Kindly find here with 1st RA Bill for Rs.89,41,249.00,along with detailed of the above work for
further necessary action for your end please.
Thank You
Encl: As Stated above
For on behalf of Dee Kay Buildcon Pvt.Ltd.
(Project Manager)
SUMMARY OF COST
Vendor : Dee Kay Buildcon Pvt Ltd
Regd.
SCO.147, Om Shubham Tower, NIT Fbd (Haryana)-121001
Address :
GST No. : 06AACCD6742K1ZJ
Client Roseview Promoters Pvt Ltd Bill No. :- 2nd Ra Bill Date:- 09/02/2023
Invoice no:- DKBP/Roseview/2023 /001
Work Warehouse Shed-3, IMT Manesar,Gurgaon
W.O No. :-
(HR)
Received By:
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. Abstract Shed-3
1.1.1 Ordinary Soil & Rock Cum 119.00 2,538.90 2,538.90 - 302,129.00 100% 302,129 -
1.1.2 Hard Rock Cum 1,200.00 - - - -
- - - -
Supplying & Filling of good earth purchased from out side
or adjacent plots in plinths, back of retaining walls,
foundations, under floors and trenches and spreading the
remaining soil for specified location as directed by the
Project Manager and shall be done in layers, not exceeding
20cm in depth and consolidating each deposited layer by
mechanical means, ramming and watering till 95%
1.2 compaction is achieved or as per specifications including Cum 348.00 14,607.96 14,607.96 - 2,541,785.00 85% 4,321,035 1,779,250
re-excavation, transportation, loading, unloading, carriage
to dumping spot and all incidentals at all depth, levels,
leads and lifts complete.
(Net consolidated fill volume will be computed from the
initial and final levels and excluding surplus earth of
excavation)
- - - -
3 of 38
Client Rep. PMC Rep.
Cont. Rep.
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. Abstract Shed-3
4 of 38
Client Rep. PMC Rep.
Cont. Rep.
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. Abstract Shed-3
- - - -
3.00 REINFORCED CONCRETE - - - -
5 of 38
Client Rep. PMC Rep.
Cont. Rep.
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. Abstract Shed-3
- - - -
6 of 38
Client Rep. PMC Rep.
Cont. Rep.
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. Abstract Shed-3
3.2.1 Footing, Raft, Stitching slab, pedestals,pile caps, etc., Sqm 380.00 - - - -
3.2.2 Columns of any size & Shear Walls Sqm 448.00 - - - -
Suspended floors, roofs, landings balconies, access
platform, Lintels, beams, plinth beams, girders,
3.2.3 bressumers, Stairs, cantilevers (excluding landing) except Sqm 473.00 - - - -
spiral staircases.etc
- - - -
Providing and laying reinforcements high yield strength
ribbed TMT steel of various diameters grade FE 500
conforming to IS code 1786 for reinforced concrete work
3.3 including cutting, bending, binding with annealed 18G MS MT 76,100.00 - - - -
binding wire, placing in position according to drawings.
(Rate shall include cost of binding wire, cover blocks, etc)
(Basic Rate of Steel Rs. 64/- per Kg)
Same as above but only Laying & Fixing of tor Steel i/c
3.3.1 MT 15,000.00 - - - -
18G binding wire
- - - -
7 of 38
Client Rep. PMC Rep.
Cont. Rep.
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. Abstract Shed-3
- - - -
- - -
Grand Total Amount 2,843,914 4,623,164 1,779,250
8 of 38
Client Rep. PMC Rep.
Cont. Rep.
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. Abstract Boundary & Road
- - -
3.00 REINFORCED CONCRETE - - -
Project: Boundary & Road IMT Manesar,Gurgaon (HR) Date of Bill : 2/9/2023
Bill No. 1st R.A. Bill
BOQ Billed Quantity Billed Amount
S. No. DESCRIPTION UNIT RATE Upto Upto % Payable
Quantity Amount Cumulative This Bill Cumulative This Bill
Previous Previous Cumulative
A B C=A*B D E=Link to MB F=E-D G H I=A*E*H J=I-G
3.1 Providing & laying in position machine batched, machine
mixed and machine vibrated design mix concrete of M25
grade with 20mm down gauge coarse aggregates
excluding cost of centering, shuttering, staging and steel
reinforcement but including cost of surface preparation
before concreting, making shear keys and provision of
construction / control joints in various locations.
