PROJECT: Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076
Amounts (Rs.)
S. No. Description
Total to date Up to last Invoice This Invoice
B. Gross Value of work Done REF: Annexure-A-1 294,673,163 255,451,503 39,221,660
B1 Gross Value of MPL Coordination Charges for Façade / Kitchen / Wood / 50,000,000 47,172,623 2,827,377
Doors / Air Conditioning Works REF: Annexure-A-1-1, (10 million advance and
balance 40 million in monthly installments)
i Mob. Advance Recovery @25% of B i.e Rs. 294,673,163 (83,012,765) (73,207,350) (9,805,415)
ii Retention Money @5% of D i.e Rs. 350,330,877 (17,516,544) (15,302,405) (2,214,139)
Cost Difference between Basic Price (as per contract) and Purchase 8,115,331 5,974,188 2,141,143
F.
Price as per attached details. REF: Annexure-A-3
TOTAL ADDITION F= 8,115,331 5,974,188 2,141,143
H.ii By adding withholding tax @ 6.5% (on amount of FBR Sales Tax - - -
on Services ) (H.i/0.935-H.i)
J Gross Value of MPL Coordination and facilitation Charges 15% of 8,166,325 8,166,325 0
deleted items for direct order by Owner @ 20% of A2)
K. AMOUNT PAYABLE K=(I + J) 289,257,974 249,688,173 39,569,801
J Adhoc Payments Received Against IPCs excluding Income Tax (170,700,878) (170,700,878) -
K Misc Deductions (Electricity etc.) (6,367,368) (6,367,368) -
L Misc Deductions (Insurance )
M NET AMOUNT PAYABLE M=(I-J-K) 93,534,693 56,536,929 36,997,764
PROJECT: Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076
Amounts (Rs.)
S. No. Description
Total to date Up to last Invoice This Invoice
i Mob. Advance Recovery @25% of B i.e Rs. 294,673,163 (73,668,291) (35,307,350) (38,360,941)
ii Retention Money @5% of D i.e Rs. 344,673,163 (17,233,658) (9,065,580) (8,168,079)
Cost Difference between Basic Price (as per contract) and Purchase
F. 8,115,331 1,733,814 6,381,517
Price as per attached details. REF: Annexure-A-3
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Submission Date: March 10, 2023
Markaz, Islamabad (Architectural Works) MPL-076
Contractor: Mughals Pakistan (Pvt.) Limited Invoice # : 14
Engineer: Arshad Shahid Abdullah ((Pvt) Ltd Karachi. Invoice Period: From 14-02-2023 to 31-
03-2023
Amounts
Sr. Description of Works Remarks
#
To date Previous Invoice Current Invoice
Withholding tax on FBR Sales Tax on Services amount is either not to be deducted or should be
added on FBR Sales Tax on Services amount. MPL submits FBR Sales Tax on Services (invoice) of
amount mentioned in IPC & same should be re-imbursed to MPL.
Page 4 of 54
.Mughals Pakistan (Pvt.) Ltd
CONSTRUCTION PROFESSIONALS
Annexure-A-1-1
From 14-02-2023 to
EngineerArshad Shahid Abdullah ((Pvt) Ltd Karachi. Billing Period: 31-03-2023
Amount
Sr # Invoice No. Billing Days Rate/Day This Bill To Date Remarks
Let. Ref:
1 Invoice No. 01 56.00 109,589 6,136,984.00 6,136,984 SCV/PD/02/2020726
Engineer: Arshad Shahid Abdullah ((Pvt) Ltd Karachi. Billing Period: From 14-02-2023 to 31-03-2023
2 7 Division No. 7 : Thermal and Moisture Protection 1,119,300 1,022,694 19,095 1,041,789
10 9.7 Division No. 9.7 : Finishes - Miscellaneous 4,226,810 1,576,711 27,108 1,603,819
A SUPER STRUCTURE
2 7 Division No. 7 : Thermal and Moisture Protection 48,204,085 5,178,677 948,776 6,127,453
5 9.2 Division No. 9.2 : Finishes - Flooring 158,860,593 64,736,260 11,043,606 75,779,867
Division No. 9.3 : Finishes - Skirting, Dado &
6 9.3 External Cladding 108,019,775 37,936,793 2,945,525 40,882,318
Division No. 9.4 : Finishes - Stair, Steps and
7 9.4 Landings 11,428,320 3,000,000 1,217,051 4,217,051
8 9.5 Division No. 9.5 : Finishes - Paint Work 107,230,075 57,559,462 5,069,447 62,628,910
Division No. 9.6 : Finishes - Suspended Ceiling
9 9.6 Work -
Concrete Work of Additional Structre like Guard
Room, IESCO Room , Service Room External
Ramp,Planters , Sump Pits, Sky Light Walls ,
Ventilation & Intake Duct are Being Claim in this
Item , Boundary Wall And Other Items = De-
scoped.
10 9.7 Division No. 9.7 : Finishes - Miscellaneous 12,000,301 18,059,553 9,991,977 28,051,530
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
A).BASEMENTS
Division No. 7 : Thermal and Moisture Protection (Basements)
a,b,c,d,e,f) Under Ground Water Tank Internal Surface & Walls SM 1,150 780 897,000 1,311.146 24.481 1,335.627 1,022,694 19,095 1,041,789 100%
Plaster Under Ground Water Tank, Sump Pits, Water channels, Planters
a)
Toilet, etc.
i) Flooring in Slope minimum 40mm thick SM 625 1,079 674,375 303.010 - 303.010 326,948 (0) 326,948 100%
ii) Plaster on Walls 20mm thick SM 675 980 661,500 432.035 - 432.035 423,394 0 423,394
Sub Base;
9.2.1 CM 175 9,302 1,627,850 32.976 - 32.976 306,743 - 306,743
iv) 1:3:6 Sub Floor / Screed
Sub Base;
9.2.1 CM 6 25,497 152,982 2.829 1.941 4.770 72,131 49,490 121,621
v) 1:3:6 Base Pads
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
Concrete Flooring.
1:2:4 cement concrete floor smooth finished (by Hand Held Power
Trowel Machine / Helicopter Machine- for Parking Areas & Driveways)
laid in alternate panels of approximately 15 SM Area including
construction joint (with waterproof cement concrete grout),
9.2.2
expansion/control joint (with polystyrene & sealant), curing, hacking of
existing surface for bonding where necessary, etc. complete in all
respect.
