp. Wall mounted three phase industrial
switched socket outlet nr 10.0 15,750.00 157,500.00
45 Earthing system according to IEE regulations Item Lump Sum 15,750.00
Total Carried Over to Summary … 3,733,684.00 1,933,012.51 - 1,933,012.51
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Work Done Work Done
Item Description Unit Nos Qty up to Qty for This Total
No Quantity
Length Width Depth Previous Bill Bill
Site Preparation
1 Clearing site, including removal of bushes,
scrub, shrub and undergrowth and grubbing
up roots and cutting down small trees not
exceeding 500 mm girth. Rate to include m
2
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Pura Neguma - Local Government Enhancement Sector Project
HIGH LIFT PUMP HOUSE
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Work Done Work Done
Item Description Unit Nos Qty up to Qty for This Total
No Quantity
Length Width Depth Previous Bill Bill
Formwork
(Plane Vertical)
11 Masonry Work m2 4.00 5.95 0.300 7.14
m2 4.00 12.30 0.300 14.76
m2 12.00 0.36 0.175 0.76
m2 4.00 12.30 0.40 19.68
m2 2.00 5.95 0.40 4.76
m2 2.00 1.60 0.40 1.28
m2 9.00 5.95 0.300 16.07
CUMULATIVE QTY 64.45 64.45
BOQ QTY 2.20 - 2.20
EXCESS QTY 62.25 62.25
Reinforcement
Mild steel bar reinforcement cut to length,
bent to shape, placed in position and tied
with GI wire
16 6 mm dia kg 201.69
kg 35.16
CUMULATIVE QTY 236.85 236.85
BOQ QTY 49.00 - 49.00
EXCESS QTY 187.85 187.85
17 12 mm dia. kg 396.40
CUMULATIVE QTY 396.40 396.40
BOQ QTY 200.00 - 200.00
EXCESS QTY 196.40 196.40
18 16 mm dia. kg 394.61
kg 154.05
CUMULATIVE QTY 548.66 548.66
BOQ QTY 300.00 - 300.00
EXCESS QTY 248.66 248.66
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Pura Neguma - Local Government Enhancement Sector Project
HIGH LIFT PUMP HOUSE
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Work Done Work Done
Item Description Unit Nos Qty up to Qty for This Total
No Quantity
Length Width Depth Previous Bill Bill
Rubble work
21 450 mm thick vertical straight, rubble
masonry walls of foundation, in cement and
sand 1:5 mortar m2 2.00 12.30 1.10 27.06
2.00 5.55 1.10 12.21
CUMULATIVE QTY 39.27 39.27
BOQ QTY 19.70 - 19.70
EXCESS QTY 19.57 19.57
Rain Water Disposal
25 Zinc Aluminium coated colour bonded plain
sheet eave gutter 470 mm giirth fixed with
and including standard gutter brackets.
m 1.00 14.80 14.80
1.00 14.80 14.80
29.60 - 29.60
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Pura Neguma - Local Government Enhancement Sector Project
HIGH LIFT PUMP HOUSE
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Work Done Work Done
Item Description Unit Nos Qty up to Qty for This Total
No Quantity
Length Width Depth Previous Bill Bill
Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Wall Finishes
34 16 mm thick internal wall plastering in 1:1:5
cement, lime and sand mortar finished
smooth with lime putty on brick walls and
concrete columns. Rate to include for door
and window reveals
m2 1.00 12.30 4.60 56.58
m2 1.00 1.65 1.20 (1.98)
m2 0.50 6.50 1.63 5.30
m2 1.00 6.50 4.60 29.90
m2 1.00 1.20 2.00 (2.40)
m2 0.50 6.50 1.63 5.30
m2 1.00 6.50 4.60 29.90
m2 1.00 1.65 1.20 (1.98)
m2 1.00 3.55 4.00 (14.20)
m2 1.00 12.30 4.60 56.58
Windows Reveals m2 2.00 5.70 0.26 2.93
Door Reveals m2 1.00 6.40 0.26 1.66
Roller Door Reveals m2 1.00 11.10 0.26 2.89
CUMULATIVE QTY 170.48 170.48
BOQ QTY 115.00 - 115.00
EXCESS QTY 55.48 55.48
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Work Done Work Done
Item Description Unit Nos Qty up to Qty for This Total
No Quantity
Length Width Depth Previous Bill Bill
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
37
Supplying & Fixing of 305 mm gith 0.47 mm
thick Zinc Aluminium colour bond valance
board and barge board fixed with MS
32x5mm brackets at 900 mm C/c. Rates
shall include for application of one coat of
anti corrosive paint and finishing coat of
enamel paint for MS brackets as per
instruction given by the Engineer.
m 2.00 14.80 29.60
4.00 4.87 19.48
49.08 - 49.08
Pura Neguma - Local Government Enhancement Sector Project
HIGH LIFT PUMP HOUSE
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Work Done Work Done
Item Description Unit Nos Qty up to Qty for This Total
No Quantity
Length Width Depth Previous Bill Bill
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
CONC.BEAM TO
SUPPORT
I SECTION 9 T 16 3.0 5.0 15.0 6500.0 6500.0 97.50 1.580 154.05
10 R 6 3.0 44.0 132.0 350.0 200.0 350.0 200.0 100.0 1200.0 158.40 0.222 35.16
12 R 6 1.0 35.0 35.0 350.0 200.0 350.0 200.0 100.0 1200.0 42.00 0.222 9.32
Prepared Checked & Certified as per the Contract Checked & Certified as per the Contract Checked & Certified as per the Contract Certified & Recommanded as per
the Contractor
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Site Clearing and Anchoring
1 General clearing of the site (premises of 175 m3 Water
Tower) including removal of hedges, bushes, etc.
m2 230.00 73.00 16,790.00 230.00 16,790.00 230.00 16,790.00
- -
Rate shall include for compacting, dewatering &
Supporting sides of excavation, where necessary -
2 Excavation for base, trenches and the like, commencing
from existing ground level, in any material other than
rock, including compacting bottom of excavation
-
Rate to include for removing surplus excavated earth and
deposited at the direction of Engineer within the site
boundaries at suitable places not disturbing the surface
drainage; Rate to include cost of dewatering, Planking &
Strutting, if necessary. - -
2.1 Depth not exceeding 1.0 m m3 100.00 1,065.00 106,500.00 96.71 102,996.15 - 96.71 102,996.15
2.2 Depth exceeding 1.0 m but not exceeding 2.0 m m3 85.00 1,145.00 97,325.00 85.00 97,325.00 - 85.00 97,325.00
- -
Excavation in Rock - - - -
3 Extra-over for above item no. 2 for excavation of soft
rock, (Provisional Quantity)(No blasting required) m3 10.00 4,725.00 47,250.00 10.00 47,250.00 - 10.00 47,250.00
- -
4 Extra-over for above items no. 2 & 3 for excavation in
hard rock (Provisional Quantity)(Controlled blasting)
m3 10.00 13,125.00 131,250.00 10.00 131,250.00 - 10.00 131,250.00
- -
Earth Filling -
5 Earth filling under floors, using imported earth (other
than top soil or rock) to 95% compaction, as directed by
the Engineer (Compaction reports should be provided)
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 09: CONSTRUCTION OF 13 m HIGH, 175 m3 CAPACITY OVERHEAD TANK
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 09: CONSTRUCTION OF 13 m HIGH, 175 m3 CAPACITY OVERHEAD TANK
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 09: CONSTRUCTION OF 13 m HIGH, 175 m3 CAPACITY OVERHEAD TANK
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
the Contract the Contract
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 09: CONSTRUCTION OF 13 m HIGH, 175 m3 CAPACITY OVERHEAD TANK
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
BROUGHT FORWARD 9,043,719.00 6,437,036.22 93,456.25 6,530,492.47
31 Providing and fixing of 04 Nos. Sky lights with 12 mm
thick 225 mm dia armoured glass as depicted in the Item Lump Sum 21,000.00
32 drawing
2,100 mm high 600 mm wide 375 mm thick brick work
with 1:5 cement sand mortar as depicted in the drawing m3 4 15,687.00 62,748.00
33 1:3 plastering finished semi rough on brick work m2 30 705.00 21,150.00
34 Applying non toxic water proofing paint (Approved by
the Engineer) on internal wall os tank including bottom Item Lump Sum 436,800.00
35 Prepare and apply approved type one coat of filler and
two coats of weather proof emulsion paint to specified
colour in external walls
m2 665 612.00 406,980.00
36 Apply two coats of reflective type paint on top of the
Tank m2 125 2,100.00 262,500.00
Pipe Work
Outlet
37 Supply & Installation of approximately 4,000 mm long,
200 mm DI D/F pipes nr 2 73,527.00 147,054.00
38 Supply & Installation of approximately 3,600 mm long
200 mm DI D/F pipe nr 1 68,303.00 68,303.00
39 Supply & Installation of approximately 1,000 mm long
200 mm DI D/F pipe nr 1 34,073.00 34,073.00
40 Supply & Installation of approximately 1,150 mm long
200 mm DI F/PE pipe nr 1 31,772.00 31,772.00
TOTAL CARRIED FORWARD 10,536,099.00 6,437,036.22 93,456.25 6,530,492.47
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Excavation in Rock
Soft & hard rock Qty m3 3.14 30.80 1.41 136.36
136.36 - 136.36
Earth Filling
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
13 m HIGH, 175 m3 CAPACITY OVERHEAD TANK
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Plain Concrete
8 Providing and placing of Grade 15 plain
concrete in all levels where specified,
including proper compaction, curing etc. as
per the direction of Engineer
m3 3.14 32.62 0.08 7.68
7.68 - 7.68
RCC Concrete
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Pura Neguma - Local Government Enhancement Sector Project
13 m HIGH, 175 m3 CAPACITY OVERHEAD TANK
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Form work
15 Providing, fabrication and fixing to correct
levels, line and plumb, plain form work made
up of 12 mm plywood for all types of RCC
works at all levels including necessary
strutting, scaffolding, access and working
platforms, bracings, leaving necessary
openings, etc.