Construction joints shall be minimum in numbers and their
location shall be approved by the Structural Consultant and
Architect. Such joints shall be properly treated with bonding
coat of approved material applied at the old concrete
before commencing fresh concrete.Rates
includes ,vibrating, consolidated ,finished and curing,
including preparing surface to receive plaster. The rates of - - -
concrete to include the cost of admixtures /
plasticisers/superplasticers/ bonding agent to achieve
specified strength and to facilitate pumpable concrete etc
complete for all height/ level,lead & lift. The concrete
contain flyash as per acceptable norms, subjected to
maximum 25% of cement content.Checking from Client
should not be considered as final and any defects arising
during or after casting should be borne & bear by
contractor at his own cost.
Project: Boundary & Road IMT Manesar,Gurgaon (HR) Date of Bill : 2/9/2023
Bill No. 1st R.A. Bill
BOQ Billed Quantity Billed Amount
S. No. DESCRIPTION UNIT RATE Upto Upto % Payable
Quantity Amount Cumulative This Bill Cumulative This Bill
Previous Previous Cumulative
A B C=A*B D E=Link to MB F=E-D G H I=A*E*H J=I-G
3.2 Providing, erecting, fixing in position and striking ply wood
shuttering & centering for form work in plane / slopes at all
levels, heights & locations for all shapes including strutting,
proping, chamfers, splays, keys, wedges, props, bracings,
bolting, brackets, cuttings holes for pipes and removal of
the same etc.,complete. allow for forming grooves, drops,
throats, arrises, chamfers, cutouts, openings, G.I sleeves
etc. wherever called for. Providing and applying approved
form oil on all surfaces of form work coming in contact with
concrete including close hacking of all exposed concrete
work after removal of form work all materials, fixing nosing
angles, switch boxes, labour etc. complete as per - - -
specifications, drawings and as directed.(Area of form work
in contact with concrete shall only be measured for
payment & stop boards for construction joints will not be
measured for payment).Unexposed concrete surface
subsequently left untreated (in the condition obtained on
removal of form work) shall not constitute exposed
concrete work and shall be measured under this item only.
3.2.1 Footing, raft, pedestals, pile caps, etc. Sqm 378 - 100% - -
3.2.2 Columns of any size, Shear Walls, Rfetaining Walls &
Sqm 448 - - -
Coping etc.
- - -
3.3 Providing and laying reinforcements high yield strength
ribbed TMT steel of various diameters grade FE 500
conforming to IS code 1786 for reinforced concrete work
including cutting, bending, binding with annealed 18G MS MT RO -
binding wire, placing in position according to drawings.
(Rate shall include cost of binding wire, cover blocks, etc),
(Basic Rate of Steel Rs. 64/- per Kg)
- - -
4.00 Masonary Work & Finishes - - -
(Quoted Rates are for all heights, all depths, all levels,
including (mumty) & all leads and lifts, including racking - 100% - -
curved or circular masonry work,
Brick Work - - -
Project: Boundary & Road IMT Manesar,Gurgaon (HR) Date of Bill : 2/9/2023
Bill No. 1st R.A. Bill
BOQ Billed Quantity Billed Amount
S. No. DESCRIPTION UNIT RATE Upto Upto % Payable
Quantity Amount Cumulative This Bill Cumulative This Bill
Previous Previous Cumulative
A B C=A*B D E=Link to MB F=E-D G H I=A*E*H J=I-G
4.1 Providing and constructing brick masonry of thickness 230
mm or more in foundation / super structure for any shapes
using selected quality burnt clay FPS bricks of class
designation 75 laid in cement mortar 1:6 (1 cement :6
coarse sand) mix, joints finished, flush/ raked to 6mm - - -
depth including scaffolding, curing complete as per
specification and drawing or as directed by Project
Manager.