Refer To Drawings - AD-171
i) Basement - 3 SM 7,350 2,171 15,956,850 7,820.940 346.104 8,167.044 16,130,298 1,423,048 17,553,346 99%
ii) Basement - 2 SM 7,800 2,171 16,933,800 7,717.598 38.518 7,756.116 16,754,905 83,623 16,838,528 100%
iii) Basement - 1 SM 7,380 2,171 16,021,980 7,932.945 9.360 7,942.305 15,844,630 1,053,259 16,897,889 98%
iii) Basement - 1 SM 475 2,017 958,075 253.820 239.020 492.840 511,955 482,103 994,058
ii) Basement - 2 SM 90 1,935 174,150 29.180 - 29.180 29,361 (0) 29,361 52%
i) Basement - 3 SM 100 1,951 195,100 250.000 29.200 279.200 253,630 29,624 283,254 52%
ii) Basement - 2 SM 100 1,951 195,100 300.380 - 300.380 304,742 (0) 304,742 52%
iii) Basement - 1 SM 100 1,951 195,100 249.330 - 249.330 252,950 0 252,950 52%
Porcelain Tiles flooring for Drivers waiting, Stores, QTR, Security Room
9.2.9
etc
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
ii) Basement - 2 SM 90 1,951 175,590 153.520 48.350 201.870 263,575 90,889 354,464 90%
iii) Basement - 1 SM 230 1,951 448,730 150.540 7.660 158.200 176,222 24,399 200,621 65%
Concrete Skirting.
Same as Item # 9.3.1 above but with 150mm x 150mm high cement
concrete coved skirting in Parking & Driveways Areas and also including
9.3.2
polystyrene & sealant, etc. complete in all respect.
Refer to Drg. # AD-001
i) Basement - 3 RM 650 635 412,750 347.250 - 347.250 220,504 (0) 220,504 100%
ii) Basement - 2 RM 650 635 412,750 347.250 - 347.250 220,504 (0) 220,504 100%
iii) Basement - 1 RM 650 635 412,750 347.250 - 347.250 220,504 (0) 220,504 100%
i) Basement-3 to Ground Floor SM 60 10,440 626,400 21.546 75.163 96.709 224,940 784,702 1,009,642 100%
i) Basement - 3 SM 7,925 505 4,002,125 6,574.500 730.500 7,305.000 1,660,061 1,660,062 3,320,123 90%
ii) Basement - 2 SM 10,160 505 5,130,800 8,866.800 8,866.800 3,582,187 671,660 4,253,847 95%
iii) Basement - 1 SM 7,755 505 3,916,275 8,116.411 8,116.411 1,844,454 614,818 2,459,273 60%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
i) Basement - 3 SM 525 770 404,250 952.514 490.668 1,443.182 220,031 780,094 1,000,125 90%
ii) Basement - 2 SM 610 770 469,700 1,650.047 - 1,650.047 1,016,429 190,580 1,207,009 95%
iii) Basement - 1 SM 1,300 770 1,001,000 1,605.338 1,605.338 494,444 - 494,444 40%
ii) Basement - 2 SM 3,460 893 3,089,780 1,219.315 1,219.315 871,079 (0) 871,079 80%
iii) Basement - 1 SM 5,680 893 5,072,240 1,219.320 1,219.320 435,541 - 435,541 40%
125mm x 200mm, 3000 psi cube strength precast concrete kerb stone
for footpath with 1:4 cement sand mortar base including grouting,
curing, paint finished with Hi-gloss enamel paint of approved shade,
9.7.4ii RM 1,000 1,105 1,105,000 1,199.930 17.700 1,217.630 1,325,923 19,558 1,345,481 100%
etc. complete in all respect.
Refer To Drawings - AD-010
450mm x 90mm, 3000 psi cube strength precast concrete kerb stone
for Lift Lobby with 1:4 cement sand mortar base including grouting,
curing, paint finished with Hi-gloss enamel paint of approved shade,
9.7.4iii RM 1,000 957 957,000 262.056 7.890 269.946 250,788 7,550 258,338 100%
etc. complete in all respect.
Refer To Drawings - AD-130 to AD-138
Grating.
Hot Dip Galvanized M.S. Grating (inclusive of angles) fabricated from
5.2 approved M.S. sections including fixing arrangement, sealing the edges, KG 400 650 260,000 1,857.110 - 1,857.110 1,207,122 (1) 1,207,122 100%
etc. complete in all respect.
Refer To Drawings - AD-051a
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
a) Overhead Water Tank (Internal Surface-Base & Wall) SM 275 780 214,500
d) Toilet (Floor & Walls as required). SM 5,200 780 4,056,000 5,241.608 - 5,241.608 4,088,454 0 4,088,454 100%
e) Ground Floor, Part of External Development Areas SM 3,500 780 2,730,000 14.054 - 14.054 10,962 0 10,962
Roof Treatment.
Type-A (Roof Level Open Tarrace)
Refer To Drawings - AD-350 SM 230 9,042 2,079,660 - - - - - 20%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
1:3:6 C.C. sub floor / screed / fill including curing, etc. complete in all
respect.
iv) Refer To Drawings - A-510, A-511, A-512, A-513, AD-292, AD-293, AD- CM 470 9,302 4,371,940 146.690 (99.758) 46.932 1,364,510 (927,949) 436,561
600, AD-603, AD-605, AD-607, AD-608, AD-609, AD-613, AD-618, AD-
621, AD-630
1:3:6 C.C. base pad, platform, wall, up stand, steps, seats, etc including
formwork, curing, hacking of existing surface for bonding where
vii) CM 10 22,432 224,320 134.229 134.229 - 3,011,025 3,011,025
necessary, etc. complete in all respect.
Refer To Drawings - AD-051a, AD-259
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
One layer of local made jute base felt of 32 Kg. per 10 Sq. meter
including coat of primer as per manufacturer's specifications & site
conditions, bonding coat of bitumen (Hycarb Asphalt 10-20) at 1.6 Kg.
x) SM 125 617 77,125 - -
per sq.metre & final flood coat of bitumen (Hycarb Asphalt 10-20) at
2.5 Kg. per sq.metre etc. complete in all respect.
Refer To Drawings - AD-609, AD-630
ii) Pent House Level-1, Pent House Level-2, Roof - Machine Room. SM 120 1,269 152,280 - -
Granite Coping (Under Bride & Terrace Railings, Planters, Ramps etc).
Same as item # 9.2.22 above but with 20mm thick pre-finished granite
coping with 6 sides chemical treatment (Polish Finish) of approved
sample for coping & steps, etc. complete in all respect.