m2 1.00 34.85 0.30 10.45
m2 1.00 17.27 0.30 5.18
m2 1.00 22.29 0.15 3.34
m2 8.00 3.50 1.95 54.60
m2 8.00 2.06 0.53 8.65
m2 8.00 1.84 0.53 7.73
m2 8.00 3.90 0.50 0.30 4.68
m2 16.00 0.38 1.15 6.87
m2 16.00 0.60 1.15 10.99
m2 16.00 0.32 0.53 (2.68)
m2 8.00 1.95 1.70 26.52
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Pura Neguma - Local Government Enhancement Sector Project
13 m HIGH, 175 m3 CAPACITY OVERHEAD TANK
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Reinforcement steel
17
Supplying, cutting, bending, placing and
binding in position reinforcement steel in all
diameters as per the rebar drawings and bar
schedule t 4.120
t 3.040
t 0.790
t 0.164
t 4.588
t 0.987
t 2.289
t 1.394
t 0.266
t 0.55
17.638 0.55 18.19
Pura Neguma - Local Government Enhancement Sector Project
13 m HIGH, 175 m3 CAPACITY OVERHEAD TANK
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as Checked & Certified as per the Contract
per the Contract
Tank Walls 82 T 12 1.0 5.0 5.0 6000.0 6000.0 30.00 0.888 26.64
PLATFORM
No.06 84 T 10 1.0 1.0 1.0 375.0 1550.0 375.0 2300.0 2.30 0.617 1.42
85 T 10 1.0 1.0 1.0 375.0 1400.0 375.0 2150.0 2.15 0.617 1.33
86 T 10 1.0 1.0 1.0 375.0 1100.0 375.0 1850.0 1.85 0.617 1.14
Prepared Checked & Certified as per the Contract Checked & Certified as per the Contract Checked & Certified as per the Contract Certified & Recommanded as per
the Contractor
JMS No.:
JOIN MEASUREMENT SHEET (JMS)
Date:
Project Name: Construction of Water Supply Scheme for Karuwalagaswewa Pradeshiya Sabha
Project No.: NWP-AF-WS-CKD-15
Client: Chairman - Karuwalagaswewa Pradeshiya Sabha
Consultant: Resources Development Consultants (Pvt) Ltd.
Contractor: Sanken Construction (Pvt) Ltd.
Location:
Description of Measurement
TOTAL 24.69
Agreed by :
Contractor Consultant Puraneguma
Name : Name : Name :
Designation : Designation : Designation :
Signature
Signature : Signature :
:
Date : Date : Date :
WATER SUPPLY SCHEME FOR KARUWALAGASWEWA PRADESHIYA SABHA
13 m HIGH, 175 m3 CAPACITY OVERHEAD TANK
BAR SCHEDULE
#REF!
Bar No.Of Total Length of Total
Type & No.Of Length of each mm each length Weight Weight Shape &
Item Space bars in
Mark Size mem: each No. per m (kg) Demension
A B C D E mm m
Foundation
1 T 20 1.0 88.0 88.0 2925.0 2925.0 257.40 2.467 635.01
Bottom
Reinforcement 2 T 20 1.0 88.0 88.0 3110.0 3110.0 273.68 2.467 675.17
#REF!
Bar No.Of Total Length of Total
Type & No.Of Length of each mm each length Weight Weight Shape &
Item Space bars in
Mark Size mem: each No. per m (kg) Demension
A B C D E mm m
C/F 1727.74
B/F 1727.74
Foundation
15 T 20 1.0 14.0 14.0 5175.0 5175.0 72.45 2.467 178.73
Top
Reinforcement 16 T 20 1.0 8.0 8.0 5125.0 5125.0 41.00 2.467 101.15
#REF!
Bar No.Of Total Length of Total
Type & No.Of Length of each mm each length Weight Weight Shape &
Item Space bars in
Mark Size mem: each No. per m (kg) Demension
A B C D E mm m
C/F 3052.17
#REF!
Bar No.Of Total Length of Total
Type & No.Of Length of each mm each length Weight Weight Shape &
Item Space bars in
Mark Size mem: each No. per m (kg) Demension
A B C D E mm m
B/F 3052.17
Curcular Beam 24 T 20 1.0 4.0 4.0 6000.0 6000.0 24.00 2.467 59.21
in Foundation T 20 1.0 1.0 1.0 1475.0 1475.0 1.48 2.467 3.65
(Bottom R/F)
25 T 20 1.0 4.0 4.0 6000.0 6000.0 24.00 2.467 59.21
T 20 1.0 1.0 1.0 1960.0 1960.0 1.96 2.467 4.84
C/F 3492.53
#REF!
Bar No.Of Total Length of Total
Type & No.Of Length of each mm each length Weight Weight Shape &
Item Space bars in
Mark Size mem: each No. per m (kg) Demension
A B C D E mm m
B/F 3492.53
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Note :
Rate to include removing of existing pipes as
directed by the Engineer and hand over all
removed items to Karuwalagaswewa
Pradeshiya Sabha
1 Supplying and fixing of Zinc Aluminium Sheet tank
lid, including locking arrangement as per
instructions given by the Engineer.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Note :
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Note :
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
WATER SUPPLY SCHEME FOR KARUWALAGASWEWA PRADESHIYA SABHA
BILL NO. 10: RENOVATION OF EXISTING WATER TOWER AT KARUWALAGASWEWA PS AREA (60m3) & NEELAMALAPURA (30m3).
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Note :
………………….………... ……………………………………… ………………………………… ……..…………………………………. ……………………………………………….
Contractor Consultant TO/QS Consultant ARE/Engineer Asst . QS (SPCU) Engineer (SPCU)
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
WATER SUPPLY SCHEME FOR KARUWALAGASWEWA PRADESHIYA SABHA
BILL NO. 10: RENOVATION OF EXISTING WATER TOWER AT KARUWALAGASWEWA PS AREA (60m3) & NEELAMALAPURA (30m3).
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Note :
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Note :
TOTAL CARRIED FORWARD 1,054,064.00 248,650.50 - 248,650.50
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Note :
TOTAL CARRIED FORWARD 1,803,649.00 758,371.05 - 758,371.05
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
………………………………………………………………
Technical Officer (PS)
BROUGHT FORWARD 1,803,649.00 758,371.05 - 758,371.05
18
Supplying, fixing 300 mm wide M.S. ladder with 50
mm X 12 mm stringers and 20 mm rungs at 300
mm centers supplied with 75X75X9.5 mm angle
cleat 50X12 mm flat iron bent to shape, welded to
the ladder and fixed to concrete blocks with rag
bolts at Karuwalagaswewa PS tank . Rate to include
for galvanizing.
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM
DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Note :
20
Supply & fixing Pipe bracket comprising of 75 x 6
mm flat iron strap to Neelamalapura Tank
including all accessories. (80 mm &100 mm dia.
Pipes)
nr 8 1,575.00 12,600.00
Total Carried Over to Summary … 2,324,449.00 758,371.05 - 758,371.05
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
No Description Unit Nos Qty up to Qty for This Quantity
Length Constant Depth Previous Bill Bill
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
RENOVATION OF EXISTING WATER TOWER AT KARUWALAGASWEWA PS AREA (60m3) & NEELAMALAPURA (30m3).
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
No Description Unit Nos Qty up to Qty for This Quantity
Length Constant Depth Previous Bill Bill
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Pura Neguma - Local Government Enhancement Sector Project
RENOVATION OF EXISTING WATER TOWER AT KARUWALAGASWEWA PS AREA (60m3) & NEELAMALAPURA (30m3).
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Measurement
Item Work Done Work Done Total
No Description Unit Nos Qty up to Qty for This Quantity
Length Constant Depth Previous Bill Bill
13 DI Flange Adaptor
13.1 80mm/90mm DI flange adaptor Nos 11
13.2 100mm/110mm DI flange adaptor Nos 8
13.3 150mm/1600mm DI flange adaptor Nos 10
13.4 200mm/225mm DI flange adaptor Nos 2
ITEM RATE (Rs.)
NO. DESCRIPTION UNIT QTY AMOUNT (Rs.)
18 DI Couplings
150mm diameter DI coupling Nos 1
Grand Total:
……………………………………………………………………………………………….
Amount in words(withjout VAT):
……………………………………………………………………………………………….
Contractors Name:
……………………………………………………………………………………………….
Contractors Signature:
Witness 01:
……………………………………………………………………………………………….