- - -
4.4 Providing and applying two or more coats of cement based
paint on external wall surfaces over a coat of primer
including surface preparation scaffolding etc complete and Sqm 80 - 100% - -
final surface finished as per requirement of Architect and
Project Manager
- - -
5.00 Miscellaneous Work - - -
5.1 Providing & Fixing 75mm Dia PVC Pipe of 6 Kgf/cm2 as a
Weep Hole in RCC Wall all Inclusive as per instruction of Rmt 174 - 100% - -
Engineer in Charge
- - -
5.2 Providing & Fixing 50mm thick Thermacol sheet as
shuttering in between column, Shear Wall & Footing of
expansion joint all as per drawing and as per instruction of Sqm 249 - - -
Engineer in charge
- - -
TOTAL FOR BOUNDARY WALL - - -
Project: Boundary & Road IMT Manesar,Gurgaon (HR) Date of Bill : 2/9/2023
Bill No. 1st R.A. Bill
BOQ Billed Quantity Billed Amount
S. No. DESCRIPTION UNIT RATE Upto Upto % Payable
Quantity Amount Cumulative This Bill Cumulative This Bill
Previous Previous Cumulative
A B C=A*B D E=Link to MB F=E-D G H I=A*E*H J=I-G
- - -
B) ROAD WORK - - -
1.00 EARTH WORK - - -
1.1 Earth work in excavation for roads, pavements, yards,
platforms including cleaning of the surface by uprooting of Cum 120 1,191.32 1,191.32 - 142,958.00 100% 142,958 -
shrubs etc.
- - - -
1.2 Supplying & Filling of good earth purchased from out side
or adjacent plots in plinths, back of retaining walls,
foundations, under floors and trenches and spreading the
remaining soil for specified location as directed by the
Project Manager and shall be done in layers, not exceeding
20cm in depth and consolidating each deposited layer by
mechanical means, ramming and watering till 95%
compaction is achieved or as per specifications including Cum 348 11,262.94 11,262.94 - 1,959,752.00 85% 3,331,578 1,371,826
re-excavation, transportation, loading, unloading, carriage
to dumping spot and all incidentals at all depth, levels,
leads and lifts complete.
(Net consolidated fill volume will be computed from the
initial and final levels and excluding surplus earth of
excavation)
- - - -
1.3 Preparation and consolidation of sub grade with power
road roller of 8 to 12 tonne capacity, dressing to camber
and consolidating with road roller including making good
the undulations etc. and re-rolling the sub grade and Sqm 20 2,426.16 2,426.16 - 48,523.00 100% 48,523 -
disposal of surplus earth within lead upto 50 metres.
- - - -
2.00 SUB BASE WORK - - - -
- - - -
Project: Boundary & Road IMT Manesar,Gurgaon (HR) Date of Bill : 2/9/2023
Bill No. 1st R.A. Bill
BOQ Billed Quantity Billed Amount
S. No. DESCRIPTION UNIT RATE Upto Upto % Payable
Quantity Amount Cumulative This Bill Cumulative This Bill
Previous Previous Cumulative
A B C=A*B D E=Link to MB F=E-D G H I=A*E*H J=I-G
2.1 Providing & Laying granular sub-base by providing close
graded Material conforming to specifications, mixing in a
mechanical mix plant at OMC, carriage of mixed material
by tippers to work site, for all leads & lifts, spreading in
uniform layers of specified thickness with motor grader on
prepared surface and compacting with vibratory power
roller to achieve the desired density, complete as per - - - -
specifications and directions of Engineer-in-Charge.
a) 200 mm thick as sub base Cum 1,592.00 399.79 399.79 - 636,466.00 100% 636,466 -
b) 75 mm thick as wearing course over sub base Cum 1,665.00
- - - -
3.00 PLAIN & REINFORCED CEMENT CONCRETE WORK - - - -
- - - -
3.1 Providing & Laying in position cement concrete of specified
grade including the cost of centring and shuttering. - - - -
- - - -
3.4 Providing and laying reinforcements high yield strength
ribbed TMT steel of various diameters grade FE 500
conforming to IS code 1786 for reinforced concrete work
including cutting, bending, binding with annealed 18G MS MT 76100 - - - -
binding wire, placing in position according to drawings.
