Project Code: N0510

Project Title: EPC CONTRACT FOR TYRA REDEVELOPMENT PROJECT TEG


Document Title: Master Comment WPK

Comment Discussion Page MDR Eng


Facility Area Node No. Reviewer Comment Review Response HU MDR Comment Response Chennai Eng to Confirm COMPANY Response
ID Status No. Status

General comment: All starter brackets for E&I equipment shall be


Noted. MDR HU to advise MDR Engineering to add
Lynge, installed from yard - the drawings shows in many cases that the starters
TEG Node 11 335542 General To be Confirm note in the drawing all starter bracket for the hook-up
Glenn are offshore welded. This is wrong. Some specific examples are included
support to be confirm welded at yard
below.
MDR HU will discuss with Engineering

FOR ENGINEERING:
Refer to shapshot/typical below, the socket is installed
offshore. Please advise and check also to other
handrail installed offshore
General comment: All sockets/starters for handrails are to be installed in
Lynge,
TEG Node 11 335543 yard. The 3d model show some to be installed offshore - This wrong. Iqbal-Structural To be Confirm
Glenn
Specific examples are provided below.

Madsen, Details about this Pipe Support to be included in the Piping section and
TEG Node 11 335189 Gusyahri-Piping To be Confirm 10 MDR HU will advise to MDR Engineering
Lars-Ole drawing to be included in the appendix.
Madsen,
TEG Node 11 335190 Drawing to be included in appendix Gusyahri-Piping To be Confirm 11 MDR HU will advise to MDR Engineering
Lars-Ole
This big structure is indicated as offshore work in the 3d model but not
Lynge,
TEG Node 11 335512 included in this document. The target must be to install it in the yard . I.e. Gusyahri-Piping To be Confirm 13 MDR HU will advise to MDR Engineering
Glenn
move it to a location outside the exclusion zone.
Lynge, Gusyahri-
TEG Node 11 335513 Why is the DD line included? Its not CRA. Implement (ed) 17 Noted, Will Revise in next Submission
Glenn Piping
Madsen, Screen shot showing the location of all temporary support to be included.
TEG Node 11 335152 Gusyahri-Piping To be Confirm 18 MDR HU will advise to MDR Engineering
Lars-Ole Similar to Tyra East Node 8 package.
Madsen, The parts of the bottom walkway are stored at TEC
TEG Node 11 335509 Where are the parts stored? Iqbal-Structural CLOSE 20
Lars-Ole Level 1 as mentioned in the activity TE-11-5.3.3.
Madsen, The parts of the top walkway are stored at TEC Level
TEG Node 11 335511 Where are the parts stored? Iqbal-Structural CLOSE 20
Lars-Ole 3 as mentioned in the activity TE-11-5.3.6.
Lynge,
TEG Node 11 335514 To be stored on bridge close to final location Iqbal-Structural CLOSE 21 Noted. It will be incorporated in the next revision
Glenn
Lynge,
TEG Node 11 335515 To be stored on bridge close to final location Iqbal-Structural CLOSE 21 Noted. It will be incorporated in the next revision
Glenn
MDR HU will discuss with Engineering

FOR ENGINEERING:
Refer to shapshot/typical below, the socket is installed
offshore. Please advise and check also to other
handrail installed offshore

Lynge,
TEG Node 11 335516 Sockets to be installed onshore. Iqbal-Structural To be Confirm 31
Glenn
Project Code: N0510
Project Title: EPC CONTRACT FOR TYRA REDEVELOPMENT PROJECT TEG
Document Title: Master Comment WPK

Comment Discussion Page MDR Eng


Facility Area Node No. Reviewer Comment Review Response HU MDR Comment Response Chennai Eng to Confirm COMPANY Response
ID Status No. Status

MDR HU will discuss with Engineering.

FOR ENGINEERING:
MDR HU will clarify the comment with Company for
clear understanding.
For other case/handrail offshore installed, it is found in
3D the socket installed offshore. Refer to snapshot
below. Please advise
Lynge, All sockets to be installed from yard - current 3d model show some
TEG Node 11 335517 Iqbal-Structural To be Confirm 42
Glenn sockets as offshore scope.

MDR HU will discuss with Engineering

FOR ENGINEERING : on 3D there is no bar for


supporting Removable Handrail.Please advise

Lynge, How will this socket be installed - the structure does not leave room a
TEG Node 11 335525 Iqbal-Structural To be Confirm 42
Glenn socket.

Current 3d model shows light fixtures (LE-180077, 180078), flood light


Lynge, (LN-190008) and instrument stand (180003)on top of TEC close to the They are was included in the node-9 tyra east
TEG Node 11 335526 Tijo-E_I&T Implement (ed) 46
Glenn bridge as offshore scope but they are not included in this package - what package-3.
is correct?
Lynge, Why is the offshore hook up part of this tray so large - the hook up point
TEG Node 11 335527 Tijo-E_I&T To be Confirm 48 MDR HU will advise to MDR Engineering
Glenn should be closer to the exclusion zone to optimize offshore work.