Witness 02:
……………………………………………………………………………………………….
VAT registration No:
……………………………………………………………………………………………….
Company Seal
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 11: SUPPLY & LAYING OF uPVC AND DI PIPES, FITTINGS, SPECIALS AND VALVES
TOTAL PIPE FITTING
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Item Description DPR Date Zone No DPR No IPC NO nos Total Remark
No
PIPE FITTING
FIXING OF FITTINGS (All uPVC fittings
4.00 are to be Type PNT 11)
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Item Description DPR Date Zone No DPR No IPC NO nos Total Remark
No
……………………………… ……………………………………… ………………………………………………………… ……………………………………
Contractor Consultant To/Qs Consultant ARE/Engineer Engineer/To (SPCU)
4.17 63mm x 900 bends. 21.02.02 04 37 IPC 06 1.00
21.03.13 04 51 IPC 07 1.00
21.08.11 01 29 IPC 11 1.00 3.00
Cumulative Claim 3.00
Previous Claim 3.00
This Bill Claim -
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per
Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 11: SUPPLY & LAYING OF uPVC AND DI PIPES, FITTINGS, SPECIALS AND VALVES
TOTAL PIPE FITTING
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Item Description DPR Date Zone No DPR No IPC NO nos Total Remark
No
4.37 160 dia uPVC Repair socket. 21.12.18 GM 31 IPC 14 1.00 1.00
Cumulative Claim 1.00
Previous Claim 1.00
This Bill Claim -
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per
Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 11: SUPPLY & LAYING OF uPVC AND DI PIPES, FITTINGS, SPECIALS AND VALVES
TOTAL PIPE FITTING
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Item Description DPR Date Zone No DPR No IPC NO nos Total Remark
No Checked & Recommanded as per the Checked & Certified as per
Contract the Contract
CROSSINGS
Crossing Type (D)
12.16 For 110 mm dia. PVC up to 6.0 m 21.04.23 01 18 IPC 08 1.00
21.09.30 07 19 IPC 12 1.00
21.10.08 07 27 IPC 12 1.00
21.10.22 07 39 IPC 12 1.00
21.10.22 07 39 IPC 12 1.00
21.10.30 07 53 IPC 12 1.00
21.11.27 07 68 IPC 13 1.00
21.11.29 07 70 IPC 13 1.00
21.11.27 07 72 IPC 14 1.00 9.00
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 11: SUPPLY & LAYING OF uPVC AND DI PIPES, FITTINGS, SPECIALS AND VALVES
TOTAL PIPE FITTING
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Item Description DPR Date Zone No DPR No IPC NO nos Total Remark
No
Cumulative Claim 9.00
Previous Claim 9.00
This Bill Claim -
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per
Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Item Description DPR Date Zone No DPR No IPC NO nos Total Remark
No
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per
Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
……………………………… ……………………………………… ………………………………………………………… ……………………………………
Contractor Consultant To/Qs Consultant ARE/Engineer Engineer/To (SPCU)
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 11: SUPPLY & LAYING OF uPVC AND DI PIPES, FITTINGS, SPECIALS AND VALVES
PREVIOUS TOTAL LENGTH OF PIPE LAYING, PRESSURE TESTING & FITTINGS
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Location
Item No Zone No DPR Description Unit Nos Length Breadth Depth Previous Current Total Qty
No Qty Qty
From To
2.00 PIPE WORK
2.2 PNT 7 - 160mm
Pipe Laying
GM 1 21.11.23 2+198.5 2+240.5 m 42.00 42.00 42.00
GM 2 21.11.25 2+240.5 2+294.5 m 54.00 54.00 54.00
GM 3 21.11.26 2+294.5 2+378.5 m 84.00 84.00 84.00
GM 4 21.11.27 2+378.5 2+426.5 m 48.00 48.00 48.00
GM 5 21.11.29 0+073 0+043 m 24.00 24.00 24.00
GM 8 21.11.29 4+945.00 4+921.00 m 30.00 30.00 30.00
GM 6 21.11.30 0+043 0+002.5 m 36.00 36.00 36.00
GM 7 21.12.01 6+750 6+642 m 108.00 108.00 108.00
GM 9 21.12.04 6+642 6+522 m 120.00 120.00 120.00
GM 10 21.12.05 2+426.5 2+432.5 m 6.00 6.00 6.00
GM 11 21.12.06 6+522 6+450 m 72.00 72.00 72.00
GM 12 21.12.07 3+409.2 3+547.2 m 138.00 138.00 138.00
GM 13 21.12.07 2+432.5 2+492.5 m 60.00 60.00 60.00
GM 14 21.12.07 4+945 4+994.21 m 48.00 48.00 48.00
GM 15 21.12.08 3+547.2 3+697.2 m 150.00 150.00 150.00
GM 16 21.12.08 2+492.5 2+582.5 m 90.00 90.00 90.00
GM 17 21.12.08 4+994.21 5+042.21 m 48.00 48.00 48.00
GM 18 21.12.09 2+582.5 2+702.5 m 120.00 120.00 120.00
GM 19 21.12.09 3+697.2 3+877.2 m 180.00 180.00 180.00
GM 20 21.12.10 3+877.2 3+997.2 m 120.00 120.00 120.00
GM 21 21.12.10 0+696 0+654 m 42.00 42.00 42.00
GM 22 21.12.10 0+622.3 0+580.3 m 42.00 42.00 42.00
GM 23 21.12.11 0+580.3 0+526.3 m 54.00 54.00 54.00
GM 24 21.12.11 3+997.2 4+195.2 m 198.00 198.00 198.00
GM 25 21.12.11 0+492.3 0+438.5 m 54.00 54.00 54.00
Total C/F 1,968.00 1,968.00
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 11: SUPPLY & LAYING OF uPVC AND DI PIPES, FITTINGS, SPECIALS AND VALVES
PREVIOUS TOTAL LENGTH OF PIPE LAYING, PRESSURE TESTING & FITTINGS
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Location
Item No Zone No DPR Description Unit Nos Length Breadth Depth Previous Current Total Qty
No Qty Qty
From To
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 11: SUPPLY & LAYING OF uPVC AND DI PIPES, FITTINGS, SPECIALS AND VALVES
PREVIOUS TOTAL LENGTH OF PIPE LAYING, PRESSURE TESTING & FITTINGS
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Location
Item No Zone No DPR Description Unit Nos Length Breadth Depth Previous Current Total Qty
No Qty Qty
From To
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Location
Item No Zone No DPR Description Unit Nos Length Breadth Depth Previous Current Total Qty
No Qty Qty
From To
Current Qty 172.80
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 11: SUPPLY & LAYING OF uPVC AND DI PIPES, FITTINGS, SPECIALS AND VALVES
PREVIOUS TOTAL LENGTH OF PIPE LAYING, PRESSURE TESTING & FITTINGS
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 11: SUPPLY & LAYING OF uPVC AND DI PIPES, FITTINGS, SPECIALS AND VALVES
PREVIOUS TOTAL LENGTH OF PIPE LAYING, PRESSURE TESTING & FITTINGS
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 11: SUPPLY & LAYING OF uPVC AND DI PIPES, FITTINGS, SPECIALS AND VALVES
PREVIOUS TOTAL LENGTH OF PIPE LAYING, PRESSURE TESTING & FITTINGS
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 11: SUPPLY & LAYING OF uPVC AND DI PIPES, FITTINGS, SPECIALS AND VALVES
PREVIOUS TOTAL LENGTH OF PIPE LAYING, PRESSURE TESTING & FITTINGS
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 11: SUPPLY & LAYING OF uPVC AND DI PIPES, FITTINGS, SPECIALS AND VALVES
PREVIOUS TOTAL LENGTH OF PIPE LAYING, PRESSURE TESTING & FITTINGS
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 11: SUPPLY & LAYING OF uPVC AND DI PIPES, FITTINGS, SPECIALS AND VALVES
PREVIOUS TOTAL LENGTH OF PIPE LAYING, PRESSURE TESTING & FITTINGS
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 10th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
……………………………… ……………………………………… ………………………………………………………… ……………………………………
Contractor Consultant To/Qs Consultant ARE/Engineer Engineer/To (SPCU)
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 11: SUPPLY & LAYING OF uPVC AND DI PIPES, FITTINGS, SPECIALS AND VALVES
Precasting Chamber
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked & Certified as per the Contract Checked & Certified as per the Contract Checked & Certified as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Contractor Technical officer of Consultant/RDC Asst . QS RDC Asst . QS SPCU Senior Engineer/Compliance Officer SPCU
Prepared Checked & Certified as per the Contract Checked & Certified as per the Contract Checked & Certified as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Contractor Technical officer of Consultant/RDC Asst . QS RDC Asst . QS SPCU Senior Engineer/Compliance Officer SPCU
Item Complete of Transport and Concreting Balance fixing DI lid and Finishing
Description Unit Qty. Casting up to 0.6m Placing chamber Walls (as per site completing chamber Total Complete
No. Chamber
Height at site requirement) as per the drawing
Claiming precentage 40% 5% 15% 30% 10%
Gate Valves
Supply & Fixing of Section valves complete,
including construction of Valve Chamber as shown
in detail on drawings no. NWP/AF/WS/CKD-15/
KGW/TP-05, NWP/AF/WS/CKD-15/ KGW/TP-06,
Prepared Checked & Certified as per the Contract Checked & Certified as per the Contract Checked & Certified as per the Checked & Certified as per the Contract
Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 11: SUPPLY & LAYING OF uPVC AND DI PIPES, FITTINGS, SPECIALS AND VALVES
Precasting Chamber
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
2 PNT7
( Consider 1m ) 225 mm 160mm 110mm
Table B- PVC/1 Supply Cost 1,908.00 912.00 450.00
Add 9% of supply cost
According to 9% 171.72 82.08 40.50
NWSDB
Circular New Supply Cost 2,079.72 994.08 490.50
Add 20% of new supply cost as handling, O&P
20% 415.94 198.82 98.10
Total Supply Cost including O. & P. 2,495.66 1,192.90 588.60
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 03
Period Up to :- 31st October 2020
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 19th November 2020
Extra Work 01. u'PVC Common Trench (110mm Dia. PNT 11& Per Rate 15.2M At Murukkatuwana Junction
90mm Dia. PNT 7 ) Road Crossing - 15.2M
1.00 Material
1.1 ABC 4.02 Cu 7,167.00 28,811.34
1.2 Quarry Dust 2.46 Cu 8,167.00 20,090.82
2.00 Labour
2.1 Fitter 1.00 Day 2,300.00 2,300.00
2.2 Unskill 6.00 Day 1,725.00 10,350.00
3.00 Machinary
3.1 JCB 10.50 Day 3,500.00 36,750.00
3.2 Wacker 1.00 Day 3,000.00 3,000.00
4.00 Staff
4.1 Technical Officer 1.00 Day 1,500.00 1,500.00
4.2 Supervisor 1.00 Day 1,000.00 1,000.00
Say 131,828.74
Prepared Checked & Certified as per the Contract Checked & Certified as per the Contract Checked & Certified as per the
Contract
Checked & Certified as per the Checked & Certified as per the Contract Checked & Certified as per the
Contract Contract
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
............................ ............................