(Rate shall include cost of binding wire, cover blocks, etc)
(Basic Rate of Steel Rs. 64/- per Kg)
- - - -
Project: Boundary & Road IMT Manesar,Gurgaon (HR) Date of Bill : 2/9/2023
Bill No. 1st R.A. Bill
BOQ Billed Quantity Billed Amount
S. No. DESCRIPTION UNIT RATE Upto Upto % Payable
Quantity Amount Cumulative This Bill Cumulative This Bill
Previous Previous Cumulative
A B C=A*B D E=Link to MB F=E-D G H I=A*E*H J=I-G
3.5 Providing, laying, jointing and testing socketed and
spigotted RCC pipes (NP2 Class) conforming to IS:458
jointed with rubber rings & laid to correct levels below
ground in trenches upto required depth including
excavation in all kind of soil (hard rock) dewatering, - - - -
refilling, watering, ramming and removing the surplus
excavated material and making good the same complete
as required.
- - - -
4.2 Providing & laying non metallic monolithic surface
hardening compound NITOFLOR HARD TOP of Fosroc or
equivalent over RCC/PCC floors as per manufacturer's
specifications. Abrasion resistance shall conform to IS- Sqm 45.00 - - - -
1237-1980 & compressive strength of 60N/Sq.mm when
tested as per IS-516-1959 (3 kg/sqm)
- - - -
4.3 Cutting of grooves in vacuum dewatered road at
construction joints and as per required location as per
instruction of engineer in charge - Groove size 8mm wide x Rmt 60 - - - -
15 mm deep
- - - -
4.4 Providing and filling of road expansion joint with (Colpor-
200 of M/s. Fosroc with backer rod 10mm dia) or equivalent Rmt 60 - - - -
- Groove size 8mm wide x 15 mm deep
Project: Boundary & Road IMT Manesar,Gurgaon (HR) Date of Bill : 2/9/2023
Bill No. 1st R.A. Bill
BOQ Billed Quantity Billed Amount
S. No. DESCRIPTION UNIT RATE Upto Upto % Payable
Quantity Amount Cumulative This Bill Cumulative This Bill
Previous Previous Cumulative
A B C=A*B D E=Link to MB F=E-D G H I=A*E*H J=I-G
- - - -
4.5 Providing & Applying 2 or more coats of Apex Paint for
Sqm 209
Kerb stone as per approved Sample
- - -
Grand Total Amount 3,994,684 7,835,707 3,841,023
17 of 38
Client Rep. Cont.Rep Pmc Rep.
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. M.B Schedule Shed-3
2.2 Providing and laying Damp Proof Course 40mm thick with
cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded
stone aggregate 20mm nominal size) including mixing of
water proofing compound @ 2% of cement content and Sqm
providing and applying two layers of bitumen of grade
80/100 and as directed by the Project Manager.
18 of 38
Client Rep. Cont.Rep Pmc Rep.
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. M.B Boundary & Road
B) ROAD WORK
1.00 EARTH WORK
1.1 Earth work in excavation for roads, pavements, yards,
platforms including cleaning of the surface by uprooting of
shrubs etc.
earth excavation at Road at Shed-2, (front & Back side) Cum 1 1 50.540 10.712 0.566 306.42
at curve Cum 1 0.5 6.300 5.200 0.566 9.27
Cum 1 1 39.800 9.800 0.566 220.76
at taper junction Cum 1 1 22.000 13.750 0.566 171.22
Cum 1 1 86.000 9.450 0.566 459.99
end taper Cum 1 0.5 9.500 8.800 0.566 23.66
1.2 Supplying & Filling of good earth purchased from out side
or adjacent plots in plinths, back of retaining walls,
foundations, under floors and trenches and spreading the
remaining soil for specified location as directed by the
Project Manager and shall be done in layers, not exceeding
20cm in depth and consolidating each deposited layer by
mechanical means, ramming and watering till 95%
compaction is achieved or as per specifications including Cum
re-excavation, transportation, loading, unloading, carriage
to dumping spot and all incidentals at all depth, levels,
leads and lifts complete.