9.2.24 SM 750 13,012 9,759,000 - 68.840 68.840 - 895,746 895,746
Basic Price of Granite shall be Rs. 6460 Per SM. Ex-Islamabad.
Refer To Drawings - AD-330, AD-331, AD-450, AD-480, AD-490, AD-500,
AD-510, AD-540, AD-600, AD-603, AD-605, AD-607, AD-608, AD-609,
AD-613, AD-618, AD-621, AD-630
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
i) 1st Floor SM 210 1,935 406,350 278.600 - 278.600 280,327 150,945 431,273 80%
ii) 2nd Floor SM 210 1,935 406,350 278.600 - 278.600 280,327 150,945 431,273 80%
iii) 3rd Floor SM 210 1,935 406,350 278.600 - 278.600 280,327 150,945 431,273 80%
iv) 4th Floor SM 210 1,935 406,350 278.600 - 278.600 231,809 199,464 431,273 80%
v) 5th Floor SM 210 1,935 406,350 278.600 - 278.600 231,809 199,464 431,273 80%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
vi 6th Floor SM 210 1,935 406,350 278.600 - 278.600 231,809 145,555 377,364 70%
vii 7th Floor SM 210 1,935 406,350 278.600 - 278.600 280,327 97,036 377,364 70%
viii) 8th Floor SM 210 1,935 406,350 278.600 - 278.600 280,327 97,036 377,364 70%
ix) 9th Floor SM 210 1,935 406,350 278.600 278.600 280,327 150,945 431,273 80%
x) 10th Floor SM 210 1,935 406,350 278.600 278.600 280,327 150,945 431,273 80%
xi) 11th Floor SM 210 1,935 406,350 278.600 278.600 280,327 150,945 431,273 80%
xii) 12th Floor SM 210 1,935 406,350 278.600 278.600 280,327 43,127 323,455 60%
i) Ground Floor SM 700 1,847 1,292,900 659.000 659.000 1,144,143 48,687 1,192,830 98%
ii) 1st Floor SM 1,150 1,847 2,124,050 1,091.600 1,091.600 1,895,214 80,647 1,975,861 98%
iii) 2nd Floor SM 1,150 1,847 2,124,050 1,091.600 1,091.600 1,895,214 80,647 1,975,861 98%
iv) 3rd Floor SM 1,150 1,847 2,124,050 1,091.600 1,091.600 1,895,214 80,647 1,975,861 98%
v) 4th Floor SM 1,150 1,847 2,124,050 1,091.600 1,091.600 866,960 - 866,960 43%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
v) 5th Floor SM 1,150 1,847 2,124,050 1,091.600 1,091.600 866,960 - 866,960 43%
vi 6th Floor SM 1,150 1,847 2,124,050 1,091.600 1,091.600 866,960 - 866,960 43%
vii 7th Floor SM 1,150 1,847 2,124,050 1,091.600 1,091.600 1,895,214 80,647 1,975,861 98%
viii 8th Floor SM 1,150 1,847 2,124,050 1,091.600 1,091.600 1,895,214 80,647 1,975,861 98%
ix 9th Floor SM 1,150 1,847 2,124,050 1,091.600 1,091.600 1,895,214 80,647 1,975,861 98%
x 10th Floor SM 1,150 1,847 2,124,050 1,091.600 1,091.600 1,895,214 80,647 1,975,861 98%
xi 11th Floor SM 1,150 1,847 2,124,050 937.900 - 937.900 1,628,363 69,292 1,697,655 98%
xii) 12th Floor SM 1,150 1,847 2,124,050 1,052.900 - 1,052.900 1,166,824 291,706 1,458,530 75%
i) Ground Floor SM 910 1,951 1,775,410 875.600 875.600 1,605,798 68,332 1,674,130 98%
ii) 1st Floor SM 1,150 1,951 2,243,650 1,118.000 1,118.000 2,050,345 87,249 2,137,594 98%
iii) 2nd Floor SM 1,150 1,951 2,243,650 1,118.000 1,118.000 2,050,345 87,249 2,137,594 98%
iv) 3rd Floor SM 1,150 1,951 2,243,650 1,118.000 1,118.000 2,050,345 87,249 2,137,594 98%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
v) 4th Floor SM 1,150 1,951 2,243,650 1,118.000 1,118.000 937,924 - 937,924 43%
v) 5th Floor SM 1,150 1,951 2,243,650 1,118.000 1,118.000 937,924 - 937,924 43%
vi 6th Floor SM 1,150 1,951 2,243,650 1,118.000 1,118.000 937,924 - 937,924 43%
vii 7th Floor SM 1,150 1,951 2,243,650 1,118.000 1,118.000 2,050,345 87,249 2,137,594 98%
viii 8th Floor SM 1,150 1,951 2,243,650 1,118.000 1,118.000 2,050,345 87,249 2,137,594 98%
ix 9th Floor SM 1,150 1,951 2,243,650 1,118.000 - 1,118.000 2,050,345 87,249 2,137,594 98%
x 10th Floor SM 1,150 1,951 2,243,650 1,118.000 - 1,118.000 2,050,345 87,249 2,137,594 98%
xi 11th Floor SM 1,150 1,951 2,243,650 915.200 915.200 1,678,422 71,422 1,749,844 98%
xii) 12th Floor SM 1,150 1,951 2,243,650 1,071.700 1,071.700 1,254,532 313,633 1,568,165 75%
i) Ground Floor SM 225 1,951 438,975 216.094 47.77 263.864 396,303 108,200 504,503 98%
ii) 1st Floor SM 300 1,951 585,300 266.400 47.770 314.170 488,562 112,125 600,687 98%
iii) 2nd Floor SM 300 1,951 585,300 266.400 47.770 314.170 488,562 112,125 600,687 98%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
iv) 3rd Floor SM 300 1,951 585,300 266.280 47.770 314.050 488,342 112,115 600,457 98%
v) 4th Floor SM 300 1,951 585,300 266.400 266.400 223,491 - 223,491 43%
v) 5th Floor SM 300 1,951 585,300 266.400 266.400 223,491 - 223,491 43%
vi 6th Floor SM 300 1,951 585,300 266.400 266.400 223,491 - 223,491 43%
vii 7th Floor SM 300 1,951 585,300 266.400 23.890 290.290 488,562 66,467 555,029 98%
viii 8th Floor SM 300 1,951 585,300 266.400 47.770 314.170 488,562 112,125 600,687 98%
ix 9th Floor SM 300 1,951 585,300 266.400 47.770 314.170 488,562 112,125 600,687 98%
x 10th Floor SM 300 1,951 585,300 266.400 47.770 314.170 488,562 112,125 600,687 98%
xi 11th Floor SM 300 1,951 585,300 217.600 47.770 265.370 399,065 108,317 507,382 98%
xii) 12th Floor SM 300 1,951 585,300 258.400 23.890 282.290 302,483 110,578 413,061 75%
Ceramic Tile Flooring - CT5 (Calcutta White Matt 30cm x 90cm of Kale).