Checked as per the contract Cerified as per the contract
Consultant TO/ QS Engineer (SPCU)
............................
Prepared
Contractor
WATER SUPPLY SCHEME FOR KARUWALAGASWEWA PRADESHIYA SABHA
INTERIM PAYMNET
BILL NO. 12: SUPPLY & INSTALLATION OF ELECTRICAL & MECHANICAL EQUIPMENT
#REF!
#REF!
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
............................ ............................
Checked as per the contract Cerified as per the contract
Consultant TO/ QS Engineer (SPCU)
............................
Prepared
Contractor
WATER SUPPLY SCHEME FOR KARUWALAGASWEWA PRADESHIYA SABHA
INTERIM PAYMNET
BILL NO. 12: SUPPLY & INSTALLATION OF ELECTRICAL & MECHANICAL EQUIPMENT
#REF!
#REF!
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
............................ ............................
Checked as per the contract Cerified as per the contract
Consultant TO/ QS Engineer (SPCU)
............................
Prepared
Contractor
WATER SUPPLY SCHEME FOR KARUWALAGASWEWA PRADESHIYA SABHA
INTERIM PAYMNET
BILL NO. 12: SUPPLY & INSTALLATION OF ELECTRICAL & MECHANICAL EQUIPMENT
#REF!
#REF!
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
............................ ............................
Checked as per the contract Cerified as per the contract
Consultant TO/ QS Engineer (SPCU)
............................
Prepared
Contractor
WATER SUPPLY SCHEME FOR KARUWALAGASWEWA PRADESHIYA SABHA
INTERIM PAYMNET
BILL NO. 12: SUPPLY & INSTALLATION OF ELECTRICAL & MECHANICAL EQUIPMENT
#REF!
#REF!
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
............................ ............................
Checked as per the contract Cerified as per the contract
Consultant TO/ QS Engineer (SPCU)
............................
Prepared
Contractor
WATER SUPPLY SCHEME FOR KARUWALAGASWEWA PRADESHIYA SABHA
INTERIM PAYMNET
BILL NO. 12: SUPPLY & INSTALLATION OF ELECTRICAL & MECHANICAL EQUIPMENT
#REF!
#REF!
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
............................ ............................
Checked as per the contract Cerified as per the contract
Consultant TO/ QS Engineer (SPCU)
............................
Prepared
Contractor
WATER SUPPLY SCHEME FOR KARUWALAGASWEWA PRADESHIYA SABHA
INTERIM PAYMNET
BILL NO. 12: SUPPLY & INSTALLATION OF ELECTRICAL & MECHANICAL EQUIPMENT
#REF!
#REF!
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
-
Rate to include for necessary power cables, PVC
conduits etc., breaking of walls, floor, etc. and
making good complete as directed by the
engineer. Item Lump Sum 630,000.00
36 Testing, commissioning and handing over the
system, to the satisfaction of the Engineer.
Required test Instruments for testing
programme shall be provided by the Contractor.
Item Lump Sum 10,500.00
37 Submission of all documents including technical
literature, O & M manual as per the specifications
- 3 sets. Item Lump Sum 3,150.00
............................ ............................
Checked as per the contract Cerified as per the contract
Consultant TO/ QS Engineer (SPCU)
............................
Prepared
Contractor
WATER SUPPLY SCHEME FOR KARUWALAGASWEWA PRADESHIYA SABHA
INTERIM PAYMNET
BILL NO. 12: SUPPLY & INSTALLATION OF ELECTRICAL & MECHANICAL EQUIPMENT
#REF!
#REF!
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
............................ ............................
Checked as per the contract Cerified as per the contract
Consultant TO/ QS Engineer (SPCU)
............................
Prepared
Contractor
WATER SUPPLY SCHEME FOR KARUWALAGASWEWA PRADESHIYA SABHA
INTERIM PAYMNET
BILL NO. 12: SUPPLY & INSTALLATION OF ELECTRICAL & MECHANICAL EQUIPMENT
#REF!
#REF!
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
............................ ............................
Checked as per the contract Cerified as per the contract
Consultant TO/ QS Engineer (SPCU)
............................
Prepared
Contractor
WATER SUPPLY SCHEME FOR KARUWALAGASWEWA PRADESHIYA SABHA
INTERIM PAYMNET
BILL NO. 12: SUPPLY & INSTALLATION OF ELECTRICAL & MECHANICAL EQUIPMENT
#REF!
#REF!
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
ITEM
NO. DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
............................ ............................
Checked as per the contract Cerified as per the contract
Consultant TO/ QS Engineer (SPCU)
............................
Prepared
Contractor
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 13: MISCELLANEOUS WORK.
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
1 For Payment of actual charges incurred for Supply &
Installation of Transformer. PS 3,150,000.00 PS 693,044.10 PS 693,044.10
1.1 Percentage adjustment to Provisional Sum for supply &
installation of Transformer in , Item 1(….4…%) Item Lump Sum 126,000.00 4% 27,721.76 4% 27,721.76
2 For Payment of actual charges incurred for Supplying &
Handing over, Tool Kit & lab equipment to
Karuwalagaswewa Pradeshiya Sabha. The following
items should be supplied
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
160mm
90 0 45 0 22.5 0 11.25 0
Supply 4,277.57 2,463.22 2,463.22 2,463.22
15% 641.64 369.48 369.48 369.48
Total Supply Cost 4,919.21 2,832.70 2,832.70 2,832.70
Laying 362.00 362.00 362.00 362.00
Rubber rings 207.00 207.00 207.00 207.00
thrust block 1,305.00 559.00 373.00 187.00
lubricants 50.00 50.00 50.00 50.00
Total 1,924.00 1,178.00 992.00 806.00
27% 519.48 318.06 267.84 217.62
2,443.48 1,496.06 1,259.84 1,023.62
Add 6% to convert 2018 to 2019 2,590.09 1,585.82 1,335.43 1,085.04
7,509.00 4,419.00 4,168.00 3,918.00
Say 7,510.00 4,420.00 4,170.00 3,920.00
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Certified as per the Contract
Checked & Recommanded as per the
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
PIPE WORK
GENERAL NOTES FOR LAYING OF PIPES & FITTINGS
1.1 110 mm Dia. m 1,803.00 1,863.00 3,358,989.00 1,670.04 3,111,284.52 92.66 172,618.13 1,762.70 3,283,902.65
1.2 90 mm Dia. m 10,421.00 1,748.00 18,215,908.00 3,564.31 6,230,410.38 1,358.10 2,373,955.30 4,922.41 8,604,365.68
1.3 63 mm Dia. m 1,750.00 1,194.00 2,089,500.00 57.95 69,192.30 - 57.95 69,192.30
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Pura Neguma - Local Government Enhancement Sector Project
VARIATION ODER NO : 03
CONSTRUCTION OF WATER SUPPLY SCHEME (NELAMALAPURA)
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Washout Valves
Supply and fixing of Washout valves complete
including the construction of Valve Chamber. All
as per shown in detail on drawing. No. NWP/
AF /WS /CKD -15 /KGW/TP-06
3.1 110mm uPVC main, 80 mm Sluice valve nr 2.00 321,938.00 643,876.00
3.2 90mm uPVC main, 80 mm Sluice valve nr 6.00 321,938.00 1,931,628.00
Supply and fixing of Air valves complete including
construction of Valve Chamber as shown in detail
on drawing no. NWP/AF/WS/CKD-15/KGW/TP-02
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Gate Valves
Supply & Fixing of Section valves complete,
including construction of Valve Chamber as
shown in detail on drawings no.