(Net consolidated fill volume will be computed from the
initial and final levels and excluding surplus earth of
excavation)
Sub grade at Road at Shed-2, (front & Back side) Sqm 1 1 80.540 10.712 862.74
at curve Sqm 1 0.5 6.300 5.200 16.38
Sqm 1 1 39.800 9.800 390.04
at taper junction Sqm 1 1 22.000 13.750 302.50
Sqm 1 1 86.000 9.450 812.70
end taper Sqm 1 0.5 9.500 8.800 41.80
19 of 38
Client Rep. Cont.Rep Pmc Rep.
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. M.B Boundary & Road
3.2 Providing & Laying M-30 grade RCC for trimix road work,
as per desire thick and panel sizes all as per drawing and
icluding cleaning & preparation of surface all as per Cum
instruction of engineer in charge
20 of 38
Client Rep. Cont.Rep Pmc Rep.
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. M.B Boundary & Road
2.2 Providing and laying Damp Proof Course 40mm thick with
cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded
stone aggregate 20mm nominal size) including mixing of
water proofing compound @ 2% of cement content and Sqm
providing and applying two layers of bitumen of grade
80/100 and as directed by the Project Manager.
21 of 38
Client Rep. Cont.Rep Pmc Rep.
815425344.xlsx SKY DREAM PROJECTS PVT LTD BBS
Main Bar @200C/C 10770 10770 0 10770 21 19 399 8 4297.230 --- --- --- --- ---
Dis. Bar @200C/C 4000 4000 0 4000 55 19 1045 8 4180.000 --- --- --- --- ---
Main Bar @200C/C 10770 10770 0 10770 22 1 22.25 8 239.633 --- --- --- --- ---
Dis. Bar @200C/C 4250 4250 0 4250 55 1 55 8 233.750 --- --- --- --- ---
Panel (6300x5200) at
6300 5200 1
Curve
Main Bar @200C/C 5200 5200 0 5200 33 0.5 16.5 8 85.800 --- --- --- --- ---
Dis. Bar @200C/C 6300 6300 0 6300 27 0.5 13.5 8 85.050 --- --- --- --- ---
Main Bar @200C/C 9980 0 9980 28 9 251.997 8 2514.930 --- --- --- --- ---
Main Bar @200C/C 9980 9980 0 9980 28 9 251.997 8 2514.930 --- --- --- --- ---
Dis. Bar @200C/C 4000 4000 0 4000 68 9 612 8 2448.000 --- --- --- --- ---
Lvl. Sheet
(Road) Back side & Left side Road
BS at Road 1.49
Road Thk. 0.45
Total Required RL 1.94
Average 1.3735 A
Required RL 1.94 B
Total Excavtion Ht. 0.5665 (C=B-A)
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. Lvl. Sheet Shed-3
Total RL 365200
Total no. of Reading 100
Average RL 3652
25 of 38
Client Rep. PMC Rep.
Con. Rep.
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. Lvl. Sheet Shed-3
26 of 38
Client Rep. PMC Rep.
Con. Rep.
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. Lvl. Sheet Shed-3
27 of 38
Client Rep. PMC Rep.
Con. Rep.
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. Lvl. Sheet Shed-3
28 of 38
Client Rep. PMC Rep.
Con. Rep.
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. Lvl. Sheet Shed-3
29 of 38
Client Rep. PMC Rep.
Con. Rep.
BASIC RATE DIFFERENCE AMOUNT
PROJECT :- Roseview Shade-3, IMT, Manesar
CLIENT :- Roseview Promoters Pvt Ltd. BILL NO :- 1st RA Bill
CONTRACTOR :- Dee Kay Buildcon Pvt. Ltd.
Billed Quantity /
Average Rate
Sr. No. Material Basic Rate Theoretical Difference Amount Remark
Purchase Rate Difference
Consumption
1 Cement 273.44 270 3.44 0.00 -
2 Reinforcement Steel 57.01 64 -6.99 0.000 -
3 Structural Steel 65
4 RMC - M25 4500 0.00 -
5 RMC - M30 4700 0.00 -
Total Amount for Basic Rate Difference -
Add Allowance @5% for T&P Water & Electricity -
Total Amount Payable, Recoverable (-) for Basic Rate Difference -
REINFORCEMENT SUMMARY
PROJECT :-Shed-3, IMT, Manesar BILL NO :- 1st RA Bill
CLIENT :- Roseview Promoters Pvt Ltd.
