he double-rodded level circuit is a time-saving leveling technique that Carl Parsons, a party chief from West Virginia, described to me many
T years ago. Since that time, I have been in many suitable situations to use the technique and am now happy to describe it to other surveyors
for their benefit.
In doing research for this article, I have found the best text book reference to this technique in a surveying book entitled Surveying Theory and
Practice, by John Clayton Tracy Ph.D., C.E. (1947 by John Wiley & Sons, Inc.). In his description of the procedure Mr. Tracy provides an alternate
name, "Double-Line Leveling," which is a more accurate description of the technique because the procedure does not employ two rods as the
more common name, the one that I have heard, implies. Mr. Tracey also provides two note forms for taking notes with the technique that are
different than what I am showing in this article; the note form in this article appears to be the simplest to use and understand.
Basically, this leveling procedure involves running two separate level circuits between two points and keeping notes for both simultaneously. This
involves setting two sets of turning points in pairs. There must be a minimum vertical distance of one foot (or meter) between each pair. In
Figure A the pairs of turning points are shown horizontally separated for clarity, when in reality in the field they would be set very close together
horizontally while maintaining a minimum vertical separation.
Like anything, the technique has its advantages and disadvantages. The advantages to a double- rodded leveling are:
Twice as much work can be accomplished in approximately the same amount of time with little extra effort because two lines of levels are
being run at the same time.
Most common "busts" in leveling can be immediately detected and corrected as the work progresses because two separate instrument
elevations are kept in the field book and they should be approximately the same value all the time.
Step One
In our example (Figure A), the level is set up at Instrument Point 1, and a foresight reading of 4.25 is taken at Turning Point 1 High and is
recorded in the field book as shown in Figure B. The rod man then goes to the known point "A," and a backsight rod reading of 4.10 is taken and
recorded as shown in Figure B.
The instrument man then changes the position of the level vertically. Another backsight reading of 4.02 is then taken on the rod at the known
point and recorded. The rod man then moves to Turning Point 1 Low, and a foresight reading of 5.60 is taken and recorded (Figure B).
Step Two
The level is then moved to Instrument Point 2, a backsight reading of 3.75 is taken and recorded on Turning Point 1 High, and a backsight reading
of 5.18 is taken on Turning Point 1 Low. This gives us an instrument elevation on 103.60 on both the high and low sets of turning points.
The rod man then goes to the second set of turning points. A foresight reading of 3.89 is taken and recorded on Turning Point 2 High, then a
foresight reading of 5.03 is taken and recorded on Turning Point 2 Low. This gives us elevations of 99.71 and 98.57 respectively (Figure B).
Step Two is repeated through as many pairs of turning points as required through the entire length of the level circuit.
The instrument man then changes the position of the level vertically. A foresight reading is then taken and recorded on Unknown Point "B." The
rod man then moves to Turning Point 3 Low, and a backsight reading of 3.22 is recorded. This gives us a level elevation of 101.27 from the low
set of turning points and an elevation of 97.14 on Unknown Point "B" (Figure B).
To achieve an adjusted elevation for Point "B," the elevation from the high set of turning point is averaged with the elevation from the low set of
turning points, giving us an average elevation of 97.13 for Point "B." It would be possible to run a double-rodded level circuit using three wire
leveling, but I have never had cause to do so. To be successfully done, a three-wire level circuit by the double-rodded method would require
software that would process the data in the field as the work progresses. I am absolutely certain that the new digital laser scanning levels could
https://archives.profsurv.com/magazine/article.aspx?i=2118 1/2
05/01/2021 Double-Rodded Level Circuits Explained
very successfully do double-rodded level circuits, but their data collection and processing capabilities would have to be programmed by the
manufacturers to do so. The reader is invited to test and experiment with this method.