NWP/AF/WS/CKD-15/ KGW/TP-04
3.5 110 mm uPVC main nr 2.00 365,444.00 730,888.00
3.6 90 mm uPVC main nr 8.00 351,347.00 2,810,776.00
5.1 300 x 300 mm Column Support 1 height varies 0.0 - nr 2.00 65,490.00 130,980.00
3.0m
300 x 300 mm Column Support 1 height varies 3.0 -
5.2 6.0m nr 2.00 99,450.00 198,900.00
5.3 450 x 450x 600 mm Pipe Support nr 4.00 6,353.00 25,412.00
Pura Neguma - Local Government Enhancement Sector Project
VARIATION ODER NO : 03
CONSTRUCTION OF WATER SUPPLY SCHEME (NELAMALAPURA)
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
ITEM DESCRIPTION UNIT QTY AS PER BOQ's PREVIOUSE CLAIM CURRENT CLAIM CUMULATIVE CLAIM
NO.
RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts. Rs. Cts.
Prepared Checked as per the Contract Checked & Recommanded as per Checked as per the Contract Checked & Certified as per
the Contract the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Item Location
Zone No DPR Description Unit Nos Length Breadth Depth Previous Current Total Qty
No No Qty Qty
From To
1.00 PIPE WORK
1.1 PNT 7 - 110mm
8 1 21.12.19 4+690.5 4+738.5 m 48.00 48.00 48.00
8 2 21.12.20 4+738.5 4+864.5 m 126.00 126.00 126.00
8 3 21.12.21 4+864.5 4+990.5 m 126.00 126.00 126.00
8 4 21.12.23 4+990.5 5+134.62 m 144.00 144.00 144.00
8 5 21.12.24 5+134.62 5+200.62 m 66.00 66.00 66.00
8 7 21.12.26 5+200.62 5+381.62 m 181.00 181.00 181.00
8 8 21.12.27 5+381.62 5+573.62 m 192.00 192.00 192.00
8 9 21.12.28 5+573.62 5+627.62 m 54.00 54.00 54.00
8 10 21.12.29 5+627.62 5+751.62 m 120.00 120.00 120.00
8 11 21.12.30 5+751.62 5+787.62 m 36.00 36.00 36.00
8 12 21.12.31 5+787.62 5+913.62 m 126.00 126.00 126.00
8 13 22.01.01 5+913.62 5+931.62 m 18.00 18.00 18.00
8 14 22.01.03 5+931.62 6+051.62 m 120.00 120.00 120.00
8 15 22.01.04 6+051.62 6+195.62 m 144.00 144.00 144.00
8 16 22.01.05 6+195.62 6+297.62 m 102.00 102.00 102.00
8 17 22.01.06 6+297.62 6+381.62 m 84.00 84.00 84.00
8 18 22.01.07 6+381.62 6+429.62 m 48.00 48.00 48.00
8 27 22.01.31 6+429.62 6+543.62 m 114.00 114.00 114.00
8 47 22.02.25 5+657.62 5+664.22 m 6.60 6.60 6.60
Pressure Testing
8 3 22.02.27 4+690.5 5+657.62 m 967.12 967.12 967.12
8 4 22.02.27 5+657.62 6+543.62 m 886.00 886.00 886.00
Total Qty 1,855.60 - 1,855.60
90% of Pipe Laying Qty 1,670.04 - 1,670.04
05% of Pressure Testing Qty - 92.66 92.66
Total Qty 1,670.04 92.66 1,762.70
As per the Previous Qty - IPC 1,670.04
Current Qty 92.66
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
……………………………… ……………………………………… ………………………………………………………… ……………………………………
Contractor Consultant To/Qs Consultant ARE/Engineer Engineer/To (SPCU)
Pura Neguma - Local Government Enhancement Sector Project
VARIATION ODER NO : 03
CONSTRUCTION OF WATER SUPPLY SCHEME (NELAMALAPURA)
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as per the Contract Checked & Certified as per the Contract
……………………………… ……………………………………… ………………………………………………………… ……………………………………
Contractor Consultant To/Qs Consultant ARE/Engineer Engineer/To (SPCU)
Total B/F 3,870.00 - 3,870.00
8 48 06.03.22 5+855.2 5+747.2 m 108.00 108.00 108.00
8 49 07.03.22 5+747.2 5+645.2 m 102.00 102.00 102.00
8 50 08.03.22 5+645.2 5+459.2 m 186.00 186.00 186.00
8 51 10.03.22 5+459.2 5+219.1 m 240.10 240.00 240.00
8 52 11.03.22 5+219.1 5+129.1 m 90.00 90.00 90.00
8 53 12.03.22 5+129.1 5+009.1 m 120.00 120.00 120.00
8 54 26.03.22 5+009.1 4+937.1 m 72.00 72.00 72.00
8 55 27.03.22 4+937.1 4+799.1 m 138.00 138.00 138.00
8 56 28.03.22 4+799.1 4+676.1 m 123.00 123.00 123.00
8 57 29.03.22 4+676.1 4+544.1 m 132.00 132.00 132.00
8 58 30.03.22 4+544.1 4+412.1 m 132.00 132.00 132.00
8 59 31.03.22 4+412.1 4+358.1 m 54.00 54.00 54.00
8 60 31.03.22 5+855.2 5+867.2 m 12.00 12.00 12.00
Pressure Testing
8 1 22.02.25 6+704.72 7+554.72 m 850.00 850.00 850.00
8 2 22.02.25 7+554.72 8+198.78 m 644.06 644.06 644.06
8 4 22.02.27 6+543.62 6+675.72 m 132.10 132.10 132.10
Prepared Checked as per the Contract Checked & Recommanded as per the Contract Checked & Certified as per the Contract
……………………………… ……………………………………… ………………………………………………………… ……………………………………
Contractor Consultant To/Qs Consultant ARE/Engineer Engineer/To (SPCU)
Pura Neguma - Local Government Enhancement Sector Project
VARIATION ODER NO : 03
CONSTRUCTION OF WATER SUPPLY SCHEME (NELAMALAPURA)
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Item Location
Zone No DPR Description Unit Nos Length Breadth Depth Previous Current Total Qty
No No Qty Qty
From To
1.00 PIPE WORK
1.3 PNT 7 - 63mm
8 6 21.12.24 0+000 0+061 m 61.00 61.00 61.00
Pressure Testing
8 3 22.02.27 0+000 0+061 m 61.00 61.00 61.00
-
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the Contract
Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Item
Description Pipe Dia DPR Date Zone DPR Start End Sub Total Quantity
No No No Chanage Chanage (m)
PIPE FITTING
FIXING OF FITTINGS (All uPVC fittings are to
2.00 be Type PNT 11)
2.11 110 dia uPVC Repair socket. 25.02.22 08 47 IPC 17 2.00 2.00
Cumulative Claim 2.00
Previous Claim 2.00
This Bill Claim -
Prepared Checked as per the Contract Checked & Recommanded as per Checked & Certified as per the
the Contract Contract
Pura Neguma - Local Government Enhancement Sector Project
VARIATION ODER NO : 03
CONSTRUCTION OF WATER SUPPLY SCHEME (NELAMALAPURA)
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Item
Description Pipe Dia DPR Date Zone DPR Start End Sub Total Quantity
No No No Chanage Chanage (m)
……………………………… ……………………………………… ………………………………………………………… ……………………………………
Contractor Consultant To/Qs Consultant ARE/Engineer Engineer/To (SPCU)
Pura Neguma - Local Government Enhancement Sector Project
DAY WORK SUMMARY
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per the Contract Checked as per the Contract Checked & Certified as per
the Contractor
Pura Neguma - Local Government Enhancement Sector Project
DAY WORK SUMMARY
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per the Contract Checked as per the Contract Checked & Certified as per
the Contractor
Pura Neguma - Local Government Enhancement Sector Project
DAY WORK SUMMARY
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per the Contract Checked as per the Contract Checked & Certified as per
the Contractor
Pura Neguma - Local Government Enhancement Sector Project
DAY WORK SUMMARY
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Location Measurement
ItemNo Zone DPR No Description Unit Nos Previous Current Total Qty
No From To Length Breath Depth Qty Qty
MACHINARY
3.00 Excavator-0.45 m3
Prepared Checked as per the Contract Checked & Recommanded Checked & Certified as per the Contract
as per the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Location Measurement
ItemNo Zone DPR No Description Unit Nos Previous Current Total Qty
No From To Length Breath Depth Qty Qty
03.02.2022 -Filling water to excisting pipe line for tracing the end of pipe line Day 1.00 1.00
1.00 - 1.00
12 Water Pump (2" dia)
Prepared Checked as per the Contract Checked & Recommanded Checked & Certified as per the Contract
as per the Contract
Pura Neguma - Local Government Enhancement Sector Project
BILL NO. 14: DAY WORK
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Location Measurement
ItemNo Zone DPR No Description Unit Nos Previous Current Total Qty
No From To Length Breath Depth Qty Qty
18 Generator
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Location Measurement
ItemNo Zone DPR No Description Unit Nos Previous Current Total Qty
No From To Length Breath Depth Qty Qty
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Location Measurement
ItemNo Zone DPR No Description Unit Nos Previous Current Total Qty
No From To Length Breath Depth Qty Qty
Checked & Recommanded
as per the Contract Checked & Certified as per the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Location Measurement
ItemNo Zone DPR No Description Unit Nos Previous Current Total Qty
No From To Length Breath Depth Qty Qty
Prepared Checked as per the Contract Checked & Recommanded Checked & Certified as per the Contract
as per the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Location Measurement
ItemNo Zone DPR No Description Unit Nos Previous Current Total Qty
No From To Length Breath Depth Qty Qty
Prepared Checked as per the Contract Checked & Recommanded Checked & Certified as per the Contract
as per the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Location Measurement
ItemNo Zone DPR No Description Unit Nos Previous Current Total Qty
No From To Length Breath Depth Qty Qty
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Prepared Checked as per the Contract Checked & Recommanded as per the Contract Checked as per the Contract Checked & Certified as per
the Contractor
…………………………... …………………………………………………. ………………………………………………… ...…….…………………………………………
…………………………………………………….