CONTRACTOR :- Dee Kay Buildcon Pvt. Ltd.
Sr. No. Description 8mm 10mm 12mm 16mm 20mm 25mm Total (Mt.) Remarks
A Shed area
Total Billed Quantity 0.000 0.000 0.000 0.000 0.000 0.000 0.000 MT
RECONCILIATION STATEMENT OF MATERIAL
PROJECT :- Shed-3, IMT, Manesar
CLIENT :- Roseview Promoters Pvt Ltd. BILL NO :- 1st RA Bill
CONTRACTOR :- Dee Kay Buildcon Pvt. Ltd.
Tor Steel
Sl.No. Description Total Unit Remarks
8mm 10mm 12mm 16mm 20mm 25mm
A) REINFORCEMENT
B) CEMENT
RMC
Sl.No. Description Unit Remarks
M-7.5 M-10 M-25 M-30
C) RMC
1 2/25/2023 HR55AG 6493 True RMC India 05833 RMC M-30 Cum 7.00 32900 4,700.00
2 2/25/2023 HR55AG 2235 True RMC India 05834 RMC M-30 Cum 7.00 32900 4,700.00
3 2/25/2023 HR55AG 8273 True RMC India 05835 RMC M-30 CUM 7.00 32900 4,700.00
4 2/25/2023 HR55AC 6137 True RMC India 05838 RMC M-30 Cum 7.00 32900 4,700.00
5 2/26/2023 HR55AG 8273 True RMC India 05847 RMC M-30 CUM 7.00 32900 4,700.00
6 2/26/2023 HR55AG 6493 True RMC India 05848 RMC M-30 CUM 7.00 32900 4,700.00
7 2/26/2023 HR55AG 2235 True RMC India 05851 RMC M-30 CUM 5.00 23500 4,700.00
8 2/26/2023 HR55AF 0943 True RMC India 05853 RMC M-30 CUM 3.00 14100 4,700.00
9 2/28/2023 HR55AG 2235 True RMC India 05894 RMC M-30 CUM 7.00 32900 4,700.00
10 2/28/2023 HR55AG 3616 True RMC India 05895 RMC M-30 CUM 7.00 32900 4,700.00
11 2/28/2023 HR55AF 3954 True RMC India 05897 RMC M-30 CUM 4.50 21150 4,700.00
12 2/28/2023 HR55AE 1629 True RMC India 05893 RMC M-30 CUM 7.00 32900 4,700.00
13 3/1/2023 HR55AG 9298 True RMC India 05933 RMC M-30 CUM 7.00 32900 4,700.00
14 3/1/2023 HR55AG 6493 True RMC India 05936 RMC M-30 Cum 7.00 32900 4,700.00
15 3/1/2023 HR55AF 3954 True RMC India 05938 RMC M-30 CUM 7.00 32900 4,700.00
16 3/1/2023 HR55AG 3616 True RMC India 05940 RMC M-30 CUM 4.00 18800 4,700.00
17 3/3/2023 HR55AY 6469 True RMC India 06014 RMC M-30 CUM 7.00 32900 4,700.00
18 3/3/2023 HR55AF 0321 True RMC India 06022 RMC M-30 CUM 7.00 32900 4,700.00
19 3/3/2023 HR55AG 2235 True RMC India 06025 RMC M-30 CUM 7.50 35250 4,700.00
20 3/4/2023 HR55AC 6137 True RMC India 06048 RMC M-30 CUM 7.00 32900 4,700.00
21 3/4/2023 HR55AE 6657 True RMC India 06049 RMC M-30 CUM 7.00 32900 4,700.00
22 3/4/2023 HR55AH 6469 True RMC India 06055 RMC M-30 CUM 6.00 28200 4,700.00
23 3/4/2023 HR55AG 6495 True RMC India 06056 RMC M-30 CUM 5.50 25850 4,700.00
24 3/10/2023 A/F True RMC India 06121 RMC M-30 CUM 7.00 32900 4,700.00
25 3/10/2023 HR55AH 6469 True RMC India 06123 RMC M-30 CUM 7.00 32900 4,700.00
26 3/10/2023 HR55AE 1629 True RMC India 06124 RMC M-30 CUM 4.50 21150 4,700.00