Ceramic tile of approved sample for flooring in slope with 1:3:6 plain cement
concrete base of required thickness so as to achieve a minimum overall finished
floor thickness of 75mm, setting the tiles with dry bond, grouting the joints with
waterproof grout of Resicheme or approved equivalent as per manufacturer's
9.2.8 specifications & instructions including cutting, curing, cleaning, hacking of
existing surface for bonding where necessary, etc. complete in all respect.
Ground Floor Common Areas - Ladies & Gents Toilet
Apartments & Pent House Level 1 & 2 - Bathrooms, Powder & Servant
Bath
Refer To Drawings - AD-250 to AD-259b
i) Ground Floor SM 200 1,951 390,200 185.500 185.500 340,196 14,476 354,672 98%
ii) 1st Floor SM 210 1,951 409,710 196.000 196.000 359,452 15,296 374,748 98%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
iii) 2nd Floor SM 210 1,951 409,710 196.000 196.000 359,452 15,296 374,748 98%
iv) 3rd Floor SM 210 1,951 409,710 196.000 196.000 359,452 15,296 374,748 98%
iv) 7th Floor SM 210 1,951 409,710 196.000 - 196.000 359,452 15,296 374,748 98%
v) 8th Floor SM 210 1,951 409,710 196.000 196.000 359,452 15,296 374,748 98%
vi) 9th Floor SM 210 1,951 409,710 196.000 - 196.000 359,452 15,296 374,748 98%
vii) 10th Floor SM 210 1,951 409,710 196.000 - 196.000 359,452 15,296 374,748 98%
viii) 11th Floor SM 210 1,951 409,710 196.000 196.000 198,846 87,951 286,797 75%
ix) 12th Floor SM 210 1,951 409,710 182.600 - 182.600 185,251 - 185,251 52%
i) Ground Floor SM 120 1,951 234,120 109.700 109.700 201,183 8,561 209,744 98%
ii) 1st Floor SM 160 1,951 312,160 149.600 149.600 274,357 11,675 286,032 98%
iii 2nd Floor SM 160 1,951 312,160 149.600 149.600 274,357 11,675 286,032 98%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
iv 3rd Floor SM 160 1,951 312,160 149.600 149.600 274,357 11,675 286,032 98%
iv 7th Floor SM 160 1,951 312,160 149.600 149.600 274,357 11,675 286,032 98%
v 8th Floor SM 160 1,951 312,160 149.600 149.600 274,357 11,675 286,032 98%
vi 9th Floor SM 160 1,951 312,160 149.600 149.600 274,357 11,675 286,032 98%
vii 10th Floor SM 160 1,951 312,160 149.600 149.600 274,357 11,675 286,032 98%
viii 11th Floor SM 160 1,951 312,160 149.600 149.600 151,772 67,130 218,902 75%
ix 12th Floor SM 160 1,951 312,160 143.200 - 143.200 145,279 - 145,279 52%
i) Ground Floor SM 370 1,951 721,870 316.900 316.900 321,501 - 321,501 52%
- - - - -
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
i) Ground Floor SM 280 1,951 546,280 300.500 54.750 355.250 304,863 249,611 554,474 80%
ii) 1st Floor SM 450 1,951 877,950 441.900 441.900 448,316 396,588 844,904 98%
iii) 2nd Floor SM 450 1,951 877,950 441.900 441.900 448,316 396,588 844,904 98%
iv) 3rd Floor SM 450 1,951 877,950 441.900 441.900 448,316 396,588 844,904 98%
v) 4th Floor SM 450 1,951 877,950 441.900 441.900 370,723 - 370,723 43%
v) 5th Floor SM 450 1,951 877,950 441.900 441.900 370,723 - 370,723 43%
vi 6th Floor SM 450 1,951 877,950 441.900 441.900 370,723 - 370,723 43%
vii 7th Floor SM 450 1,951 877,950 441.900 441.900 603,503 241,401 844,904 98%
viii 8th Floor SM 450 1,951 877,950 441.900 13.260 455.160 603,503 266,754 870,257 98%
ix 9th Floor SM 450 1,951 877,950 441.900 48.500 490.400 603,503 334,132 937,635 98%
x 10th Floor SM 450 1,951 877,950 441.900 13.260 455.160 603,503 266,754 870,257 98%
xi 11th Floor SM 450 1,951 877,950 441.900 6.630 448.530 603,503 254,077 857,580 98%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
xii) 12th Floor SM 450 1,951 877,950 441.900 - 441.900 448,316 - 448,316 52%
i) Ground Floor - Office Toilet. (T.2) SM 4 1,847 7,388 16.200 16.200 15,559 - 15,559 52%
i) Ground Floor Waiting Area SM 60 10,516 630,960 101.100 101.100 552,847 - 552,847 52%
9.2.31a 60mm thick grey pavers 6000PSI SM 1,050 1,928 2,024,400 262.880 45.850 308.730 506,833 88,398 595,231
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
i Ground Floor RM 600 273 163,800 582.900 582.900 149,584 6,365 155,949 98%
ii 1st Floor RM 600 273 163,800 887.200 887.200 227,673 9,688 237,361 98%
iii 2nd Floor RM 600 273 163,800 887.200 887.200 227,673 9,688 237,361 98%
iv 3rd Floor RM 600 273 163,800 887.200 887.200 227,673 9,688 237,361 98%
V 7th Floor RM 600 273 163,800 887.200 887.200 227,673 9,688 237,361 98%
vi 8th Floor RM 600 273 163,800 887.200 - 887.200 227,673 9,688 237,361 98%
vii 9th Floor RM 600 273 163,800 887.200 887.200 227,673 9,688 237,361 98%
viii 10th Floor RM 600 273 163,800 887.200 887.200 227,673 9,688 237,361 98%
ix 11th Floor RM 600 273 163,800 762.900 - 762.900 195,775 8,331 204,106 98%
x 12th Floor RM 600 273 163,800 875.400 - 875.400 179,238 23,898 203,137 85%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