Contractor Consultant TO/QS Consultant ARE/Engineer Asst . QS SPCU Engineer (SPCU)
Pura Neguma - Local Government Enhancement Sector Project
EXTRA WORK NO:04 (EXTRA FITTINGS COST)
MEASUREMENT SHEET
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 10th May 2022
Measurement
Item Description Unit Nos Quantity Remark
No Length Breath Depth
22.01.07
GM
75mm upvc Pipe m 4.00
1''Pipe m 2.00
1/2''Pipe m 1.30
75mm Double Socket nos 2.00
1'' Double Socket nos 2.00
1/2'' Double Socket nos 2.00
22.01.08
GM
75mm upvc Pipe m 3.50
1/2''Pipe m 2.00
75mm Double Socket nos 2.00
1/2'' Double Socket nos 2.00
22.01.12
CO/33
50mm upvc Pipe m 8.00
1/2''Pipe m 8.00
50mm Double Socket nos 4.00
1/2'' Double Socket nos 4.00
22.01.13
CO/34
1''Pipe m 8.00
1/2''Pipe m 4.00
1'' Double Socket nos 6.00
1/2'' Double Socket nos 2.00
22.01.26
GM
32mm upvc Pipe m 16.00
1/2''Pipe m 20.00
32mm Double Socket nos 2.00
1/2'' Double Socket nos 6.00
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 10th May 2022
Measurement
Item Description Unit Nos Quantity Remark
No Length Breath Depth
Contractor Consultant To/Qs Consultant ARE/Engineer Engineer/To (SPCU)
CURRENT TOTAL
75mm upvc Pipe m 7.50 7.50 7.50
50mm upvc Pipe m 8.00 8.00 8.00
32mm upvc Pipe m 16.00 16.00 16.00
1''Pipe m 10.00 10.00 10.00
1/2''Pipe m 35.30 35.30 35.30
75mm Double Socket nos 4.00 4.00 4.00
50mm Double Socket nos 4.00 4.00 4.00
32mm Double Socket nos 2.00 2.00 2.00
1'' Double Socket nos 8.00 8.00 8.00
1/2'' Double Socket nos 16.00 16.00 16.00
PREVIOUS TOTAL
90mm upvc Pipe m 18.50 18.50 18.50
90mm R/Socket nos 12.00 12.00 12.00
1/2''Pipe m 101.40 101.40 101.40
1/2''Socket nos 41.00 41.00 41.00
2" upvc Pipe m 4.00 4.00 4.00
2" mm R/Socket nos 4.00 4.00 4.00
1/2'' Eaqul Tee nos 1.00 1.00 1.00
90mmX 50mm R/Tee nos 1.00 1.00 1.00
90mm x 1/2''Clamp Saddle nos 1.00 1.00 1.00
63mm upvc Pipe m 4.00 4.00 4.00
63mm R/Socket nos 1.00 1.00 1.00
110mm upvc Pipe m 2.00 2.00 2.00
110mm R/Socket nos 1.00 1.00 1.00
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 10th May 2022
Measurement
Item Description Unit Nos Quantity Remark
No Length Breath Depth
……………………………… ………………………………………………… ………………………………………………………… …………………………………………………………
Contractor Consultant To/Qs Consultant ARE/Engineer Engineer/To (SPCU)
Pura Neguma - Local Government Enhancement Sector Project
MATERIAL USED ON THIS BILL
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as Checked & Certified as
per the Contract per the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
Prepared Checked as per the Contract Checked & Recommanded as Checked & Certified as
per the Contract per the Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
No Item Unit Recived Qty Balance Qty Used Qty Rate Used Metrial Value
1.0 225mm x 450 Bends (PNT 11 Bends) nos 8.00 7.00 1.00 8,249.19 57,744.33
2.0 225mm x 22.50 Bends (PNT 11 Bends)
0
nos 8.00 8.00 - 6,402.15 51,217.20
3.0 225mm x 11.250 Bends (PNT 11 Bends) nos 6.00 6.00 - 5,319.20 31,915.20
4.0 160mm x 90 Bends (PNT 11 Bends)
0
nos 35.00 33.00 2.00 3,236.82 106,815.06
5.0 160mm x 450 Bends (PNT 11 Bends) nos 36.00 35.00 1.00 2,688.27 94,089.45
6.0 160mm x 22.5 Bends (PNT 11 Bends)
0
nos 28.00 27.00 1.00 2,322.30 62,702.10
7.0 160mm x 11.25 Bends (PNT 11 Bends)
0
nos 18.00 15.00 3.00 2,322.30 34,834.50
8.0 110mm x 900 Bends (PNT 11 Bends) nos 20.00 20.00 - 1,339.04 26,780.80
9.0 110mm x 45 Bends (PNT 11 Bends)
0
nos 26.00 24.00 2.00 1,033.07 24,793.68
10.0 110mm x 22.5 Bends (PNT 11 Bends)
0
nos 24.00 20.00 4.00 935.86 18,717.20
11.0 110mm x 11.250 Bends (PNT 11 Bends) nos 14.00 10.00 4.00 935.86 9,358.60
12.0 90mm x 90 Bends (PNT 11 Bends)
0
nos 20.00 13.00 7.00 861.81 11,203.53
13.0 90mm x 450 Bends (PNT 11 Bends) nos 20.00 19.00 1.00 772.61 14,679.59
14.0 90mm x 22.5 Bends (PNT 11 Bends)
0
nos 24.00 18.00 6.00 654.07 11,773.26
15.0 90mm x 11.25 Bends (PNT 11 Bends)
0
nos 4.00 3.00 1.00 654.07 1,962.21
16.0 63mm x 900 Bends (PNT 11 Bends) nos 20.00 16.00 4.00 316.78 5,068.48
17.0 63mm x 45 Bends (PNT 11 Bends)
0
nos 20.00 20.00 - 316.78 6,335.60
18.0 63mm x 22.5 Bends (PNT 11 Bends)
0
nos 16.00 16.00 - 316.78 5,068.48
19.0 63mm x 11.250 Bends (PNT 11 Bends) nos 4.00 4.00 - 316.78 1,267.12
20.0 160mm x 160mm Tee (PNT 11 uPVC Tee) nos 3.00 3.00 - 14,390.00 43,170.00
21.0 160mm x 110mm Tee (PNT 11 uPVC Tee) nos 3.00 3.00 - 13,690.00 41,070.00
22.0 110mm x 110mm Tee (PNT 11 uPVC Tee) nos 6.00 5.00 1.00 6,500.00 32,500.00
23.0 110mm x 90mm Tee (PNT 11 uPVC Tee) nos 20.00 11.00 9.00 6,100.00 67,100.00
24.0 110mm x 63mm Tee (PNT 11 uPVC Tee) nos 10.00 1.00 9.00 5,700.00 5,700.00
25.0 90mm x 90mm Tee (PNT 11 uPVC Tee) nos 15.00 4.00 11.00 4,900.00 19,600.00
26.0 90mm x 63mm Tee (PNT 11 uPVC Tee) nos 26.00 15.00 11.00 4,450.00 66,750.00
27.0 63mm x 63mm Tee (PNT 11 uPVC Tee) nos 10.00 4.00 6.00 3,110.00 12,440.00
28.0 225mm Dia (PNT 11 uPVC Repair Socket) nos 5.00 5.00 - 5,756.76 28,783.80
29.0 160mm Dia (PNT 11 uPVC Repair Socket) nos 25.00 17.00 8.00 2,615.32 44,460.44
30.0 110mm Dia (PNT 11 uPVC Repair Socket) nos 25.00 23.00 2.00 1,135.14 26,108.22
31.0 90mm Dia (PNT 11 uPVC Repair Socket) nos 32.00 17.00 15.00 756.76 12,864.92
32.0 160-110mm (PNT 11 uPVC Reducer) nos 3.00 3.00 - 5,240.00 15,720.00
33.0 63mm Dia (PNT 11 uPVC End Cap) nos 60.00 60.00 - 66.25 3,975.00
34.0 90mm Dia (PNT 11 uPVC Pipe) lm 100.00 100.00 - 538.47 53,847.00
35.0 110mm Dia (PNT 11 uPVC Pipe) lm 6,950.00 3,856.44 3,093.56 652.41 2,515,980.02
36.0 160mm Dia (PNT 11 uPVC Pipe) lm 1,880.00 1,543.06 336.94 1,391.88 2,147,754.35
C/F 5,714,150.14
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the
Contract Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
No Item Unit Recived Qty Balance Qty Used Qty Rate Used Metrial Value
B/F 5,714,150.14
37.0 110mm Dia (PNT 7 uPVC Pipe) lm 7,560.00 4,221.26 3,338.74 453.31 1,913,539.37
38.0 160mm Dia (PNT 7 uPVC Pipe) lm 825.00 - 825.00 927.81 -