27 3/11/2023 HR55AA5159 True RMC India 06131 RMC M-30 CUM 7.00 32900 4,700.00
28 3/11/2023 HR55AC 6137 True RMC India 06132 RMC M-30 Cum 7.00 32900 4,700.00
29 3/11/2023 HR55AF0373 True RMC India 06135 RMC M-30 CUM 7.00 32900 4,700.00
30 3/12/2023 HR55AE 6657 True RMC India 06151 RMC M-30 CUM 7.00 32900 4,700.00
31 3/12/2023 HR55AG 3616 True RMC India 06154 RMC M-30 CUM 7.00 32900 4,700.00
32 3/12/2023 HR55AC 6137 True RMC India 06156 RMC M-30 CUM 7.00 32900 4,700.00
33 3/12/2023 HR55AF 3954 True RMC India 06162 RMC M-30 CUM 5.00 23500 4,700.00
34 3/12/2023 HR55AF 0373 True RMC India 06163 RMC M-30 CUM 4.00 18800 4,700.00
35 3/3/2023 HR55AF 8088 True RMC India 06017 RMC M-30 CUM 4.00 18800 4,700.00
36 3/13/2023 HR55AF 0321 True RMC India 06176 RMC M-30 CUM 7.00 32900 4,700.00
37 3/13/2023 HR55AE 6657 True RMC India 06177 RMC M-30 CUM 7.00 32900 4,700.00
38 3/13/2023 HR55AA 5159 True RMC India 06178 RMC M-30 CUM 7.00 32900 4,700.00
39 3/13/2023 HR55AF 0321 True RMC India 06180 RMC M-30 CUM 6.00 28200 4,700.00
40 3/14/2023 HR55AA 5159 True RMC India 06184 RMC M-30 CUM 6.00 28200 4,700.00
41 3/14/2023 HR55AG 8273 True RMC India 06185 RMC M-30 CUM 6.00 28200 4,700.00
42 3/14/2023 HR55AF 8088 True RMC India 06186 RMC M-30 CUM 6.00 28200 4,700.00
Page 33
RECEIVING DETAIL OF RMC
PROJECT :- Shed-3, IMT, Manesar
CLIENT :- Roseview Promoters Pvt Ltd. BILL NO :- 1st RA Bill
CONTRACTOR :- Dee Kay Buildcon Pvt. Ltd.
Quantity Amount
Invoice GRN Total Purchase
Sr. No. Bill Date Vehicle No. Agency Material UOM RMC RMC RMC RMC RMC
/ Bill No. No. Total RMC M-10 RMC M-25 RMC M-30 Amount Rate
M-7.5 M-10 M-25 M-30 M-7.5
43 3/14/2023 HR55AH 6469 True RMC India 06187 RMC M-30 cum 7.00 32900 4,700.00
44 3/14/2023 HR55AF0321 True RMC India 06198 RMC M-30 CUM 6.00 28200 4,700.00
45 3/14/2023 HR55AE 1629 True RMC India 06200 RMC M-30 CUM 6.00 28200 4,700.00
46 3/14/2023 HR55AF 3954 True RMC India 06206 RMC M-30 CUM 6.00 28200 4,700.00
47 3/14/2023 HR55AF 0321 True RMC India 06208 RMC M-30 CUM 7.00 32900 4,700.00
48 3/16/2023 HR55AF 0943 True RMC India 06225 RMC M-30 CUM 7.00 32900 4,700.00
49 3/16/2023 HR55AF 8088 True RMC India 06227 RMC M-30 CUM 7.00 32900 4,700.00
50 3/16/2023 HR55AE 1629 True RMC India 06228 RMC M-30 CUM 7.00 32900 4,700.00
51 3/16/2023 HR55AG 6493 True RMC India 06237 RMC M-30 CUM 7.00 32900 4,700.00
52 3/16/2023 HR55AG 6493 True RMC India 06252 RMC M-30 Cum 7.00 32900 4,700.00
53 3/16/2023 HR55AF 3954 True RMC India 06254 RMC M-30 CUM 6.00 28200 4,700.00
54 3/16/2023 HR55AE 1629 True RMC India 06259 RMC M-30 CUM 6.00 28200 4,700.00
55 #DIV/0!