i Ground Floor RM 800 273 218,400 793.000 793.000 203,500 8,659 212,159 98%
ii 1st Floor RM 800 273 218,400 1,059.200 1,059.200 271,812 11,566 283,378 98%
iii 2nd Floor RM 800 273 218,400 1,059.200 1,059.200 271,812 11,566 283,378 98%
iv 3rd Floor RM 800 273 218,400 1,059.200 1,059.200 271,812 11,566 283,378 98%
V 7th Floor RM 800 273 218,400 1,059.200 1,059.200 271,812 11,566 283,378 98%
vi 8th Floor RM 800 273 218,400 1,059.200 1,059.200 271,812 11,566 283,378 98%
vii 9th Floor RM 800 273 218,400 1,059.200 1,059.200 271,812 11,566 283,378 98%
viii 10th Floor RM 800 273 218,400 1,059.200 1,059.200 271,812 11,566 283,378 98%
ix 11th Floor RM 800 273 218,400 876.900 - 876.900 225,030 9,576 234,606 98%
x 12th Floor RM 800 273 218,400 1,008.400 - 1,008.400 206,470 27,529 233,999 85%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
i Ground Floor RM 280 273 76,440 164.600 331.250 495.850 42,240 90,420 132,660 98%
ii 1st Floor RM 280 273 76,440 209.600 347.620 557.220 53,788 95,291 149,079 98%
iii 2nd Floor RM 280 273 76,440 209.600 347.620 557.220 53,788 95,291 149,079 98%
iv 3rd Floor RM 280 273 76,440 209.600 347.620 557.220 53,788 95,291 149,079 98%
v 7th Floor RM 280 273 76,440 209.600 320.930 530.530 53,788 88,150 141,938 98%
vi 8th Floor RM 280 273 76,440 209.600 347.620 557.220 53,788 95,291 149,079 98%
vii 9th Floor RM 280 273 76,440 209.600 347.620 557.220 53,788 95,291 149,079 98%
viii 10th Floor RM 280 273 76,440 209.600 347.620 557.220 53,788 95,291 149,079 98%
ix 11th Floor RM 280 273 76,440 170.500 347.620 518.120 43,754 94,864 138,618 98%
x 12th Floor RM 280 273 76,440 198.400 320.930 519.330 40,622 79,889 120,511 85%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
i Ground Floor SM 115 1,947 223,905 122.520 25.490 148.010 224,234 58,178 282,412 98%
ii 1st Floor SM 115 1,947 223,905 157.560 14.360 171.920 288,363 39,671 328,034 98%
iii 2nd Floor SM 115 1,947 223,905 157.560 16.750 174.310 288,363 44,231 332,594 98%
iv 3rd Floor SM 115 1,947 223,905 157.560 13.240 170.800 288,363 37,534 325,897 98%
v 7th Floor SM 115 1,947 223,905 157.560 22.230 179.790 288,363 54,687 343,050 98%
vi 8th Floor SM 115 1,947 223,905 157.560 4.920 162.480 288,363 21,659 310,022 98%
vii 9th Floor SM 115 1,947 223,905 157.560 3.490 161.050 288,363 18,930 307,293 98%
viii 10th Floor SM 115 1,947 223,905 157.560 157.560 288,363 12,271 300,634 98%
iX 11th Floor SM 115 1,947 223,905 157.560 157.560 288,363 12,271 300,634 98%
X 12th Floor SM 115 1,947 223,905 157.560 157.560 245,415 15,338 260,754 85%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
i Ground Floor SM 1,200 1,947 2,336,400 1,489.135 1,489.135 2,725,385 115,974 2,841,359 98%
ii 1st Floor SM 1,200 1,947 2,336,400 1,420.690 1,420.690 2,600,118 110,644 2,710,762 98%
iii 2nd Floor SM 1,200 1,947 2,336,400 1,420.690 1,420.690 2,600,118 110,644 2,710,762 98%
iv 3rd Floor SM 1,200 1,947 2,336,400 1,420.690 1,420.690 2,627,779 82,983 2,710,762 98%
viii 7th Floor SM 1,200 1,947 2,336,400 1,420.693 1,420.693 2,600,124 110,643 2,710,767 98%
ix 8th Floor SM 1,200 1,947 2,336,400 1,420.690 1,420.690 2,600,118 110,644 2,710,762 98%
x 9th Floor SM 1,200 1,947 2,336,400 1,420.690 1,420.690 2,600,118 110,644 2,710,762 98%
xi 10th Floor SM 1,200 1,947 2,336,400 1,420.690 1,420.690 2,600,118 110,644 2,710,762 98%
xii 11th Floor SM 1,200 1,947 2,336,400 1,184.100 - 1,184.100 2,167,116 92,218 2,259,334 98%
xiii 12th Floor SM 1,200 1,947 2,336,400 1,415.360 - 1,415.360 2,066,779 275,571 2,342,350 85%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
i Ground Floor SM 250 1,947 486,750 264.120 264.120 483,387 20,570 503,957 98%
ii 1st Floor SM 250 1,947 486,750 266.320 266.320 487,414 20,741 508,155 98%
iii 2nd Floor SM 250 1,947 486,750 266.320 266.320 487,414 20,741 508,155 98%
iv 3rd Floor SM 250 1,947 486,750 266.320 266.320 487,414 20,741 508,155 98%
viii 7th Floor SM 250 1,947 486,750 266.320 266.320 487,414 20,741 508,155 98%
ix 8th Floor SM 250 1,947 486,750 266.320 266.320 487,414 20,741 508,155 98%
x 9th Floor SM 250 1,947 486,750 266.320 266.320 487,414 20,741 508,155 98%
xi 10th Floor SM 250 1,947 486,750 266.320 266.320 487,414 20,741 508,155 98%
x 11th Floor SM 250 1,947 486,750 221.650 - 221.650 405,659 17,262 422,921 98%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
xi 12th Floor SM 250 1,947 486,750 256.420 - 256.420 374,437 49,925 424,362 85%
i Ground Floor (Common Toilet T.2) SM 18 1,947 35,046 77.020 77.020 137,961 8,997 146,959 98%
i) Ground Floor to 12th Floor SM 200 10,524 2,104,800 - 400.708 400.708 3,000,000 1,217,051 4,217,051 100%
Vinyl Emulsion.