The Lighting fixtures TECZ-LN-181223 was included


Lynge, Current 3d model shows light fixtures LN-181223 to be offshore scope
TEG Node 11 335528 Tijo-E_I&T Implement (ed) 52 in the activity no. TE-N11-6.2.9 : Installation of The
Glenn but its not included in this package - what is correct?
Normal Lighting fixtures please refer to page 54.
Lynge, JB should be moved outside exclusion zone to avoid additional work
TEG Node 11 335529 Tijo-E_I&T To be Confirm 53 MDR HU will advise to MDR Engineering
Glenn onshore and offshore
Lynge, PA should be moved outside exclusion zones to reduce work onshore
TEG Node 11 335530 Tijo-E_I&T To be Confirm 67 MDR HU will advise to MDR Engineering
Glenn and offshore.
Madsen,
TEG Node 11 335188 Blinds for shielding gas and boroscope inspection not showed on P&ID's. Gusyahri-Piping To be Confirm 68 MDR HU will advise to MDR Engineering
Lars-Ole
Lynge,
TEG Node 11 335531 FFW is missing Gusyahri-Piping To be Confirm 83 MDR HU will advise to MDR Engineering
Glenn
Lynge,
TEG Node 11 335532 Please include FFW Gusyahri-Piping To be Confirm 84 MDR HU will advise to MDR Engineering
Glenn
Lynge,
TEG Node 11 335533 FFW is missing Gusyahri-Piping To be Confirm 86 MDR HU will advise to MDR Engineering
Glenn
Lynge, This spool is not in the exclusion zone and should be installed onshore.
TEG Node 11 335534 Gusyahri-Piping To be Confirm 88 MDR HU will advise to MDR Engineering
Glenn Offshore work should be minimized.
Madsen,
TEG Node 11 335157 FFW is missing Gusyahri-Piping To be Confirm 89 MDR HU will advise to MDR Engineering
Lars-Ole
Madsen, Is this a FFW?
TEG Node 11 335158 Gusyahri-Piping To be Confirm 96 MDR HU will advise to MDR Engineering
Lars-Ole Only one FFW required.
Project Code: N0510
Project Title: EPC CONTRACT FOR TYRA REDEVELOPMENT PROJECT TEG
Document Title: Master Comment WPK

Comment Discussion Page MDR Eng


Facility Area Node No. Reviewer Comment Review Response HU MDR Comment Response Chennai Eng to Confirm COMPANY Response
ID Status No. Status

Madsen, Is this a FFW?


TEG Node 11 335168 Gusyahri-Piping To be Confirm 98 MDR HU will advise to MDR Engineering
Lars-Ole Only one FFW required.
Is this a FFW?
Madsen,
TEG Node 11 335169 Only one FFW required. Gusyahri-Piping To be Confirm 103 MDR HU will advise to MDR Engineering
Lars-Ole
Madsen, Is this a FFW?
TEG Node 11 335172 Gusyahri-Piping To be Confirm 108 MDR HU will advise to MDR Engineering
Lars-Ole Only one FFW required.
Madsen, Different colors for each activity when several activities on the same
TEG Node 11 335186 Iqbal-Structural CLOSE 126 Noted. It will be incorporated in the next revision
Lars-Ole drawing.
Lynge, How will this socket be installed - the structure does not leave room a It is same as Comment 335525. MDR will discuss with
TEG Node 11 335535 Iqbal-Structural To be Confirm 153
Glenn socket. Engineering.
Børresen, Platform Cranes is supposed to be terminated and tested at yard, no Noted. Splicing kits only required, to be update in the
TEG Node 11 335536 Tijo-E_I&T CLOSE 157
Peter cable lugs should be needed. next revision
Noted. MDR HU to advise MDR Engineering to add
Lynge,
TEG Node 11 335537 All starter brackets to be installed at yard - drawing is wrong. Tijo-E_I&T To be Confirm 168 note in the drawing all starter bracket for the hook-up
Glenn
support to be confirm welded at yard
According to Mr. Achanta there is a new design for Nav Aid with interface
Børresen,
TEG Node 11 335538 JB's on TEC please include drawings for TEB and TEE, these cables will Tijo-E_I&T CLOSE 189 Noted. To be update in the next revision
Peter
have to be uncoiled at this node.
Noted. MDR HU to advise MDR Engineering to add
Lynge,
TEG Node 11 335539 All starter brackets to be installed from yard. The drawing is wrong. Tijo-E_I&T To be Confirm 192 note in the drawing all starter bracket for the hook-up
Glenn
support to be confirm welded at yard
Noted. MDR HU to advise MDR Engineering to add
Madsen,
TEG Node 11 335187 Øgland starter to be welded at Yard. (Typical comment for all drawings) Tijo-E_I&T To be Confirm 208 note in the drawing all starter bracket for the hook-up
Lars-Ole
support to be confirm welded at yard
Børresen, Data network cables is fibre optic, termination materials is to be included
TEG Node 11 335540 Tijo-E_I&T CLOSE 211 Noted. Cable pigtails was included in the MTO
Peter in MTO, not cable lugs.
Børresen,
TEG Node 11 335541 Drawing to be updated with tag no's according to "hold List" Tijo-E_I&T CLOSE 225 Noted. To be update in the next revision