56 #DIV/0!
57 #DIV/0!
58 #DIV/0!
59 #DIV/0!
60 #DIV/0!
61 #DIV/0!
62 #DIV/0!
63 #DIV/0!
64 #DIV/0!
65 #DIV/0!
66 #DIV/0!
67 #DIV/0!
68 #DIV/0!
69 #DIV/0!
70 #DIV/0!
71 #DIV/0!
72 #DIV/0!
73 #DIV/0!
74 #DIV/0!
75 #DIV/0!
76 #DIV/0!
77 #DIV/0!
78 #DIV/0!
79 #DIV/0!
80 #DIV/0!
81 #DIV/0!
82 #DIV/0!
83 #DIV/0!
84 #DIV/0!
85 #DIV/0!
86 #DIV/0!
Page 34
RECEIVING DETAIL OF RMC
PROJECT :- Shed-3, IMT, Manesar
CLIENT :- Roseview Promoters Pvt Ltd. BILL NO :- 1st RA Bill
CONTRACTOR :- Dee Kay Buildcon Pvt. Ltd.
Quantity Amount
Invoice GRN Total Purchase
Sr. No. Bill Date Vehicle No. Agency Material UOM RMC RMC RMC RMC RMC
/ Bill No. No. Total RMC M-10 RMC M-25 RMC M-30 Amount Rate
M-7.5 M-10 M-25 M-30 M-7.5
87 #DIV/0!
88 #DIV/0!
89 #DIV/0!
90 #DIV/0!
91 #DIV/0!
92 #DIV/0!
93 #DIV/0!
94 #DIV/0!
95 #DIV/0!
96 #DIV/0!
97 #DIV/0!
98 #DIV/0!
99 #DIV/0!
100 #DIV/0!
101 #DIV/0!
102 #DIV/0!
103 #DIV/0!
104 #DIV/0!
105 #DIV/0!
106 #DIV/0!
107 #DIV/0!
108 #DIV/0!
109 #DIV/0!
110 #DIV/0!
111 #DIV/0!
112 #DIV/0!
113 #DIV/0!
114 #DIV/0!
115 #DIV/0!
116 #DIV/0!
117 #DIV/0!
118 #DIV/0!
119 #DIV/0!
120 #DIV/0!
121 #DIV/0!
122 #DIV/0!
123 #DIV/0!
124 #DIV/0!
#DIV/0!
Up to 1st RAB Total of Quantity & Amount 345.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cumulative Grand Total of Quantity & Amount 345.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1621500.00
Average Rate of RMC #DIV/0! #DIV/0! #DIV/0!
Page 35
CEMENT CONSUMPTION STATEMENT
PROJECT :- Shed-3, IMT, Manesar BILL NO :- 1st RA Bill
CLIENT :- Roseview Promoters Pvt Ltd.
CONTRACTOR :- Dee Kay Buildcon Pvt. Ltd.
Item
Sr. No. Description UOM Total Qty. Factor Total Cement Remarks
No.
Consumed
1 0.00
0.00
2 0.00
3 0.00
4 0.00
5 0.00
6 0.00
0.00
0.00
7 0.00
NON-SCHEDULED ITEM
Page 36
815425344.xlsx Dee Kay Buildcon Pvt. Ltd. Cement Received
RECEIVING DETAIL OF CEMENT
PROJECT :- Shade-3, IMT, Manesar
CLIENT :- Roseview Promoters Pvt Ltd. BILL NO :- 1st RA Bill
CONTRACTOR :- Dee Kay Buildcon Pvt. Ltd.
Grade of Total Amount Purchase
Sr. No. Bill Date Vehicle No. Agency Invoice / Bill No. Make UOM Quantity
Cement without GST Rate
1 27-Jan-23 HR38AB9524 JK Cement Works Mangrol 7810041000067651 JK Super OPC43 Bags 837.00 228,867.19 273.44
228867.188
38 of 38
Client Rep. PMC Rep.