Vinyl Emulsion paint (Jotun / ICI / Berger) minimum three coats of approved
9.5.1 shade over a coat(s) of primer (of same brand) to Internal Plastered Surfaces
prepared smooth with carborandum stone, filling the depression with putty
including scaffolding, etc. complete in all respect.
i) Ground Floor (only 2 coats of Paint Remaining) SM 1,225 505 618,625 3,025.608 3,025.608 1,298,742 76,397 1,375,139 90%
ii) 1st Floor SM 1,500 505 757,500 3,092.642 3,092.642 1,327,517 78,089 1,405,606 90%
iii) 2nd Floor SM 1,500 505 757,500 3,092.642 3,092.642 1,327,517 78,089 1,405,606 90%
iv) 3rd Floor SM 1,500 505 757,500 3,092.642 3,092.642 1,327,517 78,089 1,405,606 90%
v) 4th Floor SM 1,500 505 757,500 882.400 - 882.400 178,245 - 178,245 40%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
vi 5th Floor SM 1,500 505 757,500 882.400 - 882.400 178,245 - 178,245 40%
viii 7th Floor (only 2 coats of Paint Remaining) SM 1,500 505 757,500 3,092.642 3,092.642 1,327,517 78,089 1,405,606 90%
ix 8th Floor SM 1,500 505 757,500 3,092.642 3,092.642 1,327,517 78,089 1,405,606 90%
x 9th Floor SM 1,500 505 757,500 3,092.642 3,092.642 1,327,517 78,089 1,405,606 90%
xi 10th Floor SM 1,500 505 757,500 3,092.642 3,092.642 1,327,517 78,089 1,405,606 90%
xii 11th Floor SM 1,500 505 757,500 3,092.642 3,092.642 1,093,249 312,357 1,405,606 90%
xii 12th Floor SM 1,500 505 757,500 3,092.642 3,092.642 624,714 312,357 937,071 60%
9.5.2-i) Ground Floor SM 775 770 596,750 436.746 436.746 285,850 16,815 302,665 90%
ii 1st Floor SM 900 770 693,000 117.124 117.124 76,658 4,509 81,167 90%
iii 2nd Floor SM 900 770 693,000 117.124 117.124 76,658 4,509 81,167 90%
iv 3rd Floor SM 900 770 693,000 117.124 117.124 76,658 4,509 81,167 90%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
viii 7th Floor (only 2 coats of Paint Remaining) SM 900 770 693,000 117.124 117.124 76,658 4,509 81,167 90%
ix 8th Floor SM 900 770 693,000 117.124 117.124 76,658 4,509 81,167 90%
x 9th Floor SM 900 770 693,000 117.124 117.124 76,658 4,509 81,167 90%
xi 10th Floor SM 900 770 693,000 117.124 117.124 76,658 4,509 81,167 90%
xii 11th Floor SM 900 770 693,000 117.124 117.124 63,130 9,018 72,148 80%
xii 12th Floor SM 900 770 693,000 117.124 117.124 36,074 18,037 54,111 60%
9.5.3 Same as item 9.5.2 above but Texture Paint as approved in required
number of coats as per manufacturer's instructions.
i) Ground Floor SM 775 962 745,550 1,750.290 1,750.290 1,431,212 84,189 1,515,401 90%
ii) 1st Floor SM 900 962 865,800 1,384.986 1,384.986 1,132,503 66,618 1,199,121 90%
iii) 2nd Floor SM 900 962 865,800 1,384.986 1,384.986 1,132,503 66,618 1,199,121 90%
iv) 3rd Floor SM 900 962 865,800 1,384.986 1,384.986 1,132,503 66,618 1,199,121 90%
v) 4th Floor SM 900 962 865,800 1,384.986 - 1,384.986 532,943 - 532,943 40%
vi 5th Floor SM 900 962 865,800 1,227.486 - 1,227.486 472,337 - 472,337 40%
viii 7th Floor (only 2 coats of Paint Remaining) SM 900 962 865,800 1,073.701 1,073.701 877,965 51,645 929,610 90%
ix 8th Floor SM 900 962 865,800 1,073.690 1,073.690 877,956 51,645 929,601 90%
x 9th Floor SM 900 962 865,800 1,073.701 1,073.701 877,965 51,645 929,610 90%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
xi 10th Floor SM 900 962 865,800 1,384.986 1,384.986 1,132,503 66,618 1,199,121 90%
xii 11th Floor SM 900 962 865,800 1,384.986 1,384.986 932,650 133,235 1,065,885 80%
xii 12th Floor SM 900 962 865,800 1,384.986 1,384.986 532,943 266,471 799,414 60%
i) Ground Floor SM 2,350 770 1,809,500 865.476 865.476 566,454 33,321 599,775 90%
ii) 1st Floor SM 2,675 770 2,059,750 670.380 670.380 438,764 25,809 464,573 90%
iii) 2nd Floor SM 2,675 770 2,059,750 670.380 670.380 438,764 25,809 464,573 90%
iv) 3rd Floor SM 2,675 770 2,059,750 670.380 670.380 438,764 25,809 464,573 90%
v) 4th Floor SM 2,675 770 2,059,750 670.380 670.380 206,477 - 206,477 40%
vi 5th Floor SM 2,675 770 2,059,750 670.380 670.380 206,477 - 206,477 40%
viii 7th Floor (only 2 coats of Paint Remaining) SM 2,675 770 2,059,750 670.380 670.380 438,764 25,809 464,573 90%
ix 8th Floor SM 2,675 770 2,059,750 670.380 670.380 438,764 25,809 464,573 90%
x 9th Floor SM 2,675 770 2,059,750 670.380 670.380 438,764 25,809 464,573 90%
xi 10th Floor SM 2,675 770 2,059,750 670.380 670.380 438,764 25,809 464,573 90%
xii 11th Floor SM 2,675 770 2,059,750 670.380 670.380 361,335 51,619 412,954 80%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
xiii 12th Floor SM 2,675 770 2,059,750 670.380 670.380 206,477 103,239 309,716 60%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
9.5.5 Same as item 9.5.4 above but Texture Paint as approved in required
number of coats as per manufacturer's instructions.
