CRS - WPK - TEG-Node 11
CRS - WPK - TEG-Node 11
CRS - WPK - TEG-Node 11
FOR ENGINEERING:
Refer to shapshot/typical below, the socket is installed
offshore. Please advise and check also to other
handrail installed offshore
General comment: All sockets/starters for handrails are to be installed in
Lynge,
TEG Node 11 335543 yard. The 3d model show some to be installed offshore - This wrong. Iqbal-Structural To be Confirm
Glenn
Specific examples are provided below.
Madsen, Details about this Pipe Support to be included in the Piping section and
TEG Node 11 335189 Gusyahri-Piping To be Confirm 10 MDR HU will advise to MDR Engineering
Lars-Ole drawing to be included in the appendix.
Madsen,
TEG Node 11 335190 Drawing to be included in appendix Gusyahri-Piping To be Confirm 11 MDR HU will advise to MDR Engineering
Lars-Ole
This big structure is indicated as offshore work in the 3d model but not
Lynge,
TEG Node 11 335512 included in this document. The target must be to install it in the yard . I.e. Gusyahri-Piping To be Confirm 13 MDR HU will advise to MDR Engineering
Glenn
move it to a location outside the exclusion zone.
Lynge, Gusyahri-
TEG Node 11 335513 Why is the DD line included? Its not CRA. Implement (ed) 17 Noted, Will Revise in next Submission
Glenn Piping
Madsen, Screen shot showing the location of all temporary support to be included.
TEG Node 11 335152 Gusyahri-Piping To be Confirm 18 MDR HU will advise to MDR Engineering
Lars-Ole Similar to Tyra East Node 8 package.
Madsen, The parts of the bottom walkway are stored at TEC
TEG Node 11 335509 Where are the parts stored? Iqbal-Structural CLOSE 20
Lars-Ole Level 1 as mentioned in the activity TE-11-5.3.3.
Madsen, The parts of the top walkway are stored at TEC Level
TEG Node 11 335511 Where are the parts stored? Iqbal-Structural CLOSE 20
Lars-Ole 3 as mentioned in the activity TE-11-5.3.6.
Lynge,
TEG Node 11 335514 To be stored on bridge close to final location Iqbal-Structural CLOSE 21 Noted. It will be incorporated in the next revision
Glenn
Lynge,
TEG Node 11 335515 To be stored on bridge close to final location Iqbal-Structural CLOSE 21 Noted. It will be incorporated in the next revision
Glenn
MDR HU will discuss with Engineering
FOR ENGINEERING:
Refer to shapshot/typical below, the socket is installed
offshore. Please advise and check also to other
handrail installed offshore
Lynge,
TEG Node 11 335516 Sockets to be installed onshore. Iqbal-Structural To be Confirm 31
Glenn
Project Code: N0510
Project Title: EPC CONTRACT FOR TYRA REDEVELOPMENT PROJECT TEG
Document Title: Master Comment WPK
FOR ENGINEERING:
MDR HU will clarify the comment with Company for
clear understanding.
For other case/handrail offshore installed, it is found in
3D the socket installed offshore. Refer to snapshot
below. Please advise
Lynge, All sockets to be installed from yard - current 3d model show some
TEG Node 11 335517 Iqbal-Structural To be Confirm 42
Glenn sockets as offshore scope.
Lynge, How will this socket be installed - the structure does not leave room a
TEG Node 11 335525 Iqbal-Structural To be Confirm 42
Glenn socket.