Op-3-74. Checklist For Pull Out Test (Soil Nail) : Work Instructions For Engineers
Op-3-74. Checklist For Pull Out Test (Soil Nail) : Work Instructions For Engineers
Op-3-74. Checklist For Pull Out Test (Soil Nail) : Work Instructions For Engineers
LST
Compiled by : _____________________________________
CCM
Checked by : _____________________________________
LSS
Approved by :_____________________________________
CHECKED BY
No. CHECKLIST ITEMS G&P ENGINEER
1.0 NAIL INFORMATION
Type of pull-out test: Preliminary (Verification test)/Working (Proof test)*
* delete wherever not applicable
Nail ID/Location: _____________________
1.1 Length: ____ m (minimum 3m of bonded length)
Design Test Load: ______ kN
Load Cycle: ______ cycles
The contact face should be even and perpendicular to the soil nail
position.
Visually align the dial gauges to be parallel with the axis of test
nail. Sometimes, alignment load (<5% of design test load) is
4.6
required to align the testing apparatus. Dial gauges should be set
to ‘zero’ after the alignment load has been applied.
Check whether the soil nail is in contact with the abovementioned
4.7
seating base. (please refer to Figures below)
Are the adopted pressure gauge, load cell, dial gauges, datalogger (if
4.8 any) similar with the submitted calibration certificates to the consultant?
Check the serial no of the measuring devices prior to start monitoring.
Check and record the seating of the dial gauges and the direction
of the dial gauges’ readings during loading and unloading. This is
4.9 to confirm the reading corresponding to tensile or compression
nail movement. This is important when corrections are necessary
during results interpretation.
5.1 Did testing follow loading sequence and its holding period?
Take and record readings before and after load increment/decrement
and record all necessary info. Actual readings of load cell and pressure
5.2
gauge shall be recorded, not the calculated values from the loading
schedule. Refer to Soil Nail Field Record Sheet.
Check the following critical movement:
a) For preliminary pull-out test, 0.8 times steel characteristic strength:
5.3 b) For working pull-out test, creep test (1.5 times working load):
The load during the creep test shall be maintained within 2% of the
intended load by use of the load cell.
For creep test, is the nail movement more than 1mm within the holding
periods of 1 to 10 minutes? If yes, extend to total of 60 minutes and
monitor the movement and check whether more than 2mm in total.
Measure nail movement at 1,2,3,5,6,10,20,30,50 and 60 minutes
5.4 during creep test.
Section: OP-3-74
G&P GEOTECHNICS SDN BHD
Revision: 0
Date: 12-3-2007
CHECKLIST FOR PULL OUT TEST (SOIL NAIL) Page 4 of 5
Note: The abovementioned practice should be prohibited as it will produce false result.
Section: OP-3-74
G&P GEOTECHNICS SDN BHD
Revision: 0
Date: 12-3-2007
CHECKLIST FOR PULL OUT TEST (SOIL NAIL) Page 5 of 5