i) Ground Floor SM 2,350 962 2,260,700 3,682.688 3,682.688 3,011,334 177,137 3,188,471 90%
ii) 1st Floor SM 2,675 962 2,573,350 3,610.145 3,610.145 2,952,016 173,648 3,125,664 90%
iii) 2nd Floor SM 2,675 962 2,573,350 3,610.145 3,610.145 2,952,016 173,648 3,125,664 90%
iv) 3rd Floor SM 2,675 962 2,573,350 3,610.145 3,610.145 2,952,016 173,648 3,125,664 90%
v) 4th Floor SM 2,675 962 2,573,350 3,610.145 - 3,610.145 1,389,184 - 1,389,184 40%
vi 5th Floor SM 2,675 962 2,573,350 3,415.455 - 3,415.455 1,314,267 - 1,314,267 40%
viii 7th Floor (only 2 coats of Paint Remaining) SM 2,675 962 2,573,350 3,216.555 3,216.555 2,630,177 154,716 2,784,893 90%
ix 8th Floor SM 2,675 962 2,573,350 3,216.552 3,216.552 2,630,175 154,716 2,784,891 90%
x 9th Floor SM 2,675 962 2,573,350 3,216.555 3,216.555 2,630,177 154,716 2,784,893 90%
xi 10th Floor SM 2,675 962 2,573,350 3,610.145 3,610.145 2,952,016 173,648 3,125,664 90%
xii 11th Floor SM 2,675 962 2,573,350 3,610.145 3,610.145 2,431,072 347,296 2,778,368 80%
xii 12th Floor SM 2,675 962 2,573,350 3,610.145 3,610.145 1,389,184 694,592 2,083,776 60%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
i) Ground Floor SM 200 616 123,200 917.320 917.320 226,028 (0) 226,028 40%
ii) 1st Floor SM 200 616 123,200 303.396 303.396 74,757 - 74,757 40%
iii) 2nd Floor SM 200 616 123,200 303.396 303.396 74,757 (0) 74,757 40%
iv) 3rd Floor SM 200 616 123,200 303.396 303.396 74,757 (0) 74,757 40%
v) 4th Floor SM 200 616 123,200 144.164 79.616 223.780 35,522 19,617 55,139 40%
vi 5th Floor SM 200 616 123,200 - 151.698 151.698 - 37,378 37,378 40%
vii 6th Floor SM 200 616 123,200 - 151.698 151.698 - 37,378 37,378 40%
viii 7th Floor SM 200 616 123,200 303.396 303.396 74,757 - 74,757 40%
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
Sub-Total - - - -
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
Acrylic Finish Counter Top & Coping on Ground Floor GYM (CT1 &
CT3).
12mm thick approved Acrylic solid surface - CT1 & CT3 (Corian - DuPont)
wrapped with approved adhesive on 12mm thick Commercial Ply (Fire
Retardant Paint inner side) for counter top & coping, solignum & Fire Retardant
Paint treated partal wood frame of approved sections (as shown), 50mm x
9.7.2 50mm x 3mm thick M.S. Angel framing for counter support, termite control SM 8 61,965 495,720 - - - - -
treatment, including anti rust epoxy paint on all M.S. Work, edge polishing,
rounded / beveled edges, cutting, curing, cleaning, hacking of existing surface
for bonding where necessary, etc. complete in all respect.
Corian Code # DOVE 2 for CT1 & BLACK QUARTZ 3 for CT3
For payment corian surface area will be measured.
(Refer to Drg, #. I-201a, I-201b, I-602, Detail-42, 43, 44)
R.C.C. Concrete 3000 psi cylindrical strength at 28 days for Columns &
Beam / Upstand (under block masonry) from Existing Pile Beam of any
size including steel reinforcement, formwork, curing, drilling (including
a) for hollow masonry vertical reinforcement also) into Existing RCC
Surface & grouting with FIS EM EPOXY or Equivalent, etc. complete in
all respect. At any level.
Refer To Drawings - Strucutral Drawings MC-01, MC-02
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
ii) Beam / Upstand CM 55 57,629 3,169,595 297.129 173.084 470.213 17,123,247 9,974,658 27,097,905
Guard Room, Guard House & IESCO Room as per drawings &
specifications.
Refer To Drawings - A-542, AD-650, AD-653, AD-655, AD-657, AD-658
a) Solid Block Masonry 150mm thick (Refer to BOQ Item # 9.7.13 a). SM 130 1,726 224,380 40.120 10.034 50.154 69,247 17,319 86,566
b) 12mm thick minimum plaster inner side (Refer to BOQ Item # 9.1.1 A). SM 150 1,290 193,500 63.948 63.948 82,493 - 82,493
c) 20mm thick minimum plaster outside (Refer to BOQ Item # 9.1.1 A). SM 150 2,187 328,050 79.158 79.158 173,119 - 173,119
d) Weather Shield Paint - internal & external (Refer to BOQ Item # 9.5.5). SM 300 729 218,700
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
C). V.Os
Annexure 'A-1-a
Project : Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works) MPL-076 Date : 10-Mar-2023
Engineer: Arshad Shahid Abdullah ((Pvt) Ltd Karachi. Billing Period: From 14-02-2023 to 31-03-2023
VO-1 -
i) -
ii) -
Grand Total - - -
Page 44 of 54
.Mughals Pakistan (Pvt.) Ltd
CONSTRUCTION PROFESSIONALS Annexure 'A-3'
Amounts
Sr. Description of Works Remarks
#
Previous Invoice Current Invoice To date
Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works)
PRICE ADJUSTMENTS CALCULATIONS AS PER S.NO. 5 OF ADDENDUM/RESPONSE TO QUERIES OF MUGHALS PAKISTAN QUERIES SE# 1 (tender submission date is 28-05-2021 so Base price considered dated 01-05-2021 (28 days prior to tender submission)
IPC,s 15days 16days 4days 21days 5days 31days 31days 28 days 31 days IPC # 06 IPC # 07 IPC # 07
Prices for the Month of---- Oct. 2021 Oct. 2021 Nov. 2021 Nov. 2021 Nov. 2021 Dec. 2021 Jan. 2022 Feb. 2022 Mar. 2022 April 2022 May 2022 May 2022
a = Fixed 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Pn = 1.00306 1.00642 1.00642 1.00863 1.00802 1.00802 1.00815 1.00973 1.00842 1.00842 1.00842 1.01662
Work Done (P) = 5,068,642 5,406,551 1,351,638 7,096,098 3,667,762 22,740,126 14,636,529 16,944,349 11,946,538 9,055,897 18,946,283 3,643,516