39.0 225mm Dia (PNT 7 uPVC Pipe) lm 500.00 487.06 12.94 1,825.53 889,142.64
40.0 Filter Media Gravel 2.5 -5.0mm m3 1.50 1.50 - 16,000.00 24,000.00
41.0 Filter Media Gravel 5.0 - 10.0mm m3 1.50 1.50 - 18,000.00 27,000.00
42.0 Filter Media Gravel 10.0 - 20.0mm m3 2.00 2.00 - 25,000.00 50,000.00
43.0 Filter Media Gravel 20.0 -40.0mm m3 2.00 2.00 - 25,000.00 50,000.00
44.0 Filter Media Gravel 40.0 -60.0mm m3 2.50 2.50 - 25,000.00 62,500.00
45.0 225mm x 90 Bends (PNT 11 Bends)
0
nos 6.00 6.00 - 8,292.05 49,752.30
46.0 63mm Dia (PNT 11 uPVC Repair Socket) nos 33.00 27.00 6.00 418.92 11,310.84
47.0 90mm Dia (PNT 11 uPVC End Cap) nos 30.00 17.00 13.00 251.22 4,270.74
48.0 QT Bar 10mm (12M Length) Ton 3.006 3.01 126,000.00 -
49.0 QT Bar 12mm (12M Length) Ton 7.000 7.000 126,000.00 -
50.0 QT Bar 25mm (12M Length) Ton 4.671 4.671 126,000.00 -
51.0 DN 150mm D/F Pipe 500mm with Puddle nos 6.00 5.00 1.00 28,000.00 140,000.00
52.0 DN 250mm F/PE Pipe 500mm with Puddle nos 1.00 1.00 - 27,200.00 27,200.00
53.0 DN 250mm Puddle Flange nos 1.00 1.00 - 6,100.00 6,100.00
54.0 GI Pipe 6''x5.4 / 5.8m nos 24.00 16.33 7.67 37,037.04 604,814.86
55.0 Penstock Door Frame & Other Accessories nos 1.00 1.00 - 178,525.00 178,525.00
56.0 250mm Dia. D/F Short Radius Bend 90deg Nr 2.00 1.00 1.00 31,500.00 31,500.00
57.0 280mm Dia (PNT 11 uPVC Pipe) lm 126.00 126.00 - 6,474.72 815,814.72
58.0 110mm Dia (PNT 11 uPVC Pipe) lm 18.00 18.00 - 952.35 17,142.30
59.0 90mm Dia (PNT 11 uPVC Pipe) lm 12.00 12.00 - 786.08 9,432.96
60.0 160mm Dia (PNT 11 uPVC Pipe) lm 36.00 36.00 - 2,031.34 73,128.24
61.0 63mm Dia (PNT 11 uPVC End Cap) nos 20.00 20.00 - 77.91 1,558.20
62.0 110mm x 450 Bends (PNT 11 Bends) nos 2.00 2.00 - 1,033.07 2,066.14
63.0 110mm x 90mm Tee (PNT 11 uPVC Tee) nos 1.00 1.00 - 12,260.00 12,260.00
64.0 160mm x 90mm Tee (PNT 11 uPVC Tee) nos 5.00 4.00 1.00 24,330.00 97,320.00
65.0 90mm x 90mm Tee (PNT 11 uPVC Tee) nos 18.00 18.00 - 5,830.00 104,940.00
66.0 280mm Dia (PNT 11 uPVC Pipe) lm 30.00 26.90 3.10 6,474.72 174,169.97
67.0 63mm Dia Tapered Core Tapered Flange Set 6.00 6.00 - 4,178.71 25,072.26
68.0 90mm x 450 Bends (PNT 11 Bends) nos 8.00 8.00 - 772.61 6,180.88
69.0 QT Bar 10mm (12M Length) Ton 7.46 6.97 0.49 146,000.00 1,018,204.00
70.0 QT Bar 12mm (12M Length) Ton 5.08 5.08 - 146,000.00 741,680.00
71.0 QT Bar 25mm (12M Length) Ton 2.00 2.00 - 146,000.00 292,000.00
72.0 110mm x 900 Tee (PNT 11 Tee) nos 7.00 7.00 - 12,260.00 85,820.00
73.0 160mm Dia (PNT 7 uPVC Pipe) lm 9,225.00 4,344.00 4,881.00 1,464.07 6,359,920.08
74.0 90mm Dia (PNT 7 uPVC Pipe) lm 8,592.00 8,592.00 366.34
75.0 90mm Dia (PNT 7 uPVC Pipe) lm 1,500.00 1,500.00 366.34
76.0 90mm Dia (PNT 7 uPVC Pipe) lm 20,790.76 7,090.26 13,700.50 577.12 4,091,930.85
77.0 225mm Dia (PNT 7 uPVC Pipe) lm 399.96 399.96 - 2,882.39 1,152,840.70
C/F 24,865,287.20
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the
Contract Contract
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
No Item Unit Recived Qty Balance Qty Used Qty Rate Used Metrial Value
B/F 24,865,287.20
78.0 63mm Dia (PNT 7 uPVC Pipe) lm 7,164.00 2,433.92 4,730.08 298.70 727,011.90
79.0 63mm Dia (PNT 7 uPVC Pipe) lm 5,034.00 5,034.00 191.58
80.0 160mm Dia (PNT 11 uPVC Pipe) lm 219.96 219.96 - 2,202.72 484,510.29
81.0 280mm x 900 Bends (PNT 11 Bends) Bell nos 2.00 1.00 1.00 18,334.64 18,334.64
82.0 280mm x 900 Bends (PNT 11 Bends) gum nos 5.00 2.00 3.00 29,362.58 58,725.16
83.0 280mm x 450 Bends (PNT 11 Bends) nos 2.00 2.00 - 18,291.78 36,583.56
84.0 225mm x 900 Bends (PNT 11 Bends) nos 2.00 2.00 - 8,292.05 16,584.10
85.0 110mm x 900 Bends (PNT 11 Bends) nos 1.00 1.00 - 1,334.04 1,334.04
86.0 90mm x 900 Bends (PNT 11 Bends) nos 1.00 1.00 - 861.81 861.81
87.0 160mm x 900 Bends (PNT 11 Bends) nos 2.00 2.00 - 3,236.82 6,473.64
88.0 160mm x 450 Bends (PNT 11 Bends) nos 2.00 2.00 - 2,688.34 5,376.68
89.0 63mm x 450 Bends (PNT 11 Bends) nos 3.00 2.00 1.00 316.78 633.56
90.0 90mm x 450 Bends (PNT 11 Bends) nos 7.00 7.00 - 772.61 5,408.27
91.0 110mm Dia (PNT 7 uPVC Pipe) lm 300.00 300.00 - 715.22 214,566.00
92.0 90mm Dia (PNT 11 uPVC Pipe) lm 60.00 60.00 - 786.08 47,164.80
93.0 63mm Dia (PNT 7 uPVC Pipe) lm 951.96 951.96 - 298.70 284,350.45
94.0 225mmx160mm Dia (PNT11 uPVC Reducer Socket) nos 1.00 1.00 - 18,716.93 18,716.93
95.0 160mmx110mm Dia (PNT11 uPVC Reducer Socket) nos 3.00 3.00 - 5,240.00 15,720.00
96.0 110mmx90mm Dia (PNT11 uPVC Reducer Socket) nos 10.00 9.00 1.00 2,900.00 26,100.00
97.0 110mmx63mm Dia (PNT11 uPVC Reducer Socket) nos 3.00 - 3.00 8,071.43 -
98.0 110mmx63mm Dia (PNT11 uPVC Reducer Tee) nos 5.00 5.00 - 5,700.00 28,500.00
99.0 50'x 3mm GI Wire Mesh Roll 7.00 - 7.00 23,231.48 -
100.0 4mm GI Wire Kg 318.00 318.00 333.33 -
101.0 90mm Dia (PNT 7 uPVC Pipe) lm 10,420.98 5,041.98 5,379.00 704.56 3,552,377.43
102.0 63mm Dia (PNT 7 uPVC Pipe) lm 1,749.96 1,688.96 61.00 363.39 613,751.17
103.0 110mm Dia (PNT 7 uPVC Pipe) lm 1,803.00 1,803.00 873.57 -
104.0 110mm x 22.50 Bends (PNT 11 Bends) nos 3.00 3.00 - 1,411.00 4,233.00
105.0 110mm x 11.250 Bends (PNT 11 Bends) nos 3.00 3.00 - 1,411.00 4,233.00
106.0 90mm x 22.50 Bends (PNT 11 Bends) nos 20.00 20.00 - 994.00 19,880.00
107.0 90mm x 11.250 Bends (PNT 11 Bends) nos 20.00 20.00 - 994.00 19,880.00
108.0 63mm x 22.50 Bends (PNT 11 Bends) nos 2.00 2.00 - 353.00 706.00
109.0 110mm x 110mm Tee (PNT 11 uPVC Tee) nos 5.00 5.00 - 8,990.00 44,950.00
110.0 110mm x 63mm Tee (PNT 11 uPVC Tee) nos 2.00 1.00 1.00 12,240.00 12,240.00
111.0 90mm x 90mm Tee (PNT 11 uPVC Tee) nos 1.00 1.00 5,830.00 -
112.0 90mm x 63mm Tee (PNT 11 uPVC Tee) nos 3.00 3.00 - 8,620.00 25,860.00
113.0 63mm x 63mm Tee (PNT 11 uPVC Tee) nos 1.00 1.00 - 3,180.00 3,180.00
114.0 63mm Dia (PNT 11 uPVC Repair Socket) nos 4.00 4.00 - 418.92 1,675.68
115.0 90mm Dia (PNT 11 uPVC Repair Socket) nos 10.00 9.00 1.00 756.76 6,810.84
116.0 110mm Dia (PNT 11 uPVC Repair Socket) nos 2.00 - 2.00 1,135.00 -