(PnxP) 5,084,152 5,441,261 1,360,316 7,157,337 3,697,177 22,922,502 14,755,817 17,109,218 12,047,128 9,132,148 19,105,866 3,704,059
Less (P) say Work Done 5,068,642 5,406,551 1,351,638 7,096,098 3,667,762 22,740,126 14,636,529 16,944,349 11,946,538 9,055,897 18,946,283 3,643,516
15,510 34,710 8,678 61,239 29,415 182,376 119,288 164,869 100,590 76,251 159,583 60,543
Escalation/De-escalation 0.306% 0.642% 0.642% 0.863% 0.802% 0.802% 0.815% 0.973% 0.842% 0.842% 0.842% 1.662%
Page 45 of 54
Annexure A-3aPAL
Construction of Sukh Chayn Residence at Plot No. 6, F-10 Markaz, Islamabad (Architectural Works)
IPC,s IPC # 08 IPC # 08 IPC # 08 IPC # 08 IPC # 08 IPC # 09 IPC # 09 IPC # 09 IPC # 10 IPC # 11 IPC # 12 IPC # 13 IPC # 14
Grand Total (26-July-
1st June to 2nd 3rd June to 15th 16th June to 30th 01st July to 14th 15th July to 31st 1st Aug to 15th 16th Aug to 31st 1st Sep to 30 Sep 1st Oct to 31st Oct- 1st Nov to 30th 1st dec to 31st 1st Jan to 14Feb- 14 Feb to 31st Mar- 2021 to 31 Jan-2023
Work done Month----- June 2022 June 2022 June 2022 July 2022 July 2022 Aug 2022 Aug 2022 2022 2022 Nov-2022 Dec-2022 2023 2023
Prices for the Month of---- June 2022 June 2022 June 2022 July 2022 July 2022 August 2022 August 2022 September 2022 1/Oct/22 1/Nov/22 1/Dec/22 1/Jan/23 1/Jan/23
a = Fixed 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.95 0.95
174.89 204.15 263.31 276.54 236.00 244.95 244.44 247.43 235.30 235.30 235.30 235.30 235.30
Current Rate Rs./Ltr. Dn
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.05 0.05
Weighting d
112.55 112.55 112.55 112.55 112.55 112.55 112.55 112.55 112.55 112.55 112.55 112.55 112.55
Base Rate Rs./Ltr. Do
0.0466 0.0544 0.0702 0.0737 0.0629 0.0653 0.0652 0.0660 0.0627 0.0627 0.0627 0.1045 0.1045
d x Dn/Do
Pn = 1.01662 1.02442 1.04018 1.04371 1.03291 1.03529 1.03516 1.03595 1.03272 1.03272 1.03272 1.05453 1.05453
Work Done (P) = 690,849 4,490,518 5,181,367 4,679,945 5,682,790 5,850,452 6,240,482 11,700,903 26,184,118 31,755,554 14,388,357 18,880,333 39,221,660 295,451,256
(PnxP) 702,329 4,600,158 5,389,579 4,884,511 5,869,784 6,056,920 6,459,866 12,121,575 27,040,831 32,794,557 14,859,126 19,909,902 41,360,468 303,566,587
Less (P) say Work Done 690,849 4,490,518 5,181,367 4,679,945 5,682,790 5,850,452 6,240,482 11,700,903 26,184,118 31,755,554 14,388,357 18,880,333 39,221,660 295,451,256
11,480 109,640 208,212 204,566 186,994 206,468 219,384 420,671 856,713 1,039,003 470,770 1,029,569 2,138,809 8,115,331
Escalation/De-escalation 1.662% 2.442% 4.018% 4.371% 3.291% 3.529% 3.516% 3.595% 3.272% 3.272% 3.272% 5.453% 5.453% 2.747%
Page 46 of 54
MUGHALS PAKISTAN (PVT.) LTD. 14 Feb 2023 to 31 Mar 2023
Construction Professionals IPC # 14
Construction of Sukh Chayan Residence at F-10 Markaz Islamabad
Works Which are being Executed by SCV
Work Order Work Done /Payable Amount 15% Amount
S.No DESCRIPTION Remarks
Amount Bill # Amount of Work Done
Sub Contractor
1 Dynamic Enterprises IPC # 01 3,458,010 518,702
Contract # SCV-WO-FW-12
Sub Contractor
Golden Construction & Finishers
2 IPC # 01 1,047,065 157,060
Contract # SCV-WO-FN-
01,05,08,09
Sub Contractor
3 Dynamic Enterprises IPC # 02 3,495,125 524,269
Contract # SCV-WO-FW-013
Sub Contractor
4 Dynamic Enterprises IPC # 01 1,594,718 239,208
Contract # SCV-WO-FW-016
Sub Contractor
5 Dynamic Enterprises IPC # 02 1,437,606 215,641
Contract # SCV-WO-FW-016
Sub Contractor
6 Dynamic Enterprises IPC # 01 967,597 145,140
Contract # SCV-WO-FW-019
Sub Contractor
7 Dynamic Enterprises IPC # 02 808,917 121,338
Contract # SCV-WO-FW-019
Sub Contractor
8 Dynamic Enterprises IPC # 01 1,516,162 227,424
Contract # SCV-WO-FW-020
Sub Contractor
9 Dynamic Enterprises IPC # 01 888,257 133,239
Contract # SCV-WO-FW-021
Sub Contractor
20% Advance
10 Dynamic Enterprises Payments
11,441,850 1,716,278
Contract # SCV-WO-FW-021
Sub Contractor
11 IPC # 03 - -
Alcon International (Façade
30% Advance
13 Garbage Chute Payments
4,131,000 619,650
30% Advance
14 Garbage Chute Payments
729,000 109,350
Sub Contractor
15 Dynamic Enterprises IPC # 03 2,108,665 316,300
Contract # SCV-WO-FW-012
Sub Contractor
16 Dynamic Enterprises IPC # 03 1,376,973 206,546
Contract # SCV-WO-FW-016
Sub Contractor
17 Dynamic Enterprises IPC # 03 553,525 83,029
Contract # SCV-WO-FW-019
Sub Contractor
18 Dynamic Enterprises IPC # 02 1,318,529 197,779
Contract # SCV-WO-FW-020
Sub Contractor
19 Dynamic Enterprises IPC # 02 530,244 79,537
Contract # SCV-WO-FW-021
Sub Contractor
19 MS Ilyas Khan IPC # 01 783,914 117,587
Contract # SCV-WO-FW-034
Sub Contractor
20 MS Ilyas Khan IPC # 02 313,566 47,035
Contract # SCV-WO-FW-034
Sub Contractor
21 MS Ilyas Khan IPC # 01 313,566 47,035
Contract # SCV-WO-FW-035
BOQ Div-
Sr #
Ref Description of Works BOQ Amount (Rs) Remarks
A SUPER STRUCTURE
6 9.3 Division No. 9.3 : Finishes - Skirting, Dado & External Cladding 108,019,775
7 9.4 Division No. 9.4 : Finishes - Stair, Steps and Landings 11,428,320
B BASEMENTS
6 9.3 Division No. 9.3 : Finishes - Skirting, Dado & External Cladding 4,512,979
7 9.4 Division No. 9.4 : Finishes - Stair, Steps and Landings 2,803,805