117.0 110mmx90mm Dia (PNT11 uPVC Reducer Socket) nos 6.00 5.00 1.00 3,280.00 16,400.00
118.0 63mm Dia (PNT 11 uPVC End Cap) nos 7.00 7.00 - 83.59 585.13
119.0 90mm Dia (PNT 11 uPVC End Cap) nos 4.00 4.00 - 320.13 1,280.52
C/F 31,190,285.81
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the
Contract Contract
Pura Neguma - Local Government Enhancement Sector Project
MATERIAL AT SITE
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
No Item Unit Recived Qty Balance Qty Used Qty Rate Used Metrial Value
B/F 31,190,285.81
DI TOTAL ODER
1.0 Double Flange DI Pipe
1.1 150mm Diameter
1.1.1 5500 mm long Nos 9.00 9.00 78,540.00 706,860.00
1.1.2 4000 mm long Nos 6.00 6.00 63,600.00 381,600.00
1.1.3 3500 mm long Nos 2.00 2.00 59,100.00 118,200.00
1.1.4 3000 mm long Nos 3.00 3.00 54,600.00 163,800.00
1.1.5 1500 mm long Nos 4.00 4.00 41,100.00 164,400.00
1.1.6 2675 mm long Nos 2.00 2.00 54,600.00 109,200.00
1.1.7 1600 mm long Nos 1.00 1.00 45,600.00 45,600.00
1.1.8 2250 mm long Nos 1.00 - 1.00 50,100.00 -
1.1.9 500 mm long Nos 1.00 1.00 32,100.00 32,100.00
1.1.10 5800 mm long Nos 1.00 1.00 102,600.00 102,600.00
1.1.11 5000 mm long Nos 1.00 1.00 73,304.00 73,304.00
-
1.2 100mm Diameter -
1.2.1 5500 mm long Nos 20.00 20.00 64,500.00 1,290,000.00
1.2.2 5000 mm long Nos 4.00 4.00 60,500.00 242,000.00
1.2.3 4000 mm long Nos 20.00 20.00 52,500.00 1,050,000.00
1.2.4 3500 mm long Nos 6.00 6.00 48,500.00 291,000.00
1.2.5 3000 mm long Nos 3.00 3.00 44,500.00 133,500.00
1.2.6 2000 mm long Nos 7.00 7.00 36,500.00 255,500.00
1.2.7 1500 mm long Nos 1.00 1.00 32,500.00 32,500.00
1.2.8 1150 mm long Nos 1.00 1.00 32,500.00 32,500.00
1.2.9 2400 mm long Nos 1.00 1.00 40,500.00 40,500.00
1.2.10 1800 mm long Nos 1.00 1.00 36,500.00 36,500.00
1.2.11 1000 mm long Nos 4.00 4.00 28,500.00 114,000.00
1.2.12 5800 mm long Nos 2.00 2.00 80,080.00 160,160.00
1.2.13 5100 mm long Nos 1.00 1.00 64,500.00 64,500.00
1.2.14 3100 mm long Nos 1.00 1.00 48,500.00 48,500.00
-
1.3 80mm Diameter -
1.3.1 5500mm long Nos 8.00 8.00 66,000.00 528,000.00
1.3.2 4000mm long Nos 8.00 8.00 52,500.00 420,000.00
1.3.3 3500mm long Nos 6.00 6.00 48,000.00 288,000.00
1.3.4 2000mm long Nos 3.00 3.00 34,500.00 103,500.00
1.3.5 1500mm long Nos 15.00 15.00 30,000.00 450,000.00
1.3.6 3200mm long Nos 1.00 1.00 48,000.00 48,000.00
1.3.7 5000mm long Nos 1.00 1.00 61,500.00 61,500.00
1.3.8 5700mm long Nos 1.00 1.00 75,500.00 75,500.00
-
1.4 200mm Diameter -
1.4.1 4000 mm long Nos 2.00 2.00 89,000.00 178,000.00
1.4.2 3600 mm long Nos 1.00 1.00 89,000.00 89,000.00
1.4.3 1000 mm long Nos 1.00 1.00 50,000.00 50,000.00
1.4.4 500 mm long Nos 1.00 1.00 43,500.00 43,500.00
C/F 39,214,109.81
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the
Contract Contract
Pura Neguma - Local Government Enhancement Sector Project
MATERIAL AT SITE
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
No Item Unit Recived Qty Balance Qty Used Qty Rate Used Metrial Value
B/F 39,214,109.81
C/F 42,954,039.81
Pura Neguma - Local Government Enhancement Sector Project
MATERIAL AT SITE
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
No Item Unit Recived Qty Balance Qty Used Qty Rate Used Metrial Value
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the
Contract Contract
B/F 42,954,039.81
5.1.2 1000 mm long pipe with puddle, pudle 450 mm Nos 8.00 8.00 25,500.00 204,000.00
from flange end
1500 mm long pipe with puddle, puddle welded @
5.1.3 site Nos 1.00 1.00 30,000.00 30,000.00
5.1.4 300 mm long pipe with puddle, puddle welded @ Nos 1.00 1.00 21,000.00 21,000.00
site
5.2.3 500 mm long pipe with puddle, puddle welded @ Nos 1.00 1.00 24,500.00 24,500.00
site
5.2.4 300 mm long pipe with puddle, puddle welded @ Nos 1.00 1.00 24,500.00 24,500.00
site
5.4.2 600 mm long pipe with puddle, puddle 100 mm Nos 1.00 1.00 50,000.00 50,000.00
from plain end
5.5.2 1000 mm long pipe with puddle, puddle welded @ Nos 1.00 1.00 74,500.00 -
site
6.1.1 1000 mm long pipe with puddle, puddle 520 mm Nos 8.00 8.00 25,500.00 204,000.00
from end
C/F 44,906,639.81
Pura Neguma - Local Government Enhancement Sector Project
MATERIAL AT SITE
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
No Item Unit Recived Qty Balance Qty Used Qty Rate Used Metrial Value
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the
Contract Contract
B/F 44,906,639.81
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
No Item Unit Recived Qty Balance Qty Used Qty Rate Used Metrial Value
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the
Contract Contract
B/F 49,501,899.81
14.2 50 mm Diameter -
14.2.1 Knob Type Nos 3.00 3.00 19,900.00 59,700.00
-
14.3 100mm Diameter -
14.3.1 Knob type Nos 2.00 2.00 38,500.00 77,000.00
14.3.2 Wheel Type Nos 1.00 1.00 38,500.00 38,500.00
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
No Item Unit Recived Qty Balance Qty Used Qty Rate Used Metrial Value
C/F 53,589,999.81
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the
Contract Contract
B/F 53,589,999.81
16.2 Ventilated -
Lockable, 600mm Clear Opening Square frame D-
16.2.1 400 Nos 32.00 32.00 49,500.00 1,584,000.00
16.2.2 600 x 750 Squire Type Nos 1.00 1.00 67,500.00 67,500.00
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
No Item Unit Recived Qty Balance Qty Used Qty Rate Used Metrial Value
C/F 60,559,599.81
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the
Contract Contract
B/F 60,559,599.81
Project Name :- Construction of Water Supply Scheme For Karuwalagaswewa Pradeshiya Sabha
Claim No :- IPC 18
Period Up to :- 30th April 2022
Contract No :- NWP-AF-WS-CKD-15
Contractor :- Sanken Construction (pvt) Ltd
Date :- 30th May 2022
No Item Unit Recived Qty Balance Qty Used Qty Rate Used Metrial Value
TOTAL 61,832,919.81
80% Claim Amount 49,466,335.85
Prepared Checked as per the Contract Checked & Recommanded as per the Checked & Certified as per the
Contract Contract